  • In this episode, we are giving you an overview of what you will learn in our 2020 National Electrical Code "Grounding and Bonding" Course located at www.MasterTheNEC.com
    We only give you a taste of what you will learn.......the slides in this 1-hour sample are NOT what you will learn, these are only to give you a sample of the content you will learn in our course.

Комментарии • 18

  • @marcramirez9076
    @marcramirez9076 4 года назад +2

    Gentlemen, Great work on Article 680 part One. I was on panel 20/17 from 1993-2014.

  • @cheobryan4954
    @cheobryan4954 Год назад +1

    I appreciate your guidance..you are a true expert.

  • @michaelescalada2496
    @michaelescalada2496 3 года назад +1

    Very well explained and with good details

  • @AngelTorres-tk2nw
    @AngelTorres-tk2nw 4 года назад +1

    You are one of the best in the business, referring to learning the electrical code,
    Thank you Brother.

  • @robertvillalpando5250
    @robertvillalpando5250 2 года назад

    👍 instructed

  • @jamelofrazier
    @jamelofrazier 2 года назад

    Hello , if I am installing a Temporary Main 100amp Outdoor Electrical Service Panel with 2 ground rods 6 feet apart within 3 feet of a Shed Sub Panel . Will I be required to add two more ground rods at the Shed Sub Panel? Even; if, I have Main and Sub Panel bonded to same two Ground Rods ?

    • @MasterTheNEC
      @MasterTheNEC  2 года назад +3

      If you have a remote distribution panel in the detached structure, in your case a shed, you would indeed be required to establish a grounding electrode system at the shed. Now, if the main panel and shed with remote panel are that close, nothing says you can't use the same ground rods if you wish.

  • @davem5392
    @davem5392 Год назад

    how are you testing 25 ohms or less

    • @MasterTheNEC
      @MasterTheNEC  Год назад +1

      You invest in a 3-point fall of potential meter or an Ground Resistance Meter which are expensive. Here is the cheaper option - www.fluke.com/en-us/learn/blog/grounding/earth-ground-fall-potential
      But, its probably easier to just put in (2) ground rods.

    • @davem5392
      @davem5392 Год назад

      @@MasterTheNEC thank you that’s what I figured. It would be interesting to have one to experiment with. I never used one

    • @JustWatkins562
      @JustWatkins562 Год назад

      Just ran into this with an inspector, couldn't understand how to accomplish this so I just threw in two rods 😂 thank you very much for the info!!!

  • @capoconstruction1961
    @capoconstruction1961 3 года назад

    I am researching a question. 200 Amp panel. Need to run underground service conductors to two spots in rear of property. How to calculate all this? 1. Determine distance? 2. Determine future potential load? 3. Go to two tables in NEC correct?

    • @MasterTheNEC
      @MasterTheNEC  3 года назад

      We do not answer questions here. If you have a technical question please visit www.PaulAbernathy.com and post on our portal.

  • @BBQPitmaster626
    @BBQPitmaster626 2 года назад +2

    So the ground rods must practice Social Distancing as well?

  • @dicknastee1652
    @dicknastee1652 Год назад

    Ufer