    3 guys to put peace on the CNC is crazy. And your vaccum pipes are on the back ,you have to put them on the front.

  • @grangerthomas1571
    @grangerthomas1571 Год назад

    For my self I always put on my CNC top maximum in front so I never climb on the table . It is to hard and waist off time.And always charge discharge all tops with lifting suction .
    So 1 guy for 2 CNC 1bridge saw 1 edge machine. Edge machine should be flat positioned in front of the bridge saw. Cnc should be 1 right bridge saw 1CNC at the end of the edge machine.
    1 guy 4 kitchens day.only 2 lifting systems. 2nd guy only to bring slabs discharged conteneurs and maintenance.
    This way you cut you go directly with same lifting to edge machine or to CNC.and direct at the end of the edge machine to the 2nd CNC with 2nd lifting system .
    By this way add an other bridge saw in front of the first one so the edge machine in middle 2 guy's 6 to 7 kitchens day.