[API PIPING PLAN] Double Seals - Plan 53B

Поделиться
HTML-код
  • Опубликовано: 18 сен 2024
  • [API PIPING PLAN] Double Seals - Plan 53B
    Pressurized barrier fluid circulation with bladder accumulator for dual seal. Fluid circulation by internal pumping device.
    Purpose
    - Cooling and lubrication of secondary seal faces.
    - Remove heat from primary seal chamber.
    - Zero process emissions to atmosphere.
    - Can operate at below atmospheric pressure.
    - Higher pressure capability compare to Plan 53A.
    Get in touch with us at inquiry@proeight.com.my for more information.
    #proeight
    #apipipingplan
    #apiplan
    #pumps
    #mechanicalseals
    #seals
    #impeller
    #rstmechaflex
    #flexical
    #tripeller
    #innovation

Комментарии • 1

  • @bouferkasfarouk9156
    @bouferkasfarouk9156 Год назад +1

    Is it possible to change the plan 52 with the plan 53 in an existing crude oil pump knowing that the crude oil contains some salt and sand that block the spring to work properly and make failure in the first stage (tendem cofiguration) and buffer fluid is contaminated quickly ?
    Can we avoid this problem by plan 53 ?