Officials inspect newly constructed Chenab Rail Bridge, world's highest
HTML-код
- Опубликовано: 15 июн 2024
- Railway officials conducted an extensive inspection of the newly constructed Chenab Rail Bridge - the world's highest railway bridge - built between Sangaldan in Ramban district and Reasi. Rail services on the line will start soon.
---------------------------------------------------------------------------------------------
Exclusive content, special privileges & more - Subscribe to ThePrint for Special benefits: theprint.in/subscribe/
---------------------------------------------------------------------------------------------
Connect with ThePrint
» Subscribe to ThePrint: theprint.in/subscribe/
» Subscribe to our RUclips Channel: bit.ly/3nCMpht
» Like us on Facebook: / theprintindia
» Tweet us on Twitter: / theprintindia
» Follow us on Instagram: / theprintindia
» Find us on LinkedIn : / theprint
» Subscribe to ThePrint on Telegram: t.me/ThePrintIndia
» Find us on Spotify: spoti.fi/2NMVlnB
» Find us on Apple Podcasts: apple.co/3pEOta8
Historic moment... Much congratulations to Indian railways
Great news. Congratulations to Indian Railways
It's spectacular infrastructure happened in this decade which is an engineering marvel, and a game changer in enhancing the connectivity.
Hmmm😂😂😂😂
Without a complete train, we will not be to truly appreciate the grandness of this beautiful bridge.
Congratulations to India and Railways
Congratulations to Indian Railways 🎉🇮🇳
Engineering marvel, well done bharatvasi🙂🇮🇳🙏
Engineering Marvel India 🇮🇳
Great news. Congrats
Bjp built iit ,iim , bridges in jammu and kashmir wheras congress gave article 370 to jammu and kashmir. See the difference
Still nobody vote for BJP.😮😮😮
@@sauron2000000Jammu gives them two seats.
Yes before 2014 there were no trains in India. People used to travel by bullock cart.
You really have a reason for celebrating.
@@SOUVIK_RAY_ I was born in 1982. We used to walk 1000s of Km back then. Through dense forests😆😆😆😆
Remarkable infrastructure Modi ji unbelievable, I have no words to express our expertise in building this connectivity
Thank you BJP
उत्तर प्रदेश की जनता ने बीजेपी को क्यों नहीं चुना?
हम केरल के लोग समझते हैं कि श्री मोदी और योगी ने पिछले 10 वर्षों में अन्य राज्यों के विकास की तुलना में अच्छा विकास किया है। लोगों के लिए सड़क, रेल और वायुमार्ग, आईआईएम, आईआईटी, अस्पताल, बीमा, मुफ्त दवा, मुफ्त राशन, आवास सुविधाएं, गैस कनेक्शन, पानी कनेक्शन का विकास उनमें से कुछ हैं। सरकार ने महिलाओं और बच्चों की सुरक्षा और शिक्षा के लिए और भी योजनाएं लागू कीं, माफियाओं पर नियंत्रण किया, राम मंदिरों का निर्माण किया, काशी विश्वनाथ कॉरिडोर, गौ संरक्षण योजना बनाई।
हम समझते हैं कि लोग विकास से ज्यादा महत्व जाति व्यवस्था को देते हैं. विपक्षी दलों ने लोगों को गलत जानकारी दी.
मैं किसी भी राजनीतिक दल का सदस्य नहीं हूं लेकिन श्री मोदी और योगी ने पिछले 10 वर्षों में अच्छा प्रदर्शन किया है।
यह कहते हुए दुख हो रहा है कि यूपी की जनता ने धर्म, जाति व्यवस्था और विपक्षी दलों के प्रलोभनों और गलत जानकारी के कारण भाजपा को धोखा दिया और हरा दिया।
भारत में हर कोई सोचता है कि विकास से ज्यादा महत्वपूर्ण जाति व्यवस्था है. वे जाति व्यवस्था के आरामदायक क्षेत्र में हैं और इसके लाभों का आनंद ले रहे हैं।
लोग जाति व्यवस्था की दीवार से कब बाहर निकलेंगे?
