SAP PP Reorder Point Planning. Automatic / Manual Reorder Point Planning

Поделиться
HTML-код
  • Опубликовано: 26 окт 2024

Комментарии • 35

  • @virendrasinghkandwal
    @virendrasinghkandwal Месяц назад +1

    thanks for the video, it helped me

  • @RohitMoghe
    @RohitMoghe Год назад +1

    Thank You, Excellent work highly appreciated

  • @dipakraikwar
    @dipakraikwar 3 года назад +1

    Hello Sir, you explained the ROP concept in a very nice and simple way. Thank you.

  • @zakharkoval5740
    @zakharkoval5740 Год назад +1

    Hello sir! I did the same in my sandbox. But I had a stock of 260 kg. Why, after running the MRP, I didn’t have a need for 400?

    • @YASHTOUCH
      @YASHTOUCH  Год назад

      Plz send your query in details to me on Mail.Mail Id is available on About section in Channel.

  • @pravinmalve2165
    @pravinmalve2165 2 года назад +1

    Excellent work highly appreciated

  • @SSAHER12345
    @SSAHER12345 7 месяцев назад +1

    I have an issue, we have one material with MRP type as VB, reorder point is 1 and min lot size is 2. Currently Stock is zero for this material, when we run MRP it created the PR for two qty, next day when we again run the MRP it again created the PR for additional 2 qty. As the requirement was already fulfill why system has again created the PR.

    • @YASHTOUCH
      @YASHTOUCH  7 месяцев назад

      Hi Could you please mail me your issue with all proper screenshot of Master data all MRP Views and how you take MRP.

  • @rajatnandanwadkar4650
    @rajatnandanwadkar4650 8 месяцев назад

    Hello Sir,Can you please tell if the proposal can be triggered in the same way you showed but without running md03. i mean whenever stock falls below reorder point automatically system should generate proposal without manually running md03

  • @nileshbansod4646
    @nileshbansod4646 3 года назад +1

    Super explanation sir we are waiting for new video of capacity requirements planning...

    • @YASHTOUCH
      @YASHTOUCH  3 года назад +1

      Thanks,I will upload video on CP as soon...

    • @nileshbansod4646
      @nileshbansod4646 3 года назад

      @@YASHTOUCH Thank you

  • @TarunSeth-y4b
    @TarunSeth-y4b Год назад

    Sir, Please explain how system is calculating Automatic Reorder point value behalf of consumption forecasting .

  • @venkataramanaadapaka9728
    @venkataramanaadapaka9728 3 года назад +1

    Very nice

  • @mahendrakhandagale7591
    @mahendrakhandagale7591 4 года назад +1

    Very nice explained.

  • @zakharkoval5740
    @zakharkoval5740 Год назад +1

    hello sir! i did not understand difference beetwen automatic ROP with Fix lot size and manual ROP

    • @YASHTOUCH
      @YASHTOUCH  Год назад

      Plz send your query in details to me on Mail.Mail Id is available on About section in Channel.

  • @prasad2447
    @prasad2447 3 года назад +1

    How did you calculate reorder point and max stock level

  • @Stocksinnews-bbm813
    @Stocksinnews-bbm813 2 года назад

    can you explain what happens if goes below min safety level in VB .

  • @syedaamirraza6065
    @syedaamirraza6065 4 года назад +1

    how this 65 ROP appears? can you please explain the calculation in automatic ROP.

    • @YASHTOUCH
      @YASHTOUCH  4 года назад

      Hello ,
      You can run the same in system for understand better.

    • @syedaamirraza6065
      @syedaamirraza6065 3 года назад

      @@YASHTOUCH Same question from my side. Please explain based on your parameters.

  • @prasad2447
    @prasad2447 3 года назад +1

    How to download list of materials which is below reorder point ?

    • @YASHTOUCH
      @YASHTOUCH  3 года назад

      In standard SAP no any Report exist with this requirement. however in table level you can get it.

  • @viji791
    @viji791 Год назад

    Hi sir how to take Old ROP report

  • @niveditamaharana9038
    @niveditamaharana9038 Год назад +1

    Kindly share you email id to know more about class.

    • @YASHTOUCH
      @YASHTOUCH  Год назад

      yashrajinamdar90@gmail.com