Installation of a 10KW Wind Turbine (by Genfit)
HTML-код
- Опубликовано: 31 дек 2024
- This video shows the installation process of a 10KW Wind Turbine.
This is our website, check it out for information on renewable and receive a free quotation -
www.generationfit.co.uk
Checks pre-installation of tower base - 0m11s
Levelling tower base - 0m18s
Testing the Hydraulic Rams - 0m36s
Building out tower sections - 0m49s
Installing the turbine head - 1m27s
Lifting the tower - 1m57s
Completed and generating - 2m10s
Technical Details:
Turbine output: 10kW
Tower: 20m monopole
Ave. wind speed at hub height: 5.38m/s
Est. energy production: 16,814 kWh/yr
Expected return on investment: 10%
Installed by Genfit.