Hi, this has been installed to NFSG specification. We have buried the cable to the correct depth required and even put the 8mm microduct in ducting. Using the ducting is not even required as per the specification as the microduct is reinforced so can be direct buried. We have used riserguard, ensured both the riserguard and omnibox is level, as well as ensuring the fibre is dressed and labelled correctly inside the omnibox and cabinet. Then we have ensured the light levels are correct, the PON ID matches and that the fibre is clean. Hope you have a great day :)
I start training next week with Circet as a Telecommunications Engineer, really enjoying the videos ! Keep up the content bud
Lush one love x
Think u forgot to add the voice over and music andy 😮
Next video I promise
@ lushy lush x
Ah, yes, the shit install of virgin media cable , one day might do it right 😂
It's only an optical cable. If it was gas/water/electricity I would understand your point. 👍
Hi, this has been installed to NFSG specification. We have buried the cable to the correct depth required and even put the 8mm microduct in ducting. Using the ducting is not even required as per the specification as the microduct is reinforced so can be direct buried. We have used riserguard, ensured both the riserguard and omnibox is level, as well as ensuring the fibre is dressed and labelled correctly inside the omnibox and cabinet. Then we have ensured the light levels are correct, the PON ID matches and that the fibre is clean.
Hope you have a great day :)