Marine Pile Driving - Marine Construction

Поделиться
HTML-код
  • Опубликовано: 16 июн 2015
  • Building a Travelift launching pier in Ocean World Marina, Puerto Plata Dominican Republic
    Marine construction in the Dominican Republic. We specialize in marine construction and pile driving services, we drive 40"+ steel piles to a tip of 25' , this machine did the job just right, we set record time and save money.
    WEB www.maratlantico.com.do
    EMAIL maritimadelatlantico@gmail.com
    TEL 809 669 7660

Комментарии • 29

  • @paulb1150
    @paulb1150 7 лет назад +5

    To the people filming !
    TIME LAPSE !
    FILM WHOLE INSULATION !!
    COOL ! !

  • @Devil7414
    @Devil7414 7 лет назад +2

    great video thank you

  • @baumanagement404
    @baumanagement404 3 года назад

    Very successful documentary, excellent work

  • @franker1111
    @franker1111 Год назад

    I do the same work. Love it. And love doing sheet piling if y'all need another man I'm in

  • @Nurd68
    @Nurd68 6 лет назад +2

    Nice job!

  • @longsweep1
    @longsweep1 5 лет назад +1

    nice work!

  • @kevinthomas4720
    @kevinthomas4720 3 года назад +1

    nice job reminds of the old days no safety equipment just build it .

    • @redrobbo1896
      @redrobbo1896 2 года назад +1

      You think that's a good thing lol?

  • @marinaservices6436
    @marinaservices6436 6 лет назад +2

    Great video! Thank you for posting!

  • @user-sw7jh4ju2i
    @user-sw7jh4ju2i 4 года назад

    장비 의힘인가.인간의 능력인가
    대단해요.

  • @salamalfadly4305
    @salamalfadly4305 4 года назад +1

    Can you explain how to fixed the center of this piles ?

  • @larrysgarage1682
    @larrysgarage1682 4 года назад

    Solid coral does not let a pile sink that rapidly. Extracting pile out of coral and redriving does nothing. Pile will go back into same hole.

  • @ecsean1415
    @ecsean1415 6 лет назад

    just a question. how do you clean inside a drive TSP. It is drived to a depth of 20m at sea. Thank you.

    • @ali13421342
      @ali13421342 6 лет назад +1

      no need for cleaning. depend to designe criteria most of them are open head piles. after completion of driving works, for prevention extra vibration the head going to clean for some meters for puring concrete.

    • @ecsean1415
      @ecsean1415 6 лет назад

      Ali Hossein our design needs to clean the TSP 3m deep though. anyways... thank you for your insights it was really very much appreciated. anyways, is if I need again your knowledge i will contact you again sir. thank you. have a nice one!

    • @MegaReception1
      @MegaReception1 4 года назад +1

      Just stick a air lift in the pile and create a slury with a water jet and clean to the required depth.

  • @tonnyping
    @tonnyping 7 лет назад

    hi, how is the ground? are they all solid corals? I am interested how could vibratory hammer perform so well if the ground is not favourable.

  • @garyforgette495
    @garyforgette495 5 лет назад +3

    If they would use a hydraulic excavator they could guide the pipe and not have to use I template with a crane

    • @marsh2202
      @marsh2202 4 года назад

      Seems like the piles are too far out from the working platform for an excavator.

  • @Joseph_Deering
    @Joseph_Deering 3 года назад

    NO EAR PROTECTION lol

  • @mikewilks8017
    @mikewilks8017 3 года назад

    pipe pile crooked as a country road.

  • @allenwrench9005
    @allenwrench9005 6 лет назад +3

    NO PPE.WHY

    • @franker1111
      @franker1111 4 года назад

      I was thinking the same

    • @franker1111
      @franker1111 4 года назад

      I do the same kind of work.