PVC C900 (2 DE 5)
HTML-код
- Опубликовано: 30 сен 2024
- CAPACITACIÓN PVC C900 - FITFLOW PARTE 2 DE 5
GAPSAC participó en el curso llevado a cabo el 10 de setiembre del 2015, llevado a cabo en el Hotel RADISSON. Acerca de los productos PVC C900 para líneas enterradas en sistemas contraincendio.
Referencia: www.northameric...
Los ponentes fueron:
Christopher Fulton - International Sales Manager - NORTH AMERICAN CORPORATION.
Ryan Berry - International Sales Manager - NORTH AMERICAN CORPORATION.
Trying my best to find a video on a 12" gate valve main valve install. Have to do a few 6" and 12" in the morning. And I've never done a gate valve that size with mega lugs.
how to have a leak ? 🤦♂️
Pipe wasn't home
🤦🏻♂️
Always have a 1ft’ mark on the pipe to measure home. Pipe wasn’t even seated… lmao
Use the mega lug to make sure the gasket is sealed into the 90 elbow correctly.
Mucho se demora en poner un codo 😅
What a bunch of clowns
Excelente
exelente presentacion,