  • Explore The World´s Largest Hydroelectric Power Plants. The 22.5GW Three Gorges Hydroelectric Power Plant, The 14GW Itaipu Hydroelectric Power Plant, The 13.86GW Xiluodu Hydroelectric Power Plant, The 11.2GW Belo Monte Hydroelectric Power Plant, The 10.2GW Guri Hydroelectric Power Plant, The 8.37GW Tucurui Hydroelectric Power Plant.
    🤲 SUPPORT:
    Please support me on PATREON and help HELP me make more videos:
    / chrvojeengineering
    🤷 MY REVIEW:
    This video took me approximately four weeks to finished, it was hard to find relevant videos or pictures about every Hydroelectric Power Plant. You will find information about the Six Largest Hydroelectric Power Plants.
    ⌚TIMESTAMPS:
    00:07 - Intro
    01:41 - The 22.5GW Three Gorges Hydroelectric Power Plant
    03:04 - The 14GW Itaipu Hydroelectric Power Plant
    04:40 - The 13.86GW Xiluodu Hydroelectric Power Plant
    06:03 - The 11.2GW Belo Monte Hydroelectric Power Plant
    07:10 - The 10.2GW Guri Hydroelectric Power Plant
    08:35 - The 8.37GW Tucurui Hydroelectric Power Plant
    💻Follow me on social media:
    ✔ WEB - www.chrvojeengineering.com
    ✔ PATREON - / chrvojeengineering:
    ✔ FACEBOOK - / chrvojeengineering
    ✔ TWITTER - / chrvoje1
    ✔ LINKEDIN - / chrvojengineering
    🌐Reference Sources:
    ✔ Internet
    🎦 Animation is made:
    ✔ 3D ANIMATION/RENDERING: 3D max 2015, Vray 3.0
    ✔ VIDEO EDITING: Adobe After Effects, Adobe Premier
    ✔ VOICE EDITING: Adobe Audition
    📜 Script:
    The script is made from a reference source
    🎤 Voice over:
    Steve A. @steveal68, www.choiceofvoice.co.uk
    📂Playlist:
    Documentary Videos by #chrvojeengineering
    • Documentary Videos by ...
    🔩 Equipment used for animation:
    Acer Predator Helios 300 NH.Q5REX.01P -
    ✔17,3 FHD IPS 144Hz,
    ✔Intel Core i7 9750H, 32GB RAM,
    ✔1TB PCIe NVMe SSD,
    ✔NVIDIA GeForce RTX 2070 8GB
    #chrvojeengineering #TheWorld´sLargestHydroelectricPowerPlants #HydroelectricPowerPlants

Комментарии • 1

  • @simonbowman6206
    @simonbowman6206 2 года назад +1

    YOU WISH TO MAKE A REAL DIFFERANCE!!
    you wish to make a difference??
    Hydro electricity
    The Frozen technology
    An open letter to the world
    By Simon Bowman
    Australia
    Since the beginning the growth of hydro science has been slow and we have made very little forward movement in the past 40 years.
    The ideas that might make it leap forward with more efficient use of the water are stifled by education being thought of as immovable .
    What was wrong yesterday will be wrong forever and new tech can't get around a problem.
    This is not a problem solving mind set
    Australia has forced many an idea to leave this country to grow
    just because we have an issue with new ideas
    A classic example was Metal Storm a new type of fire arm that had no magazine and no brass cartridges to hold the propellent.
    all the bullets are held in the barrel and with this configuration the barrels can be stacked this gives it a rate of fire unmatched anywhere
    It had to leave Australia to become a product or stay and die.
    This I fear is the same story about to happen with the hydroelectric field
    For the past two years RDP Marine Australia has been working on a system that can be retro fitted to all dams with tailraces longer than the turbine hall needs so it has to deal with a backpressure higher than is ideal creating a loss that can now be recovered
    At this point it should also be noted that the inventor asks where is it written that water storage dams can’t make hydro power to ?
    So is this inventor saying “This is the answer to all ur power needs?”
    No of course not but like all good things it is a part of a solution it will fill the gap for base load green power
    Lets not forget at the location where these units will be fitted has most of the infrastructure already in place to build the system
    NOW TO THE ISSUES
    There are three main issues right of the top that are the most commonly raised as why it will not happen
    So lets stomp on them straight off
    1, fit an item into the tailrace and backpressure will rise in the turbines
    No this is not true as a this system if done right it can be fitted to be like a tuned exhaust for a car
    2, There will be to little back pressure so RPM will not be constant
    Again No if the system is correctly fitted this to is a dead issue
    3, Dissolved gasses that are held in suspension
    This is a minor issue and most chief engineers are well capable to work with this
    4, NOW this one can be a deal-breaker it is to do with a what if question.
    So what if the new set of turbines go down or just one ?
    Well if one or all freeze up the main turbine hall will be unaffected and no issues flowing up hill
    These four issues are the most common reasons I am told No
    It is this closed thinking (knee jerk response) to a new idea from the same family of being blinded by their education that stifles the industry moving forward
    The one question I have no answer to is time
    How long to install?
    How long to service the new turbines?
    To service time i still don't know but the system is set to allow a swap out setup so actual down time for that turbine slot is less than two hours and the rest of the system remains running during the swap
    How much will it cost?
    I can guess only the price but the price is not so high as to be to costly
    Whats its life span?
    Well with servicing I can see it giving service for the life of the dam
    NOW the big question Money!!
    this is a fluid issue shall we say the rate changes and i have stated previously money values but the income is in two parts the improved tailrace efficiency and the second bank of turbines should be close to 10% extra income
    The one main issue I find so wrong is the time line needed from this point to the world seeing a working unit.
    The tech is there to make it
    The skills are available to hire
    The market is in need of this item
    But the price will rise with demand as the population is getting bigger but the book keepers are happy to see it remain as a rare item with a limited output that pushes up the price
    The first adopters have always been the biggest winners I wonder in this area if it will be the big four or will a player from left field run on and wipe the floor with the rest standing with their hands in their pockets confused as to what just happened
    Well, I hope this has given you food for thought and made you pause your thinking and look into what I have said I do not expect you to just except what I have stated as fact nor do I know it all so I can learn a new thing to.
    Please pass this around let the open minded look it over and pass judgment after all the driver in the end is the need and the ability to see what is needed down the road is the saving grace of the human species to plan ahead
    If you think i have missed a point or you have questions please comment i will respond well within 24hr and as i have said many times i don't know it all and you never stop learning