सुरक्षित, समृद्ध और अतुल्य भारत दीर्घायु हो।
केरल राज्य की ओर से शुभकामनाएँ।
Bas karo, modiji aur bjp ne apni jeb se nahin banaya hai.
isk kaam 2004 se chal raha hai.
Project started way before BJP, and andhbakht praising Modi. This is what is wrong with our country. Millions are brainwashed by PR instead of education & common sense.
2002 se
Indian Railway zindaabad in Darjeeling.
Bharat mata ki jai. Thanks, Sri Modi and BJP! Well n truly remarkable!
Great news.
I can state with full confidence that had the UPA been in power for the last 10 years, this project would have made negligible progress.
How do you know? Aren't you aware that Kashmir valley railway was completed and inaugurated during UPA rule? Of course the section connecting valley to Jammu across the Pir Panjal was far more technically challenging and expensive, so it would have taken longer time.
Congress couldn't build a bridge on ravi or jhelum in 50 yrs. It started in 1950s.
@@vineethg6259 It was plain region so it was easy to build it there.
@@shaksham.22 It wasn't "easy" to build. All the construction material, locomotives and coaches had to be transported on trucks via mountainous roads that were blocked by landslides and snow for half of the year.
@@vineethg6259 dude i know that. I used to live there when my father was posted. Would see the engine shell or coaches by roadside while travelling between jammu and anantnag but that doesnt mean it was impossible. This project was delayed because of railwYs internal issues
Great👍👏😊
Looks like there is only one track in the Chenab bridge. Anyone knows what’s the reason why there are no 2 or more tracks? I understand there must be some reason on design or safety aspects but I’m curious to know.
less potential traffic
@@navaneeth1087 I don’t think the reason is due to traffic. In future, the traffic may go high. At that time, the train on either side may need to wait for long to cross the bridge.
@@apoorvsharma651 they did the traffic study, already project have negative ROI.This is a strategic project, not a commercial one.
the traffic will be low
Thanks guys for the info.
Helmet kaha hai.. a lot of technician seems to be standing on roof of train, without any safety gear.
This will give severe heartburn
to Left - Liberal ecosystem 😢
They will instead say wasteful expenditure, better spend Katta Katta doles😂
Why?
I am left-leaning and wholeheartedly liberal but still appreciate such infra projects.
You have Google. Then decide whom to credit and whom to not. Rest it is really a marvelous infrastructure in India.
@@pichumanisankar2617
//14 lakh crore Corporate loan waiver by BJP.//
Whose money? It is yours/mine GST.
When you are throwing money to Corporates, there is no point in blaming poverty alleviation by Khata Khat.
My heart goes When I see Migrant labours with their mal-nutritioned wife & babies sleeping on Railway platform in search of work in big Cities
Milestone in infrastructure, unfortunately Kashmir did not give even single vote to bjp… communal people
BJP did not contest in J & K in 2024 I suppose
@@himanshusoni528 Even if they wouldn't be getting a single vote..
For Muslims their ideology is bigger than the development...They made a terrorist Eng. Rashid win the election who is the jail on UAPA charges.
Vote kahan se dete jab ladne ka dum hi nhi tha yahan
@@shoaib349 haa kyuki tum jeso ko koi lallu bhi agr allh hu akbr bol de toh use vote dedoge,jisne ghar diya use haraoge...
Did Kashmiris even ask for this? Why should you feel gratitude for someone who gave you something you did not need and did not request for?
Marvelous job by Bharat.
Thanks Modi team
The project was started under Congress time in 2009.
@@alileevil No. Please check the facts. The project was approved by the Vajpayee government in 2003. Later, Mounamuni Manmohan government has set aside the project by label not viable. In 2015 the Modi government revived it and completed. credit goes to BJP.
