20231124JA4957

Поделиться
HTML-код
  • Опубликовано: 24 ноя 2023
  • Sewerscope video inspection of buried sewer lateral from the cleanout plug in the basement. The cast iron pipe was in acceptable condition and transitioned into clay material. There were no tree root intrusions visible and drainage was acceptable. No further action is needed.

Комментарии •