Agra Metro : RBS College to ISBT Metro Station| Update No 4 l Dec 2024

Поделиться
HTML-код
  • Опубликовано: 5 фев 2025
  • Project Details:
    The Agra Metro is a rapid transit system in Agra, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). It is set to consist of two metro lines, with a total length of 29.65 kilometres (18.42 mi) and 27 stations.
    Agra Metro Rail Project will have 2 corridors that will pass through the heart of the city and will connect prominent tourist places including Taj Mahal, Agra Fort, and Sikandra as well as ISBT, Raja Ki Mandi railway station, Medical College, Agra Cantonment railway station, Collectorate, Sanjay Place, and surrounding densely populated residential areas.
    Highlights of these corridors include:
    The length of Sikandra to Taj East Gate corridor 14.00 km, which is partly elevated and partly underground and comprises 13 stations (6-Elevated and 7-Underground).
    The length of Agra Cantt to Kalindi Vihar corridor is 15.40 km comprising 14 stations all elevated.
    Construction work on Phase 1’s first 4 km section (Taj East Gate - Taj Mahal Ramp) started on December 7, 2020 with the Prime Minister inaugurating works remotely.
    Current Status:
    Agra Metro’s Priority Corridor (5.2 km Taj East Gate - Mankameshwar (Jama Masjid) section) was inaugurated in March 2024. The entire Phase 1 project is expected to be completed in 2026.
    Agra Metro Phase 1 Route Information
    Line-1: Sikandra - Taj East Gate
    Length: 14.25 km
    Type: Elevated (6.569 km) and underground (7.681 km)
    Depot: PAC Depot (16.3 hectares) - shared with Line-2
    Number of Stations: 14
    Station Names: Sikandra, Guru Ka Taal, ISBT, Shastri Nagar (future), RBS College, Raja Ki Mandi, St. John’s (Agra University), Medical College, Mankameshwar (Jama Masjid), Agra Fort, Taj Mahal (Purani Mandi), Fatehabad Road, Basai & Taj East Gate
    Status: 5.2 km Taj East Gate - Mankameshwar section was inaugurated on March 6, 2024.
    Line-2: Agra Cantt. - Kalindi Vihar
    Length: 15.40 km
    Type: Elevated
    Depot: Kalindi Vihar Depot (11.9 hectares) & PAC Depot (16.3 hectares) - shared with Line-1
    Number of Stations: 15
    Station Names: Agra Cantt., Sultanpura, Sadar Bazaar, Pratap Pura (future), Collectorate, Subhash Park, St. John’s (Agra University), Hariparvat Chauraha, Sanjay Place, MG Road, Sultanganj Crossing, Kamla Nagar, Rambagh, Foundary Nagar, Mandi Samiti (Agra Mandi) & Kalindi Vihar
    #upmetro #upmrc #agrafort #agracanttmetrostation #agracollegemetrostation #metro #agra #agranews #agranewstoday #agrabreakingnews #agrakikhabren #agrametroupdate #agrametro

Комментарии • 19

  • @youth_fav_carsshorts
    @youth_fav_carsshorts Месяц назад

    Dhoom Machale Agra Metro 🚇

  • @MaxChan-zw8cx
    @MaxChan-zw8cx 28 дней назад

    very nice video🎉

  • @DEVSINGH-0007
    @DEVSINGH-0007 Месяц назад

    Very nice video good job brother keep it up 😊🙏🙏

    • @Agrapulse
      @Agrapulse  Месяц назад

      @@DEVSINGH-0007 Thank you for your kind words ❤️ Subscribe to our channel for latest construction updates on Agra Metro 🚇🚇

  • @Jaideepjatvlogs
    @Jaideepjatvlogs Месяц назад

    Bohut hi piyari video he

    • @Agrapulse
      @Agrapulse  Месяц назад

      @@Jaideepjatvlogs Thank you for your support and lovely feedback.

  • @Itz_The_Abhi
    @Itz_The_Abhi Месяц назад +3

    0:10 Bro ye tunnel ka mouth small nahi hai thoda 😄😄😄😄... isme se metro kaise niklegi

    • @Agrapulse
      @Agrapulse  Месяц назад +2

      @@Itz_The_Abhi haha.. bro isme up and down lines dono hai and ek baar me hi dono metro nikal sakti hai.. Video me small lag raha hai but actual me small nahin hai

    • @Itz_The_Abhi
      @Itz_The_Abhi Месяц назад

      ​@@Agrapulse You mean two way, in and out subway.

    • @Agrapulse
      @Agrapulse  Месяц назад +1

      @@Itz_The_Abhi yes bro, 2 tracks will be there in this tunnel.. one for metro travelling in the direction from Raja mandi to Sikandara and other track will be for opposite direction movement.

  • @shivamjha5671
    @shivamjha5671 Месяц назад +1

    ताज ईस्ट गेट मेट्रो स्टेशन से डॉ. अम्बेडकर चौक मेट्रो स्टेशन तक ब्लॉक वीडियो दिखाओ 01 जनवरी 2025 का ब्लॉक वीडियो दिखाओ

  • @rehansaifi7388
    @rehansaifi7388 Месяц назад

    Good video 📹

    • @Agrapulse
      @Agrapulse  Месяц назад

      @@rehansaifi7388 Thank you for your feedback. Subscribe to our channel for more construction updates on Agra Metro 🙂

  • @hey_rehan_7i
    @hey_rehan_7i Месяц назад +1

    Bro gurudwara wali side ka kaam kab shuru hoga aur kya wo elevated hoga

    • @Agrapulse
      @Agrapulse  Месяц назад +2

      @hey_rehan_7i bro, uska kaam bhi shuru ho gaya hai.. already gurudwara k opposite me roads par barricading laga di gayi hai.. and haan, ISBT to Sikandara elevated section hoga. Video jaldi upload karta hu, subscribe to channel for latest updates.

  • @Prakhar0078
    @Prakhar0078 Месяц назад

    Sir kl Amar ujala website pe ye likha RBS college tk July 2025 tk start kr denge . Baki 3 station chod denge.is it possible???

    • @Agrapulse
      @Agrapulse  Месяц назад +1

      @@Prakhar0078 may be or may not be. RBS College station tak ka work almost final stages me hi hai but recently moti katra area me kaam band kar diya gaya hai. में उस सैक्शन को भी कवर करने का प्रयास करता हूं

  • @Itz_The_Abhi
    @Itz_The_Abhi Месяц назад +1

    Bro jaldi bana dena Kalandi vihar aur rambhag ki progress ki video and thodi information

    • @Agrapulse
      @Agrapulse  Месяц назад +1

      @@Itz_The_Abhi okay done.