c3 1981 corvette dash review

Поделиться
HTML-код
  • Опубликовано: 20 янв 2025
  • this dash took 14 hours to install 3 days
    new dash prep and test fitting 6
    .spekercut ous 1hour
    .cleaning edges of speakers longer to get tools out, lol
    .head light switch 30 mins
    .window wiper switch 1 hour
    this one was a pane. I had to be very careful in this spot
    .The dilling hole and cluster make up the rest of the time
    hours
    install 2 still fitting and heating up to get where it needs to be
    4 outside holes mark check mark check and drill
    grill shims 30 mins to make
    old dash out 30 mins
    this is 10 hours of actually working
    clean up and start up the glove box, add the rest of the time, and also buffed all plastic.

Комментарии •