Fiddlers Ferry Power Station | Site overview after the first demolition.

Поделиться
HTML-код
  • Опубликовано: 13 сен 2024
  • An overview of what’s left of the site of the first 4 cooling towers that were demolished today 3/12/23

Комментарии • 8

  • @AirlinerCamera
    @AirlinerCamera 9 месяцев назад +2

    Thanks for this video, nobody else had uploaded a video after the demolition, very interesting

    • @simonrobertrhodes
      @simonrobertrhodes  9 месяцев назад

      By luck, I managed to get there just as the road closures were lifted with a bit of Daylight left.

  • @Drone.vision
    @Drone.vision 8 месяцев назад

    Excellent mate, I have covered this site a few times, makes great footage 🙂 have gave it a like and subscribed to you 👍

  • @davebroster8930
    @davebroster8930 9 месяцев назад +1

    Not as much to put through the crusher as you’d think….

  • @Gillibrand65
    @Gillibrand65 9 месяцев назад +1

    So when are the other chimneys going to be demolished?

    • @simonrobertrhodes
      @simonrobertrhodes  9 месяцев назад +1

      No date set as of yet. I think they are possibly taking the rest of the buildings down first.