Building 3 House's at ONCE - NZ Subdivision w TIMELAPSE

Поделиться
HTML-код
  • Опубликовано: 7 ноя 2024

Комментарии • 6

  • @garyclarke8862
    @garyclarke8862 Год назад

    Remember that tap route is good for tea as is the dried flowers

  • @supernom
    @supernom 2 года назад +1

    what are those round posts for that went in under the slab floor slab ?

    • @freedomdivingnz4338
      @freedomdivingnz4338 2 года назад

      They basically outline the footing, then get cut down to a certain size once the footing is dug. Then the poly and cages/mesh gets put on top ready for the pour

    • @nzbuilder
      @nzbuilder  2 года назад +2

      Timber Driven Piles to support the foundation on bad ground. This whole area used to be a swamp

  • @catherinetiffany6579
    @catherinetiffany6579 Год назад

    Log house

  • @hira4369
    @hira4369 Год назад

    Shit, lock your vehicles up when working in this area guys….