MTA Long Island Rail Road [LIRR] Kawasaki M9 EMU Day 4 Revenue Service (9/16/19)

Поделиться
HTML-код
  • Опубликовано: 5 сен 2024
  • READ:
    Day 4 sees the train on the same rotation as day 1 (1621 and 762). While laying over in Long Island City after running in on 1621, the M9s are used to test the newly re-electrified tracks 9 and 10 before deadheading to Jamaica for the mid-day. With the cancellation of 764 the M9s pick up an additional run on 765 to Atlantic Terminal, as opposed to deadheading into Penn from Hempstead after 762 for 190. I currently do not know if the train made it from Atlantic Terminal to Penn after running on 764 to make 190, but there was certainly enough time for them to make that move. Enjoy =)

Комментарии • 6