HOSUR'S NEW BUS DETAILS 🤩 !! Why need 2 BUS STANDS ?? 🚍🚍 JULY 2024

Поделиться
HTML-код
  • Опубликовано: 15 сен 2024
  • #hosur #busstand #infrastructure #tamilnadu
    This video has the project details of the ongoing new bus stand being constructed at Hosur and detailed analysis on the future of present facility.
    Please do watch fully and share your inputs

Комментарии • 62

  • @siddarthmanoharan1440
    @siddarthmanoharan1440 Месяц назад +3

    Ur unfiltered views make us understamd the efficiency of the government and help in improving it by making the people who don't frequent the hosur aware of the problems.

  • @karthikkumar5364
    @karthikkumar5364 Месяц назад +3

    Unga video clarity and way of explanation vera level bro....hard work ku hats off bro👏👏✊

  • @rajanrg
    @rajanrg Месяц назад +2

    Hosur has become a biggy town now and on arrival of airport there as alternative to Bangaluru will take away the importance of Bangalore and Salem simultaneously for better. Location of Hosur in busiest Chennai Bangalore and Kovai Bangalore highway has added issue of Bangalore having become a second business capital for tamil people for obvious reasons. From being a shandy town to Satellite town to now huge town, Hosur has come a long way. Thanks sir

    • @ganesh3687
      @ganesh3687 Месяц назад

      Hosur is a city not town

  • @ramamohangadiyaram9004
    @ramamohangadiyaram9004 Месяц назад +1

    Very interesting presentation. Clear voice and good mixture of English and Tamil.
    Please keep it up.

  • @velmuruka3186
    @velmuruka3186 19 часов назад

    Drawback with Hosur Busstand is it can only accesable by NH. Bus stand should be near Ring road that connets other parts of Hosur town.

  • @vipinkumar-hw5pi
    @vipinkumar-hw5pi 2 дня назад

    Please do a video or update about the progress on the ring road from zuzuvadi to perandapalli thorough bagalur road, which was is stop condition for long period and now started progressing again.
    That will be one great connectivity for IT park, without getting affected by GRT area traffic.

  • @NarendraKumar-ey8qi
    @NarendraKumar-ey8qi Месяц назад +2

    Yes, only ground level design is somewhat ok. But wholly the structure is useless. Waste of public money. Best option in 2000 was to acquire the land opposite to the busstand. Then make two bus stand opposite to each other one towards Chennai and one towards Bangalore, connected by a smooth ramped overbridge for public to move.
    Hosur has a huge demand for boarding, so best option would have been to keep 1st floor and above as a 2 star and 3 star. Fully sound proofed and air conditioned lodging.
    New busstand at one side of the highway is a useless design. Again you need to build grade seperator and 5 more years of traffic jam. Same like koyambedu, after all suffering and pains, finally the bus stand is shunted out.
    Best advise is to keep a seperate bay for bus plying towards Bangalore which is point to point and will go directly to major areas, this scheme will avoid bus change over at Bangalore bus terminus and will save lot of time to general public. This will attract buses to terminate at hosur instead of plying to Bangalore (save on Karnataka state tax).
    Bus stand must be like airport fully with AC ( air handling unit), also the bus stand and platforms must be access controlled. Most important issue is commuters walking on tarmac which must be 100% avoided using access control. This will help buses to come in and out easily.
    Bus stand can be in atleast two levels one for arrival and one for departures. This will avoid mad opposing commuter rush.
    The movement of public must be assisted fully with travelators, escalators and lifts like in metro station.
    Designer must plan for metro integration and future airport automate shuttle integration.
    Drop points for taxi, private vehicles, goods vehicles, service vehicles, stand for 3 wheelers, 2 wheelers, prepaid centres, emergency services like fire, ambulance and traffic must be integrated.
    There must be a vast 2 wheelers and 4 wheeler paid parking area.
    If these are done, TN can take most of the long distance travel out from Bangalore and financially benefit from it and make hosur a new hub.
    Airport project can be delayed if the Bus stand project is correctly done, as it will be fully owned project of state government and state can benefit very much.
    Most important is passenger information signage and live status report of the services.
    And there must be fully transparent Accounting system with live display on how the project cost is being recovered for each payments done by public within this campus.
    Last but not the least, Drinking water , bath rooms and toilets will decide whether the project is successful are not. It high time these are privatised for which revenue is collected from the bus operators.
    Also the Bus bays must be monetised, charges must be levied for entrance, time within the campus and for the actual usage of the platform. This way unnessary holding patterns will be avoided.
    Breath analysers, x ray machines, roit control, ptz cctv etc., must be included to keep the busstand safe. Integrated police station.
    Customer care for people with special needs, patients, women, seniors, children, infants, etc must be included.
    Must include services like foreign exchange, bank, atm, TN product promotions, hotels, snack bar, cafes, entertainment zones for kids , mini theaters for public, waiting halls, dormitory, etc etc.,

    • @RamachandranPalaniramu
      @RamachandranPalaniramu  Месяц назад +1

      that is a very detailed analysis .. thanks for your time and effort in drafting this

  • @dineshkumargunasekaran455
    @dineshkumargunasekaran455 Месяц назад +1

    Appreciate your efforts in making this video

  • @sivathanum3016
    @sivathanum3016 26 дней назад

    சப்தகிரி லாட்ஜ் இருக்கும் இடத்தில் மிகவும் பழமையான பேருந்து நிலையம் இருந்தது

  • @thoufiqintrovert
    @thoufiqintrovert Месяц назад

    Useful Video bro..
    As you said , the existing bus stand can be used for Town bus stand..And link services can be enabled to connect the existing Bus stand with New Bus stand.

