Excellent video. Am seeing this machine everyday now near my home as they build an elevated light rail transit system. Wondered what the machine did. Now I know.
В мультяшке смотрится красиво,чисто,аккуратно)))А в Реале-это очень грязная работа,мокрая и холодная.Эта технология применяется на севере,а у нас в Сибири просто буры шнековый на базе камаза и грунт глина,просверлили,вставились армопояс и залили бетоном,вот и весь сказ.
Ну для сарая в сибири и шнек сойдет. А вот все мосты , тоннели сроятся с приминением технологии с обсадными трубами. В москве практически отказались от забивных свай.
Bauer are working on a new road project in my home town, seems the rock is much harder, than what was expected, so they are months behind on the work involved, very interesting to watch, but progress is slow .
Lets say 20 years the 3 foot wide concrete pillars rebar is rusted away and along comes a nice earth quake that shatters the 60 to 90 foot pillars. Would you not have been wiser to use wider footers to account for load conditions of the soil in the first place. I guess my question is what is the life expectancy of the pillars under normal load and was earthquakes ever factored in.
Why do they need to install the casing till the end of the hole? They can just install the casing for the first 20 ft or so, then drill the remaining hole without casing. The soil at depth more than 20 ft will be highly compressed because of the weight of the soil on top of it. Thus, it will not collapse to inside the hole even if there is no casing. Anyone can explain for me plz?
Thanks Nikki Briones for your comment. But they did not do any dewatering from the casing. Also, they left the casing segments piece by piece while the concrete is still in its fresh state. So, I'm not really sure if it's related to contamination. What do you think?
Depending to the strata of soil as per soil investigation reports. Sometimes the soil below 20 ft. is sandy, sure they will provide casing in order not to collapse.
Hi, I'm looking to get advice from the drilling rig experts here. How many hours can be BG25 run on before needing new engine rebuild? What is the maintenance cycle? Per how many hours should maintenance be performed? Thank you
Ramón Rousse, Yes, the Engineer will most likely know from the Site Geo-technical Drilling Report of the presence of significant amounts of ground water, and adjustments can be made to either the concrete mix type and/or the pouring technique to account for the groundwater.
Is it just me or is there a lot of time where if two rigs had room to operate side be side the operation could be done more swiftly. Granted I know little about the actual methods etc
Its done to support the building from the hard strata below the ground. Some soil will not have sufficient capacity to hold buildings so piling is done. Also its not just cement, they actually put a steel cage inside.
Super animation can't be more clear than this thanks for uploading 🙏
Sent here from a DB video on Stuttgart 21 where this method is currently used. Thanks, nice animation!
Good job👍. would like to suggest to use a casing clamp during the casing pipe extracted to avoid the downside pipe drop.
Excellent video. Am seeing this machine everyday now near my home as they build an elevated light rail transit system. Wondered what the machine did. Now I know.
In Pointe Claire, Qc ?
Excellent graphic demonstrations. This is different than what I saw they used compressor hammer.
В мультяшке смотрится красиво,чисто,аккуратно)))А в Реале-это очень грязная работа,мокрая и холодная.Эта технология применяется на севере,а у нас в Сибири просто буры шнековый на базе камаза и грунт глина,просверлили,вставились армопояс и залили бетоном,вот и весь сказ.
Ну для сарая в сибири и шнек сойдет. А вот все мосты , тоннели сроятся с приминением технологии с обсадными трубами. В москве практически отказались от забивных свай.
Точно, шмотки отбиваю молотком от бетона после работы.этот способ бурения применяется в основном для высоток.
I have a long experience in this job. Lovely and hard job
Where you from, i want to talk about rig machine
Красивая видюшка жаль в жизни все это по другому происходит!
Bauer are working on a new road project in my home town, seems the rock is much harder, than what was expected, so they are months behind on the work involved, very interesting to watch, but progress is slow .
Awesome video. Simplifies the caisson system.
Enjoyed watching this. I love heavy machinery.
Eric T
ardi
Eric T ค้ยทนัคร่สิ้ท
fantastika realno. Xochu takuiu Molodci Nemci
Excelent video!
Sou brasileiro apaixonado por tecnologia menos trabalho ms produção parabéns moro n acre
KEREN BG
Excellent machine. What is the minimum & maximum diameter and depth for this machine?
1500 максимум, минимум 600
decent quality, my daughter loved it
BAUER 💪
je pense que il est très difficile de retirer le tubage apres durcissement du beton
bom video bom trabalho parabens pelo video
Lets say 20 years the 3 foot wide concrete pillars rebar is rusted away and along comes a nice earth quake that shatters the 60 to 90 foot pillars. Would you not have been wiser to use wider footers to account for load conditions of the soil in the first place. I guess my question is what is the life expectancy of the pillars under normal load and was earthquakes ever factored in.
