Coomera Connector Stage 1 - January 2025 - Drone 4k Part 3

Поделиться
HTML-код
  • Опубликовано: 4 фев 2025

Комментарии • 6

  • @frankgao6138
    @frankgao6138 13 дней назад +1

    Thanks.

  • @desgamble7643
    @desgamble7643 12 дней назад +2

    The road to nowhere. Great footage. Foxwell road @ Coomera will be chaos when this section is completed.

    • @gcdroneshots
      @gcdroneshots  11 дней назад

      100% it’s gonna be mayhem for sure

    • @clcanturin
      @clcanturin 22 часа назад

      Now traffic gets there in a peak hour and takes you around 20mins from the roundabout to the M1 exit…
      Now let’s add this “new highway”

  • @timmyhexham9603
    @timmyhexham9603 7 дней назад

    What is with the funding cut? What does it mean?

    • @gcdroneshots
      @gcdroneshots  6 дней назад

      Still unsure if the Coomera connector future stages got axed or not with the funding