Floored by VersaShield: Planned Flooring Removal

Поделиться
HTML-код
  • Опубликовано: 18 июн 2015
  • “Floored by VersaShield: Planned Flooring Removal” describes the process of planned flooring removal. The most common practices of planned flooring removal consists of the removal of old flooring and replacement or the installation of a temporary floor over an existing floor. Watch the video to see how it works.
    “Floored by VersaShield” is an informative new video series focused on flooring installation and moisture problems in concrete slabs. These brief videos will be a valuable resource for all flooring installers as well as DIY homeowners. The series will cover topics from moisture testing and slab preparation to moisture remediation alternatives and planned flooring removal.
    Be sure to comment or ask questions below for Halex’s industry experts to have them answered in later videos!
    Subscribe to “Floored by VersaShield” at: / versashield
    Like us on Facebook: / 850543561640324
    For more information on VersaShield Rolled Moisture Barrier and our moisture mitigation products, visit: www.versashield4floors.com/.
    VersaShield: Install today. In business tomorrow.