1D Hydraulic Modeling using HEC-RAS (8/10) - Creating Bridges

Поделиться
HTML-код
  • Опубликовано: 28 дек 2024

Комментарии • 2

  • @mohitmayoor8052
    @mohitmayoor8052 2 года назад

    I am not able to fit in the mannings value as the box is showing N/A for all the stations. whaT SHOULD I DO ?

    • @hydrologyvideos8253
      @hydrologyvideos8253  2 года назад

      There are instructions in the handout/tutorial on how to enter the Manning's n values