NTPC Barh (Patna) Full View | Super Thermal Power Plant 3300Mw | Bihar | From Barh | Subscribe Like

Поделиться
HTML-код
  • Опубликовано: 21 окт 2024

Комментарии • 9

  • @aamireqbal1199
    @aamireqbal1199 Год назад

    I have done vocational training in 2011 at that time Bhel stage two boilers were construction going on and each boiler have capacity of 660 MEGAWATTS productions of electricity and five boiler 3300 Megawatts total capacity of barh thermal power plant and DM water plant is also installed to clean all the carbonate ion sulphate ion pohasphate ion acidic ion basic ion and this water is introduced inside the super crritical boiler tubes where tanganically firing if coal takes places and more heat is generated inside the boiler and the flue gas is taken out by ELECTROSTATICS PRECECIPERATOR ESPECIALLY for pollutants that are not reased inside the atmosphere directly according to international environment law.its work on the prinple of RANKING CYCLE

  • @kadirsmartyvlog6511
    @kadirsmartyvlog6511 Год назад

    Bhai aap se ek baat puchna ntpc work liye bata sakte h

  • @एकविराभक्तमिलिंद

    Affan Mera friend hai

  • @sudhakerraj9530
    @sudhakerraj9530 4 месяца назад

    Number diya huya hai hi nahi

  • @sudhakerraj9530
    @sudhakerraj9530 4 месяца назад

    Isme job kaise milega