Rathoa Haryam Bridge Mangla dam Mirpur Kashmir longest bridge 5000 meters in Pakistan

Поделиться
HTML-код
  • Опубликовано: 20 июл 2018
  • Rathoa Haryam Bridge Mangla dam Mirpur Azad Kashmir long bridge in Pakistan
    Rathoa Haryam Bridge Mirpur also known as Islamgarh bridge is a long bridge under construction in the Mirpur district of Azad Jammmu Kashmir in Pakistan.
    AZAD JAMMU & KASHMIR Rathoa Haryam Bridge: Length 5 km Long. Experts have said that 5 kilometers long, the bridge between Mirpur city and Islamgarh.
    The bridge will not only reduce the road link between Mirpur city and Islamgarh town to an unprecedented level but will also reduce traveling time for commuters between district headquarters of Mirpur and Kotli, as well as between Mirpur and Dadayal sub-division.
    The bridge will also open new vistas for the promotion of tourism in the region, the source added.
    Kashmir's Longest Bridge in Mirpur Pakistan is now nearing completion (June-2017) with the final 2 pillars left. This is the simulated design of how the final bridge will look like. The Haryam Rathoa Bridge is over 5000 meters Long and Spans the Mangla Dam in Azad Kashmir and has a suspension Bridge too.

Комментарии • 24

  • @AbdullahKhan-yc8el
    @AbdullahKhan-yc8el Год назад

    Mashallah ❤️

  • @sixexpress5334
    @sixexpress5334 2 года назад

    My home land ❤️

  • @mukhtarbaig5366
    @mukhtarbaig5366 3 года назад +1

    Allah bless Muslim Allah bless Pakistan

  • @umarch5440
    @umarch5440 6 лет назад +1

    Mashallah sir

  • @printmasterak
    @printmasterak 6 лет назад +1

    Wow amazing

  • @farmanmalik6615
    @farmanmalik6615 3 года назад

    Abhi Tak yai bridge complete nahin howa afsos ki bat hai Pakistan ka koe edara notice nahin lairaha

  • @AminKhan-xf7vt
    @AminKhan-xf7vt 5 лет назад +2

    Inshallaha 100 years time

  • @usamasandhu9217
    @usamasandhu9217 3 года назад

    Please complete this

  • @theequalizertheequalizer3273
    @theequalizertheequalizer3273 5 лет назад

    Very big bridge

  • @qazafirazaq575
    @qazafirazaq575 5 лет назад +2

    Why this this bridge is not compleet jet..??...is to do som thing with corruption??????

  • @Idrees_Azam_Official
    @Idrees_Azam_Official 5 лет назад

    Ye kab mukamal ho ga

  • @KKK07866
    @KKK07866 5 лет назад

    BRIDGE STEEL UNDER Construction''TILL 2005 TO 2019
    VERY SAD....IS KI REPORT IMRAN KHAN TAK POCHNI CHAHEY

  • @KKK07866
    @KKK07866 5 лет назад

    kiya yeh bridge complete ho .giya
    yaa chorooo ki Nazar ho gia

  • @arbabmir3424
    @arbabmir3424 4 года назад

    They built this bridge wrong it's in a earthquake zone.And why they having trouble putting in the last segments.

  • @muzzafarali4565
    @muzzafarali4565 4 года назад

    Last minute vido is fake its not completed yet.

  • @Ruby-su2ex
    @Ruby-su2ex 5 лет назад +1

    When they are going to complete this bridge

  • @shaidh1844
    @shaidh1844 3 года назад

    disgraceful not been completed