@@tirupathiraokarpurapu2264 Actually the project was only declared a National project in 2002, but was on the books long before that. But under Congress is when the construction 1st started in 2004. It was then stopped due to safety concerns, and restarted in 2009. For more details on the project look up Udhampur-Srinagar-Baramulla Rail Link Project which was started in 1995-96
@@alileevil Blatant lies. Congress never started this project.
One ecosystem is now prevalent in the country to spread false news under Rahul systematically.
Even God also cannot handle these ecosystems now.
Engineering marvel ❤
Great
Why did they not make the bridge for dual tracks plus some road traffic? May be build another one later?
mainly due to volatile environs.
Low Traffic...this route is built because of Strategic importance but not commercially viable...
@@AbhishekTibrewalnoida Strategic cargo shipping can skyrocket in times of need. Better to have capacity ahead of time.
@@AbhishekTibrewalnoida Strategic logistics fluctuate a lot. It would have been worth while to build it to a higher spec so that it's done and dusted. It's more expensive to build another one instead of making this a bigger one from the get go.
Should give proper gear and overalls to the engineers.
Development finsihed LoL 😂
Loco looks so tiny in front of the grand bridge.
This project is such a waste of money. Kashmiri's elected Engineer Rashid who is anti national, these people have absolutely no gratitude to the country. If Modi has brains, he should not allocate even a rupee budget to Kashmir, he should give it to Jammu
Engineer Rashid is the greatest engineer
Thank you, AI 😎😎
Are kam se kam 10 bar bolo northern railway jay😂😂😂
Nahi bolta jao
Toy train chalana chahiye
Is it only a single track? If yes than what a shame.
Waste of money, Time, resources and energy.
Modi ji🙏🇮🇳
Congress party main agenda Hindus money take Muslim distribution..
to kya hua...Hinduo ko konsa farq padta hai..jake vote dekar agaya na...
Tattey fadlo😢
Excellent work Modi government
All thanks to Indian tax payers
Credit mat cheeno
@@sauron2000000 kiska credit bhai
@@AnonymousIsSus Mere Paw Paw ka. Kal Father Day tha na.
@@sauron2000000 tere do baap hai 😂
Northen airways 😂😂
Lol. Poor workers forced to chant for the camera.
Still... Not like your CCP propogenda... Where people are beated and sent to camp.
Cry.
Jai shri Ram 🚩🚩🚩
If they chant Bharatmata ki jai ,what's your problem?they are indian people not confuse them with Pakistan. Also they have not chanted any political slogan.
How my comment got deleted... Don't do your Propaganda here ccp.
वैसे भी चुनाव तो मोदी जी ही हारेंगे
Bharat Mata ki JAI IS THE FUTURE
Bharat Mata also born after 2014?
Congratulations Modi Ji 🙏❣️🙏💪💪💪🚩🕉️🇮🇳 Jai Hind 🚩🕉️🇮🇳
Congress party 40 years rule India. But only this type of infrastructure not provided... Jai bjp ... Next 50 years ..
Perhaps you have forgotten that Kashmir valley railway was completed and inaugurated during Congress rule itself.
During A B Bajpayee rule.a small correction.executed during congress rule.
@@satyajitmukherjee4345 Yes, and there would be many projects started under Congress rule and completed under BJP rule too like Mangalyaan, Chandrayaan-II and several metro systems. Modi govt may be credited with executing this project as high-priority (which I readily acknowledge), but much of the preliminary activities like the feasibility study, identifying the route, survey etc may have been completed during the previous UPA government. That's how things work. Projects started by one govt would end up being completed by another.
@@vineethg6259 His grandfather was born after 2014.
And will do what? Fucking hide shortfalls/defects and give a clean chit? Why the shit is they are inspecting the structural strength of the bridge now? Just to show off ? Bull shit.
Scheme mat bata sabko. Modiya UAPA logadega