1990 Dowell Schlumberger Coiled Tubing Logging Job

Поделиться
HTML-код
  • Опубликовано: 14 фев 2018
  • In the fall of 1990, Dowell Schlumberger tested out their Coiled Tubing Logging system, developed in their engineering center in Rosharon, TX at the UK Training Center, UTC. Crews and equipment from Aberdeen and Assen ran the job

Комментарии • 3