  • @balamurugan6150
    @balamurugan6150 Месяц назад +2

    Good

  • @vivekrics7849
    @vivekrics7849 Месяц назад

    Awesome coverage ❤

  • @dineshrs8013
    @dineshrs8013 Месяц назад +2

    Seriously lot of lack of disipline 😢

    • @TravellerSK
      @TravellerSK Месяц назад

      That's overall Indian habits. This matter I am not interested in arguing with south north indian. I am highlighting the overall Indians..

  • @TravellerSK
    @TravellerSK Месяц назад +1

    NH 844 நெரலூர்~ஒசூர் பைபாஸ் வரையிலான சாலை கட்டுமானம் நிலை எந்தளவிற்கு முடிந்திருக்கு என்ற காணொளியை பதிவிடுங்கள்.

  • @rajabacus
    @rajabacus Месяц назад

    I lived in Hosur from 1986-1989. Mostly foggy 🌫️ morning. Never got sweaty. Now changed a lot

    • @RamachandranPalaniramu
      @RamachandranPalaniramu  Месяц назад +1

      That Hosur is totally gone now sir 😊

    • @rajabacus
      @rajabacus Месяц назад

      @@RamachandranPalaniramu
      Yes It was like heaven. Most our people developed the companies with lot of struggle with cold weather and poor amenities. Happy to see this generation people are able to live happy in Hosur

  • @manojkumars189
    @manojkumars189 Месяц назад +2

    🎉🎉🎉

  • @ragavendiranl2728
    @ragavendiranl2728 Месяц назад +1

    make one documentary about Appavupillai

  • @kprav0607
    @kprav0607 Месяц назад

    Thanks for Update bro. Also can you do a video on 2 main points in neralur highway whats going to happen. 1. Mathigiri circle..is any flyover coming 2. Thalli road how is neralur highway intersecting in thalli road will there be a flyover. and also what about railway gate in thalli road. Also bommandalli road (karnoor gate road behind grand cinemas) will intersect in neralur highway whats going to happen there

    • @RamachandranPalaniramu
      @RamachandranPalaniramu  Месяц назад

      Pls watch this video bro. hope it will address your queries
      ruclips.net/video/a0ERTdOGhJc/видео.htmlsi=kFe-16K_3FKPDj2g

  • @shashankyadhav6135
    @shashankyadhav6135 Месяц назад +1

    Super bro

  • @ganeshtravelvlogs9761
    @ganeshtravelvlogs9761 Месяц назад +1

    Bro Hosur railway station development work vlog panunga

  • @ganesh3687
    @ganesh3687 Месяц назад

    I have few doubts what will happen to the current busstand ,the new busstand too not much moden and not bigger too and this busstand too important it's location is hot of the city ,and your idea is good

  • @mahendrasatyanarayana3003
    @mahendrasatyanarayana3003 Месяц назад

    It is a good idea to have a flyover constructed adjacent to the construction site considering the current volume of traffic. I am sure that down the line, the requirement would be much higher

  • @palanivel920
    @palanivel920 Месяц назад

    very nice video👌

  • @kolappan
    @kolappan Месяц назад

    Very informative video

  • @karthikkeyans16
    @karthikkeyans16 Месяц назад +1

    Puthu busstand ku munadi over bridge pota thana traffic korayum highway la

  • @raghunandhan653
    @raghunandhan653 Месяц назад

    Could you please share details on Hosur new GH and how it is connecting from new busstand?

    • @RamachandranPalaniramu
      @RamachandranPalaniramu  Месяц назад

      I heard a road from Bathalapalli will directly hit the Rayakottai Rd next to new GH. But this has to be verified

  • @BuytoytcmryKrish
    @BuytoytcmryKrish Месяц назад

    Why don't they have two levels as upper level for arrivals and lower level for departures?

  • @m.muthukumaran7870
    @m.muthukumaran7870 Месяц назад

    👌👌👌👌👌👌

  • @balamurugan6150
    @balamurugan6150 Месяц назад +1

    Noe bagalur road traffic is worst..

  • @praveen.m3331
    @praveen.m3331 Месяц назад +1

    If they choose to close current bus stand then that will be another disaster 😂

  • @jaya2493
    @jaya2493 Месяц назад

    🎉🎉🎉👏👏👏🔥

  • @user-tg5mb4ti5d
    @user-tg5mb4ti5d Месяц назад

    Bro Hosur new bus stand budget 55 crore now please check 🙏🏻

  • @tamils12345
    @tamils12345 Месяц назад

    Boss 844 hosur to neralur epo complete aagum? I want your approximate estimate.