Foot Over Bridge Status at Beleghata Metro Station | Kolkata Metro Orange Line Update

Поделиться
HTML-код
  • Опубликовано: 26 янв 2025

Комментарии • 28

  • @indianrailwayslover375
    @indianrailwayslover375  Месяц назад +2

    Please Subscribe to my RUclips Channelm

    • @suvadipdhara4121
      @suvadipdhara4121 Месяц назад

      Since you make videos on infrastructure for metro rail, a humble request to you ,for any sections of any line which is currently under construction to request metro authorities to build such kind of foot over bridges with escalator facilities which would allow Senior Citizen and any one suffering from any kind of leg or knee to access the metro facility, Its a humble request to you since you come in contact to some authorities , it would be great if you could convey them this message , I have seen many elderly struggle to climb these metro stairs. Thank you 🙏

  • @parthasarathikundu2180
    @parthasarathikundu2180 Месяц назад +15

    These are not hurdles,these are just excuses to delay and non co operation, an FOB will hardly take a month's traffic pain!

    • @probalchatterjee5610
      @probalchatterjee5610 Месяц назад +3

      exactly. if there is some function of ruling party..then traffic block approval will be given within hours.
      but if something is being built for common people then .approval will come only before election.

    • @mrinalpatra3980
      @mrinalpatra3980 Месяц назад +1

      Unless Nir Mamata Bano’s Totally Mollah Congress is uprooted from Bengal, there will be no transformative changes in Bengal.

  • @arupsarkar8487
    @arupsarkar8487 Месяц назад +2

    Work is going... but slowly...😀

  • @rohansahoo9554
    @rohansahoo9554 Месяц назад +2

    That steel bridge will be placed as FOB

  • @princesourya3980
    @princesourya3980 Месяц назад +4

    That steel bridge is itself the fob which is being assembled. Once ready to roll, the block will be taken in a single night.
    That steel bridge is to divert traffic? Lol 😂😂

    • @indianrailwayslover375
      @indianrailwayslover375  Месяц назад +1

      @@princesourya3980 I don't think the steel bridge will be a FOB as this bridge will not help in crossing EM Bypass road to the other side to reach Metropolitan area. This can be used as a service lane in future but a complete FOB over the EM Bypass road is required.

  • @Fly_by_optics
    @Fly_by_optics Месяц назад +1

    Aur bhaiya puri kyasa ghuma aapne?

  • @edgxX_yt
    @edgxX_yt Месяц назад +2

    Kam se Kam Beleghata se Pehele tak Operational Kar Dena Chahiye tha 😢

  • @souvikhalder1510
    @souvikhalder1510 Месяц назад +1

    why they are not going to court?

  • @ritabratabhattacharya1433
    @ritabratabhattacharya1433 Месяц назад +4

    My fair guess this steel bridge would be the FOB... otherwise what is the purpose to build another steel bridge??

    • @sanjoysaha3228
      @sanjoysaha3228 Месяц назад

      Road is much wider than that and the steel structure is placed on concrete base. The fob may need a pillar in between

  • @pallabbagchi2006
    @pallabbagchi2006 Месяц назад +2

    Lsgta nahi March 25 tak complete hoga..
    Ek ke baad ek deadline miss karega RVNL..
    Kolkata Police abtak kavi vi sahi se co-operate nahi kiya hai unlogo ko ..

  • @ChiNakPradChiragPradhan
    @ChiNakPradChiragPradhan Месяц назад +1

    Dada workers se puchiye ki kya aisa nahi ho sakata kya hi metro barun sengupta tak hi chale aur bas track reverse Beleghata me kare if barun sengupta has no crossover or track reversal tech as in between hemanta Mukhopadhyay and vip bazaar

  • @nakshsinghania9342
    @nakshsinghania9342 Месяц назад +4

    And after FOB is done that bridge will be demolished made to divert??

  • @ruprajsengupta2920
    @ruprajsengupta2920 Месяц назад +2

    The new so called bridge is directly in front of the ramp for wheelchair ♿ deliberately done.

  • @sudiptokarati4148
    @sudiptokarati4148 Месяц назад

    Foot over bridge kab se Start hoga???

  • @edgxX_yt
    @edgxX_yt Месяц назад +1

    4:48 Mtlb or 1 saal lag jayega Operational hote hote 😢

  • @nakshsinghania9342
    @nakshsinghania9342 Месяц назад +1

    Bahut 5:15 slow

  • @satrap299792458
    @satrap299792458 Месяц назад +7

    This is just an excuse for delaying work

  • @soumyamal72
    @soumyamal72 Месяц назад

    One year se same hai

  • @minatimurmu9798
    @minatimurmu9798 Месяц назад +2

    No progress no nothing

  • @notpotato666
    @notpotato666 Месяц назад +1

    Kabhi complete nhi hoga

  • @tukaidas1272
    @tukaidas1272 Месяц назад +2

    The steel bridge was fob bro they put on khal not infront of station after traffic block that steal will be shifted to as fob