Boiler Gauge glass cleaning and blowdown

Поделиться
HTML-код
  • Опубликовано: 27 дек 2024

Комментарии • 5

  • @WhyAyeMann
    @WhyAyeMann 5 лет назад +2

    you should never open the water side first, always the steam so that the glass gets tempered before you open the water side.

  • @popeye6852
    @popeye6852 5 лет назад

    why we should open the waterside first after blow through?

  • @vijaybasker1633
    @vijaybasker1633 5 лет назад

    This procedure i can apply to flush a mobrey switch

  • @philipmcauley
    @philipmcauley 5 лет назад +3

    Your valves are moving the wrong way to open and close them lol.

    • @deerinpj
      @deerinpj 5 лет назад +1

      Boiler valves are reverse of normal valves. From when boilers used to be on ships and trains, they hang ‘down’ when in preferred operating position to ensure they don’t vibrate into a dangerous position.