Status of PNR South Long Haul Project according to NEDA - Congressional Oversight Committee

Поделиться
HTML-код
  • Опубликовано: 15 янв 2025

Комментарии • 41

  • @biocyber4544
    @biocyber4544  10 месяцев назад

    ...as a backgrounder, please watch also this interview of Former Usec for Rails Cezar Chavez by Ted Failon (Oct 2023) about the South Long Haul Project: ruclips.net/video/TbnN_gK-VCw/видео.html

  • @PhotoVideoDream-lz9ut
    @PhotoVideoDream-lz9ut 10 месяцев назад +8

    Too slow to implement and for sure will be worse than a turtle to complete it......Government is still very slow in doing what must be done...This is long overdue. How can the Philippines meet its goal if these politicians are mostly stupid and not taking the proper action. As soon as possible ever since.

    • @ianhomerpura8937
      @ianhomerpura8937 10 месяцев назад +1

      Tuloy tuloy yung purchase ng right of way. Matagal na ding tapos yung detailed engineering plan. Yung funding and actual construction work na lang talaga problema.

    • @allenjohndollentas9978
      @allenjohndollentas9978 6 месяцев назад

      Maybe issue was the design and build contractor , "China" - 😅

  • @jet828
    @jet828 10 месяцев назад +4

    budget pa talaga problema nila sir. pero okay lang basta yung NSCR eh on going at tuloy tuloy hangang matapos.

  • @_SJ
    @_SJ 10 месяцев назад +8

    Parang walang sense of urgency ang DoTr 😒

    • @g.b.alejandro6268
      @g.b.alejandro6268 10 месяцев назад +1

      di kase nila matukoy anong mga istasyon sa katimugan ang bebenta sa parokyano nila 😂😂

    • @ianhomerpura8937
      @ianhomerpura8937 9 месяцев назад

      Funding din ang problema nito though.

  • @tirsobendana4592
    @tirsobendana4592 10 месяцев назад +1

    Nice content po para direct ang info!

  • @edmhie1
    @edmhie1 10 месяцев назад +3

    This alignment is not for Light Rail. @ 4:05 why did they design it to a speed of 40-60 km/hour? Then they're changing it to 80-120 km/hr...............just too many alibi.

    • @ianhomerpura8937
      @ianhomerpura8937 9 месяцев назад +2

      Nakabiyahe na ba kayo sa PNR? Sure kayo na gusto niyo bumiyahe ng 80kph sa riles na 70-80 years old na?

    • @noeenricodomanais2517
      @noeenricodomanais2517 9 месяцев назад +1

      Long Haul Railway po iyan, hindi light rail. Kaya dapat talagang palitan.

    • @allenjohndollentas9978
      @allenjohndollentas9978 6 месяцев назад

      This is elevated 100-120kph almost 20 station eto

  • @jngr7429
    @jngr7429 10 месяцев назад +2

    I hope these seating chairpersons have the riding public in mind and they rode a PNR train once in their life.

  • @nonamedpleb
    @nonamedpleb 10 месяцев назад +1

    thanks for sharing.

  • @shelfrobthomas449
    @shelfrobthomas449 10 месяцев назад +3

    2018 pa nagsimula ilang taon ng lumipas wala pa din Detailed Engineering Design pati pondo pilit pa din inaatay ang China eh pwede naman palang ODA sa Japan o Korea, ADB, o sa SMC ni Ramon Ang kayang kaya nya yan. Napondohan nga nya ang 750 Billion pesos na Bulacan Aerotropolis, yan pa kayang South Long Haul, at madami syang mahihikayat na mga International partners para itayo ang South Long Haul maging ang North Long Haul, pwede rin makipag tie up ang mga local na international caliber na mga contractors kagaya nila MEGAWIDE, EEI, DMCI at iba pa.

    • @packohub1145
      @packohub1145 10 месяцев назад

      Di na kaya ng JAPAN KAYA NGA YUNG ADB NA SUMALO LAHAT

  • @reighguevarra114
    @reighguevarra114 9 месяцев назад +2

    Ang South long-haul project po ba ay magiging double-track (isa sa north- and isa para sa south-bound trains)?
    Sana lang maresolba ang issie sa budget upang mapasimulan na ang proyekto.
    Maari na po siguro i-tap ang pondo na ipinangako ng US at Japan during the recent Trilateral summit.

