Installation of a 10KW Wind Turbine (by Genfit)

Поделиться
HTML-код
  • Опубликовано: 31 дек 2024
  • This video shows the installation process of a 10KW Wind Turbine.
    This is our website, check it out for information on renewable and receive a free quotation -
    www.generationfit.co.uk
    Checks pre-installation of tower base - 0m11s
    Levelling tower base - 0m18s
    Testing the Hydraulic Rams - 0m36s
    Building out tower sections - 0m49s
    Installing the turbine head - 1m27s
    Lifting the tower - 1m57s
    Completed and generating - 2m10s
    Technical Details:
    Turbine output: 10kW
    Tower: 20m monopole
    Ave. wind speed at hub height: 5.38m/s
    Est. energy production: 16,814 kWh/yr
    Expected return on investment: 10%
    Installed by Genfit.