NEW Los Angeles Metro D Line HR4000 Full Line Ride: Union Station to Wilshire/Western

Поделиться
HTML-код
  • Опубликовано: 24 дек 2024

Комментарии • 7

  • @LucyLoud2002
    @LucyLoud2002 16 часов назад +4

    I think they should update the announcements on these trains to the new voice that is used on the light rail trains.

  • @ABC7EWN9723
    @ABC7EWN9723 19 часов назад

    Couldn't wait for more of these HR4000s in the new year. I'm totally gonna be thrilled with it.

  • @elliottwlucas
    @elliottwlucas 9 часов назад

    The new subway cars look nice. They’ll eventually be assigned to the B line. I also think they need to do updating with the announcement system to the newer announcements like the light rail 🚋 trains do.

  • @rockyroad-hq7hz
    @rockyroad-hq7hz 13 часов назад

    When is that extension to Wilshire and La Brea going to open???

  • @alexanderbanos8125
    @alexanderbanos8125 18 часов назад +4

    The PA system on the new CRRC HR4000 subway cars is still saying the old names of LA Metro's two heavy rail subway lines. Instead of the PA system saying the D Line, it would say the D Line's old name, the Purple Line (same for the B Line saying the old Red Line name instead). Even the PA system announcing the arrival at 7th Street/Metro Center station at 4:04 listing the LA Metro Rail line connections at that station is still saying "Connect here with the Metro E Line (Expo) on Platform 1, the Metro A Line (Blue) on Platform 2", dating back when 7th/MC station was the A and E Lines' terminus, at pre-Regional Connector era.

  • @SuperheroJunior
    @SuperheroJunior 20 часов назад +1

    More HR4000 trains will come next year in 2025.

    • @FreeVideos-w6e
      @FreeVideos-w6e 18 часов назад

      And then the hr4000s will also be on the red line! (Or B Line)