    • @biocyber4544
      @biocyber4544  9 месяцев назад +2

      ..Originally po ay Single Track (with provision for future dual tracks and electrification) yung plano para sa SLH.. pero dahil nga po mag iiba na yung mag hahandle ng Project Managemant, Construction at Funding, maari pong may mabago sa Disenyo ng SLH... although I still assume na yung propose new ROW pa rin yung gagamitin nila, but time will tell...as with previous interview with DOTr, it looks like (not verified) na India and Korea yung nakikipag usap about SLH... (@12:45) ruclips.net/video/TbnN_gK-VCw/видео.html

    • @reighguevarra114
      @reighguevarra114 9 месяцев назад +1

      @@biocyber4544
      Salamat po sa inyong clarification!
      Sa nakikita ko po, ang mga dayuhan (Korea, India, Japan, etc) mas gusto muna nila ma-cut ang ties (project execution, funding, or management) natin with China sa mga infra projects tuland nito.
      I think more than the engineering capabilities, ang talagang factor po ay ang political pressure and influence, pati na rin ang security ng bansa.
      Dagdag pa ang mga lumalabas na issues with regards sa WPS, mukhang mas magiging komplikado ang lahat.
      Sana lang ay makahanap agad tayo ng mga makakapagpondo ng mga proyektong ito.

  • @RubenLorenaRuadil
    @RubenLorenaRuadil 10 месяцев назад

    Yung batangas spur line kasama na ba sa South Long Haul Project or sa future expansion plan pa?

  • @nathaniela2064
    @nathaniela2064 8 месяцев назад +1

    They should set a reasonable timeline with specific dates to target and complete each phase! Not “ASAP” as that is such a generic “palusot” of saying “we are not sure”.

  • @edmhie1
    @edmhie1 10 месяцев назад +1

    Matanda na kasi ang nakaupong DOTr..........walang energy! Kahit sa mga interview parang matamlay lagi.

  • @mikeperez8524
    @mikeperez8524 10 месяцев назад +2

    PARANG SA 2050 PA MASISIMULAN ITO

  • @_SJ
    @_SJ 10 месяцев назад +2

    Boring kasi pag ito ibabalita/priority ibalita ng mainstream media. Wala kasing drama 😒 Kaya ang ending ayun..... nganga at nakatingin na lang tayo sa mga kapitbahay na Southeast Asian countries sa mga railway projects nila 😒

    • @ianhomerpura8937
      @ianhomerpura8937 10 месяцев назад

      Ang focus ng media is yung NSCR, na ongoing na ang construction. Ok pa din naman.

    • @mechasizer7878
      @mechasizer7878 10 месяцев назад

      ​@@ianhomerpura8937 I think pati rin ang Metro Manila Subway.

  • @geraldsionzon7235
    @geraldsionzon7235 10 месяцев назад +1

    Nandon pala yon.

  • @jamh690
    @jamh690 10 месяцев назад +1

    Ang hilig kase ng Dotr mang-hype sa social media lalo na si Tugade nung panahon nya.

  • @rexportento1660
    @rexportento1660 10 месяцев назад +1

    Kailan ba tapos ng Detailed Engineering Design, saan nagamit yung 14B? Bakit may "Design" and Build pa uli. Build na lang sana. Wala bago sinabi. Walang Timeline, puro Drawing & Drible. Di ba dapat North Long Haul na pinag uusapan? Asan na yun Build Better More kaya?

  • @noeenricodomanais2517
    @noeenricodomanais2517 9 месяцев назад

    Dapat yung 500 billion na pondo para sa ayuda ay ginamit na lang dito at sa Mindanao Railway Project

  • @redlancelot2634
    @redlancelot2634 10 месяцев назад

    Wala naman na achieve sa committee na ito. Sana naman umusad na yung proyekto.

  • @limlaurente
    @limlaurente 10 месяцев назад +2

    Kala ko funding na lng kulang sa time n prrd. Andyan pa rin lng pala kayo, why not make it a highspeed railway. 😊😅

    • @ianhomerpura8937
      @ianhomerpura8937 10 месяцев назад

      Yun naman ang nasa plano e, mas straight ang alignment ng South Long Haul project kesa sa gamit ngayon

  • @mexbert10
    @mexbert10 10 месяцев назад +2

    Mabagal ang Admin ngayon. Parang hindi nag mo move ang mga projects ng Government. Puro Englisan lang ng Inglisan.

    • @antukin146
      @antukin146 10 месяцев назад

      sigurado ka mabagal ang admin ngayon.. so mabilis yung kay duterte eh kaya nga di makausad yan puro porma yung idol mo.. tanong ko sayo anong project ba ang natapos ni duterte na hindi nya minana? sige nga?.. aber.. mag Google ka ha para wag kang mapahiya..

  • @LarryfromPH
    @LarryfromPH 10 месяцев назад

    Asan ang project management skills?!

  • @kingofsalem793
    @kingofsalem793 10 месяцев назад

    Mga Congressman baka naman bigyan nio ng pondo

  • @teovlog8239
    @teovlog8239 10 месяцев назад

    Look like a not urgent project. Mukhang silent pati sa R-O-W na LGU political issue. Yun pag-acquire ng 30 meters width is a challenge lalo puno ng informal settlers almost 2 meters na sa tabi ng riles.

  • @g.b.alejandro6268
    @g.b.alejandro6268 10 месяцев назад

    kahit hanggang alabang lang muna. bat ba kailangang ipush hanggang bicol? mga taga quezon at bicol pag umuuwi ng probinsya nag ba-bus naman 🙄