Cast In Place Concrete in Aluminum Formworks

Поделиться
HTML-код
  • Опубликовано: 3 фев 2025

Комментарии • 14

  • @tealkerberus748
    @tealkerberus748 11 месяцев назад

    It would be interesting to see the curing process as well. So many builders seem to just strip the forms off 24 hours later and call the job done, where concrete needs to be kept damp for at least 28 days to develop close to its full strength.

  • @黄金のドラゴン-n9p
    @黄金のドラゴン-n9p 8 месяцев назад

    What class concrete mix you used for cast in place wall? That is non load bearing.

  • @EditoJrAlinsoot
    @EditoJrAlinsoot 13 дней назад

    ask lang po, ano po naging dimention ng stem wall nyo po? thank you po

  • @aedworkx4037
    @aedworkx4037 Месяц назад

    Hello sir, ilang psi po ang strenght ng concrete nya? Thanks po

  • @sholehudin6548
    @sholehudin6548 Год назад

    is this build all cast...I'm from Indonesia

  • @bengskichannel4127
    @bengskichannel4127 2 года назад +1

    Mabilis ang paggawa

  • @roneelgenesisdalagan4950
    @roneelgenesisdalagan4950 10 месяцев назад

    Hi. Ang aluform made po ba na house is hindi pre-casted?

  • @PoelD.
    @PoelD. 2 года назад

    Uy matibayyy

  • @reymarkbelison9959
    @reymarkbelison9959 2 года назад

    Boss tumatanggap paba kayo installer

  • @mamyclang
    @mamyclang 2 года назад +1

    ask ko lang po kung saan supplier niyo po nakuha ung mga formworks :) thank you po

  • @reymarkbelison9959
    @reymarkbelison9959 2 года назад

    Baka pwede po mag apply installer po ako