  • Steam turbines of different types require casings having lengthwise extending portions with parameters of length and cross-sectional contour and size determined by the encased turbine working elements and which, therefore, differ for the different types of turbines. Instead of the turbine casing being a single casting including all of these portions, the latter are formed by separate interfitting parts which are separate castings. A plurality of such parts are made for each portion with the parameters of each part differing from those of each other as required for the parts to form that portion of a plurality of differing types of turbines. That is to say, for each portion an inventory of parts is provided having differing parameters as required for differing types of turbines. To make a turbine casing for a desired type of turbine, the parts required for the various portions of the casing are selected having the parameters of that type of turbine and these parts are interfitted and interconnected to form the casing.

Комментарии • 39

  • @단순소박-q6f
    @단순소박-q6f 2 года назад +12

    I am Turbine Engineer from South Korea.
    this video shows us each correct process which occur in reality, is what I am doing in field.
    Amazing!

    • @Powerplant02
      @Powerplant02  Год назад

      ok sir

    • @ashokkumarsharma5821
      @ashokkumarsharma5821 Год назад

      As a power plant engineer i can say this video is going to show you real turbine picture 🖼️

    • @morakamolokomme3221
      @morakamolokomme3221 11 месяцев назад

      How do you measure diaphragm segment clearance?

    • @단순소박-q6f
      @단순소박-q6f 11 месяцев назад

      @@morakamolokomme3221 which segment? do u mean a gap between diaphragm and rotor?

    • @morakamolokomme3221
      @morakamolokomme3221 11 месяцев назад

      @@단순소박-q6f yess

  • @asepdenihidayat4498
    @asepdenihidayat4498 6 месяцев назад

    Thank You for sharing video
    Mantap betul 😊❤

  • @RAHULRAJ-zp8vr
    @RAHULRAJ-zp8vr 4 года назад +4

    Good one!! Kudos for the effort. Keep doing.

  • @mansourghadhban236
    @mansourghadhban236 2 года назад +1

    Good job we hope to build like this factories in Iraq

    • @Powerplant02
      @Powerplant02  Год назад

      ok sir.. hopefully it can be realized

  • @briela4094
    @briela4094 3 года назад +1

    it's so good

    • @Powerplant02
      @Powerplant02  3 года назад

      thanks brother ..Nice to meet you, too

  • @singermanishyadav357
    @singermanishyadav357 3 года назад

    LPB-GEN one coupling bolt ka right weight Kitna hota hai

  • @fredliperson9171
    @fredliperson9171 3 года назад +3

    When you can turn the rotor by hand with a 15 foot cheater bar you have done it correctly..

  • @tapankalsariya1691
    @tapankalsariya1691 3 года назад

    But how could be HPT outer casing is split type? It should be barrel type.

  • @pulkitdangvlogs
    @pulkitdangvlogs Год назад

    I wanna ask does coal based turbines have gold parts or actual gold in it?

  • @epifaniozamora9393
    @epifaniozamora9393 4 года назад

    hello, ill be working on a toshiba steam turbine. In mona, UT pasifcorp plant. do you any videos on this type of turbine? im an apprentice millwright wanting/looking to learn as much-thanks.

  • @mohammedkaoua5314
    @mohammedkaoua5314 4 года назад +1

    Formation

  • @sudarja_t.mesin_umy4407
    @sudarja_t.mesin_umy4407 4 года назад +4

    Thanks for the knowledge sharing. Alhamdulillah

  • @paulcurrie7828
    @paulcurrie7828 8 месяцев назад

    If only that simple….the days and days of cleaning measuring and setting diaphragm, seals and bearings.

  • @wolfentize6418
    @wolfentize6418 Год назад

    hellO friend, watching frOm Philippines...thanxx

  • @prasannadash100
    @prasannadash100 2 года назад +1

    great presentation

  • @ajaymaheshvari137
    @ajaymaheshvari137 3 года назад +1

    Perfact