    After leveling the beam bottom , the side board must be mounted correctly. The height of the side board is obtained by subtracting the slab thickness from the total height of the beam and the thickness of the board. after set joist. The support from the ground is applied to the same joist. The distance between the joist should laying be between 2 and 2.5 feet. The 2 * 2 pieces of wood placed on top of it should up in the opposite direction at a distance of one foot. Finally put the board on top of it.