Signalling on the Elizabeth line

Поделиться
HTML-код
  • Опубликовано: 22 окт 2024
  • A critical stage of the Crossrail project is testing of the train and signalling system, this must be completed before the Elizabeth line can open.
    Video released in 2019

Комментарии •