The overall quality of the road looked very good. But, we also see that attention to detail (no lights inside the tunnel), lane discipline (that reckless motorcycle driver who was overtaking the truck inside the tunnel nearly got smashed by an oncoming truck in a head on collision) are as good as ever. You can have all the infra development you want but if people do not change their tuccha mental attitude when it comes to these matters, ask yourself how realistic it is to speak of Viksit Bharat by 2047.
🎉🎉🎉🎉🎉🎉❤❤❤❤❤❤
Thank you
Awesome superb outstanding mind-blowing video 📷
Good Job
Apki vdio hm punjab me se dekh rhe he ❤❤
Thank you
Construction companies are working slowly on nh44 especially on banihal to ramban
The overall quality of the road looked very good. But, we also see that attention to detail (no lights inside the tunnel), lane discipline (that reckless motorcycle driver who was overtaking the truck inside the tunnel nearly got smashed by an oncoming truck in a head on collision) are as good as ever. You can have all the infra development you want but if people do not change their tuccha mental attitude when it comes to these matters, ask yourself how realistic it is to speak of Viksit Bharat by 2047.
Digdol tunnel kab complete hongi
Four laning road construction work on nh44 is too slow
Jammu to siringar kitna time lgta he abb agar jaam na mile bhai pls reply
5 hours ka andr pahunch jaoga aram sa
WE SHOULD COMPLETE KATRA SANGALDAN RAIL LINE ON MISSION MODE IF WE WANT TO BE SUPER POWER UP TO 2047.....