The fundamental concepts of IEC61850 will be discussed in these series of sessions. This series will consists of three sessions. At the end of this series you will learn the various fundamental concepts of IEC 61850 protocol and its applications in substation automation system. All the sessions will be in Hindi as well as English and you may watch these sessions as per your convenience.
The three sessions are as mentioned below:
Part-1: Scope of IEC 61850 in Substation automation system.
Part-2: Concepts of GOOSE, Report Control Blocks (RCB), Networking, Horizontal and Vertical Communications in Substation automation system. The concepts of Logical Device (LD), Logical Nodes (LN), Data Objects (DO) and Data Attributes (DI) will also be discussed in this session.
Part-3: The 61850 engineering process will be explained in this session. Concepts of SCL files and 61850-9-2 will be explained in detail in this session.
An incredible amount of time and effort is needed to develop high-quality video tutorials. Each video takes approximately 6-8 hours to complete which includes learning the concept myself, brainstorming creative ways to teach and explain the concepts, creating the presentations (if delivered through PPT mode), Setup of analysis software, video recording, and editing. Your support truly makes all the difference. So, Please like👍🏻, comment and share this video with your friends and keep watching this channel for more such videos in future.
#Lightningminds #pankajkumarjha #61850 #IEC61850
I have read more than 50 papers on IEC 61850 , trust me this person explaied in most sorted way.
Very informative videos. Keep it up. Pls continue doing this in future also.
SIR I HAVE ATTENDED THE TRAINING PROGRAMME AT HITACHI VADODARA WITH ZERO KNOWLEDGE OF IEC 61850 BUT AFTER WATCHING THE HINDI RUclips LECTURE HAS CLEARED MY ALL DOUBTS. EXCELLENT KNOWLEDGEABLE LECTURE SIR
Sir, aap anjaane mein hi kitne bade upkaar kar rahe hain hum jaiso ke upar. Bhagbaan ki krupa aap par hameshaa bane rahe. Pranaam. 🙏
Very nicely explained in simple terms/concepts. Thank you sir.
Thank you sir for very good content
बहुत detail से आप बताते हैं सर।
Thank you for watching. If you like the contents then please share the video with your friends.
Very elaborative lecture sir
Thanks and welcome
Thank you Sir. You provide quality contents. I really really appreciate your efforts.
Thank you for watching. If you like the contents then please share the video with your friends.
Thank you sir , thank you sir
Thank You. Keep watching for more such videos in future.
Bahut sundar
Sir keep uploading videos we learnt to much think from your video, your video is too much helpful for us. Thank you so much sir...
Thank you so much sir! Detailed explanation, useful information in substation automation field!!
Very useful tutorials sir. Thanks for explaining!
superb Explanation and good knowledge.
Sir,Very good explanation and very useful for upcoming engineers.Thank you so much Sir.
Thank you sir, it was really a great help
Thank You. Keep watching for more such videos in future.
Thanks सर आपका इस वीडियो के लिए, सर हैप्पी छठ पूजा।
धन्यवाद आपको भी छठ पूजा की बधाई हिमांशु भाई🙏
Gjb sir….
Thank you.
Great Sir ❤
Very good explanation Sir.
Thank you. This is only the basic session. Detailed conceptual session will be uploaded on tomorrow.
Thankyou so much sir
very nice explanation sir
Thanks sir.
Most welcome. Thank you for watching. If you like the contents then please share the video with your friends.
Thank you sir
Excellent. Also video on relay co-ordination chart. Possible than discuss obsoleted electro-mechanical relays
Thank you for watching. I will make videos on these topics shortly.
❤❤❤❤❤
Thank you so much sir.
Sir is it possible to show practically how goose signals are communicating.
Sir,
Plz, if transfer bus-2 first open CB THEN closed bus-2 iso closed and bus-1 iso open lastly closed CB charged.
please in Englishh ! looks good
Sir pls make video on PCM also
What is ASDU?
sir, what is reservation
Sir how to communicate multiple siemens relay via digsi
Iec101 and Iec104
when new videos will come sir.....waiting sir
Dear Bharat Jee,
Due to change in my role assignment at my new place of posting. I am presently unable to upload the video. I will start uploading the video shortly. Sorry for the inconvenience.
sir pdf file provide sir please