[Installation] Suction sails (eSAILs®) whole installation on ro-ro vessel

Поделиться
HTML-код
  • Опубликовано: 23 июн 2024
  • Following installation of eSAIL® foundations in Poland in November 2023, the 5,200-dwt Ville de Bordeaux (built 2004) had a short stopover in a shipyard in Vigo, Spain and conducted the installation of its three brand-new, 22-metre-high eSAILs®. The verticalization manoeuvre and connection to the reinforcement of the suction sails was completed in less than two days.

Комментарии •