Sir for the piles less than 1000 numbers minimum two tests is required? Is that enough Because burj Khalifa has 194 bored piles and they did 4 initial tests
No, 2 tests for 1000 nos. of piles are not enough
In Burj Khalifa if they conducted 4 nos. tests for 194 piles, this was perfect
Sir i kindly make a video on the passing condition of Pile load test for friction and end bearing pile.
Please clarify
@@iftakharnazish okay will do that
@@GeotechnicalAnuragKapoor79 thank you sir
Sir for the piles less than 1000 numbers minimum two tests is required? Is that enough
Because burj Khalifa has 194 bored piles and they did 4 initial tests
No, 2 tests for 1000 nos. of piles are not enough
In Burj Khalifa if they conducted 4 nos. tests for 194 piles, this was perfect
Sir i kindly make a video on the passing condition of Pile load test for friction and end bearing pile.
Please clarify
@@iftakharnazish okay will do that
@@GeotechnicalAnuragKapoor79 thank you sir