OPTISWIRL 4200: Installation, commissioning and verification (ICV) | KROHNE Tutorials

Поделиться
HTML-код
  • Опубликовано: 8 ноя 2024

Комментарии • 10

  • @m.dhiyaulhaq233
    @m.dhiyaulhaq233 2 года назад

    how about connecting the profibus cable to the device??

  • @aptitudeandreasoningquesti2540
    @aptitudeandreasoningquesti2540 2 года назад

    What should I connect at C1+ and C 2-

    • @krohne
      @krohne 2 года назад

      Hi, Can you please send us your contact details at socialmedia@krohne.com and we will come back to you as soon as possible? Thanks!

    • @michaelmoller102
      @michaelmoller102 Год назад

      The 24 V DC power supply and the 4...20mA output will be connected.

  • @198engineer
    @198engineer 4 года назад

    do you have password for IFC 300

    • @krohne
      @krohne 2 года назад

      Hi, Can you please send us your contact details at socialmedia@krohne.com and we will come back to you as soon as possible? Thanks!

  • @gokulkamaraj3068
    @gokulkamaraj3068 2 года назад

    What is the password

    • @michaelmoller102
      @michaelmoller102 Год назад

      Default passwords can be found in the enclosed manual on page 61.
      cdn.krohne.com/dlc/MA_OPTISWIRL4200_en_220824_4003930811_R11.pdf

    • @piko8585
      @piko8585 Год назад

      I need pdf for 4200 c please

    • @michaelmoller102
      @michaelmoller102 Год назад

      @@piko8585 This manual is written for the compact "C" as well as for the remote "F" Version.