Bauer bg 39 very nice machine I am opareting bg 39
Excellent job super
الياباني japan Japanese hlw sir howr you
какой "супер"???
ковшебур не закрыл.
дретейлер к пустой обсадной не прикрепил.
дилеанты этот мультфильм делали.
الياباني japan
الياباني 日本語 japan b
Sehr informationsreiches Video. Super.
Awesome video!!!
Why do they need to install the casing till the end of the hole? They can just install the casing for the first 20 ft or so, then drill the remaining hole without casing. The soil at depth more than 20 ft will be highly compressed because of the weight of the soil on top of it. Thus, it will not collapse to inside the hole even if there is no casing. Anyone can explain for me plz?
Monir Alhadid to also avoid contaminating any groundwater i think.
Thanks Nikki Briones for your comment. But they did not do any dewatering from the casing. Also, they left the casing segments piece by piece while the concrete is still in its fresh state. So, I'm not really sure if it's related to contamination. What do you think?
Depending to the strata of soil as per soil investigation reports. Sometimes the soil below 20 ft. is sandy, sure they will provide casing in order not to collapse.
👍👍👍
very nice
Nice video
que potencia hace falta?, y sin mencionar dureza del terreno.
Good work
Now i'm thinking how long will they do this for the construction of Tower M in Malaysia using Bauer BG 72
VERY GOOD VIDEO
Hi,
I'm looking to get advice from the drilling rig experts here.
How many hours can be BG25 run on before needing new engine rebuild?
What is the maintenance cycle?
Per how many hours should maintenance be performed?
Thank you
If you need to own a BG25 you don't ask for maintenance needs on RUclips. Call the dealer instead.
@@epistte Maybe it is a student assignment etc...
@@joshuas3456 According to the Bauer website the BG 26 has a Cat engine. All the specs are listed there.
Good working
Good job
Exellent video
I work in this field. There are places in Algeria. We dug fifty meters
I love your careers
Is the same procedure used when there is water in the subsoil?
Ramón Rousse, Yes, the Engineer will most likely know from the Site Geo-technical Drilling Report of the presence of significant amounts of ground water, and adjustments can be made to either the concrete mix type and/or the pouring technique to account for the groundwater.
Excellent job superb
видео о том, как большой дом прибить большими гвоздями к поверхности
👍👍👍👍
What if the steel pipe and concrete stuck together?
HOW IT IS POSSIBLE WHEN CONCRETE IS STILL IN LIQUID STATE?
How close together can these boreholes be placed.
Video is great
Nice
Informative
Vorige week nog het slot gat opgelast van de los klep
Столько обсадок без стола?
夯实✨📜
Is it just me or is there a lot of time where if two rigs had room to operate side be side the operation could be done more swiftly. Granted I know little about the actual methods etc
Давай начни!, где вода начинается с 3-ех м. и щебенка идет ПОПРОБУЙ!
да не, эта штука как раз там и нужна, здесь обсадная труба самое важное, остальное и садовым буром на руси делают...
Khoan này tiêu chuẩn... Chứ chơi mũi khoan kia kỹ sư đền mũi khoan với bị đuổi việc...đéo hiểu tại sao gãy mũi khoan 😂😂😂
super
👍
Im bauer Indonesia
☝️🤙👍
26/5000
What video is the software made of?
la maldicion de la isla
No need for vibro hammer?
Music???
👍💞😞
how much cost is this machine?
Bast
good
nice video...Thanks. We can also do this job...aha..
Parabéns ms precisar aperfeiçoar uma bomba sungando enquanto cava jogando direto no caminhão de casanba ok
How i can buy of this machine
verygood...
What i saw was a whole digged and filled it back with cement
Its done to support the building from the hard strata below the ground. Some soil will not have sufficient capacity to hold buildings so piling is done. Also its not just cement, they actually put a steel cage inside.
How much per month?
DEPENDS ON YOUR CONTRACT :D
Before I work this !
รถเจาะบาดาลก็ได้
make a video to safe a child from that bore well.please.in lot of place the small child is dieing
Be Sirius
Bauer is two match good I'm opretty in bauer
Mustafa inbox your number plzzz
เจาะลงกลางถนน
Hi, we are from China, manufacturing foudation drilling tools/accessories. any needs?
How i buy of it
روعه
Не үшін бетон құйды дым түсінбедім
护筒放到底?
☝️
ไทย บาวเออ
А где гидростол
ok
Ну чем не искуство
วาวๆๆๆๆๆๆ
без рыжих канализационных труб не заработает
Lesson Learn and knowledge the construction technical
On if
a
Долго
Можно ускорить ☝️с верху
Висит на тросу что его крутит кардана не видно
так ротор его и крутит 😊
Hi Sir,please sent me drilling ring video. verified
Sekou B Kamara k
🤔🤔🤔
5555
.
Робив.на.такі.бг36.
Этот агрегат, в день зарабатывает 200т р!!!.
За одну сваю.