Important tests on Transformers Tamil

Поделиться
HTML-код
  • Опубликовано: 24 авг 2021
  • IR test done
    PI test explained Tamil
  • НаукаНаука

Комментарии • 29

  • @Gulsejkm
    @Gulsejkm Месяц назад

    Very useful sir... thanks

  • @venkateshprabhu8699
    @venkateshprabhu8699 2 года назад

    well explained practicaly sir .thank you..

  • @sugumars8168
    @sugumars8168 2 года назад +1

    Very use full

  • @rameshparamasivan6997
    @rameshparamasivan6997 2 года назад +1

    Super 👌👌

  • @ashirah-2019
    @ashirah-2019 10 месяцев назад

    Useful this video

  • @arasurathin1469
    @arasurathin1469 Год назад

    Stability test podunga bro

  • @30mAkills
    @30mAkills 11 месяцев назад

    Rare video in Tamil on IR testing of DT transformers. Good point = No need of jumpering terminals.

  • @sujisulagam3092
    @sujisulagam3092 2 года назад +1

    Nice👏

  • @mageshmageshmagi1550
    @mageshmageshmagi1550 2 месяца назад +1

    After test discharge everything

  • @harisuthan6150
    @harisuthan6150 2 года назад +1

    Nice

  • @hkvasan7091
    @hkvasan7091 8 дней назад

    Why Apply voltage Value 5kv

  • @manothi9240
    @manothi9240 2 года назад

    Ithu ena test.ratio testah

  • @hollywoodtimes4002
    @hollywoodtimes4002 Год назад

    Sir leada secondary side la neutral en kodukurainka phase layea kodukalamaa

    • @electricalvathiyar1753
      @electricalvathiyar1753  Год назад +2

      Star connectionla neutral common point.
      Phase to phasem kudukkalm.

    • @hollywoodtimes4002
      @hollywoodtimes4002 Год назад

      @@electricalvathiyar1753 nandri sir I also have another doubt earth value withgrid yeavalavu irukkanum sir without grid yeavalavu irukkanum sir withgrid and without grid details sollunga sir

    • @electricalvathiyar1753
      @electricalvathiyar1753  Год назад +1

      Less than 1 Ohm

  • @palanipps
    @palanipps 11 месяцев назад

    while primary testing time secondary should be shorted & earthed & secondary IR doing time primary should be earthed..those details not informed sir..just for information.

    • @electricalvathiyar1753
      @electricalvathiyar1753  11 месяцев назад

      Agreed for safety purpose

    • @palanipps
      @palanipps 11 месяцев назад +2

      @@electricalvathiyar1753 earthed in other end not for Saftey else values will come in Mega ohms instead as Giga ohms..if you have doubt you can trail IR values with & without opposite end earthed.

  • @chandrus3803
    @chandrus3803 2 года назад +1

    How to check transformer winding resistance test.....

    • @electricalvathiyar1753
      @electricalvathiyar1753  2 года назад +2

      It will be measured with Transformer ohm meter.
      By testing with multimeter you will get continuity (only beep) in secondary LV sides and a small ohm value on primary HV side but no beep.

    • @electricalvathiyar1753
      @electricalvathiyar1753  2 года назад +2

      megger.com/10-a-transformer-ohmmeter-mto210
      The Transformer Ohmmeter is extremely useful when testing the windings and contact resistance of tap-changers with “make-before-break” contacts and voltage regulators. This action will check for pitted or misaligned contacts as the instrument will give an indication if either condition occurs.

    • @chandrus3803
      @chandrus3803 2 года назад +2

      Thanks sir.can you upload one video about how to check transformer winding resistance test

    • @electricalvathiyar1753
      @electricalvathiyar1753  2 года назад +2

      Ok

  • @vinilm1844
    @vinilm1844 Год назад +1

    Kanyakumari slang 🥰🥰🥰

  • @manojl3446
    @manojl3446 Год назад

    11kv why 5kv used Miter

    • @Gulsejkm
      @Gulsejkm Месяц назад

      For 11 kv transformer, cable, VCB, OCB We have to give only 5000 V DC is enough. For LT 500 V DC is enough to find the IR Value