Update On Indiana & Ohio Railway! New Grain Elevator To Reopen Part Of The Line! IORY

Поделиться
HTML-код
  • Опубликовано: 19 ноя 2024

Комментарии • 38

  • @cmphighpower
    @cmphighpower 6 лет назад

    Glad to see the rail saved

  • @bekleidungu.ausrustung7068
    @bekleidungu.ausrustung7068 4 года назад +1

    Yea, we don't need anymore railroads converted to bike paths, lol

    • @JawTooth
      @JawTooth  4 года назад

      we finally got one saved. Almost half of this line got reopened for that new customer

  • @tenthovi
    @tenthovi 9 лет назад +2

    And the reason Owens Corning switched to truck was the refusal of I&O/G&W to repair the track after the latest slide that occurred in the fall of 2013.

    • @JawTooth
      @JawTooth  9 лет назад +1

      Chris Edwards Oh, I wondered what happened. Nobody that I talked to knew what the reason was.

    • @cmphighpower
      @cmphighpower 6 лет назад

      Chris Edwards have they rebuilt to Owens Corning since they reopened to the mill?

  • @MrPeerum
    @MrPeerum 9 лет назад

    new factory,s,reopening from the railroad,Brian.it wil be open.greetz:Peerke.

    • @JawTooth
      @JawTooth  9 лет назад

      MrPeerum Yes, the new factory will save almost half of this really old line that was built in the 1860s!

    • @MrPeerum
      @MrPeerum 9 лет назад

      wow,thats old,the Dutch railroads are this yaer 175 yaers old/yong.lol.

    • @JawTooth
      @JawTooth  9 лет назад

      MrPeerum
      .Wow, that is old! There wasnt much rail in America back them.

    • @MrPeerum
      @MrPeerum 9 лет назад

      i now that,but the train history is started in Europe.and the first elektrick train was in the Netherlands,from Haarlem to Amsterdam.i wil send you the picture from that train,he is stil riding in the train museum in Utrecht.

    • @JawTooth
      @JawTooth  9 лет назад

      MrPeerum
      Wow, it still works?! I would like to see the picture. Thanks.

  • @NorfolkSouthernES44AC
    @NorfolkSouthernES44AC 9 лет назад +1

    Cool, glad its going to be used again.

  • @Angryrailroader
    @Angryrailroader 9 лет назад

    Cant wait for action to return out there

    • @JawTooth
      @JawTooth  9 лет назад

      Chris Reyolds Me too. I am going to keep checking until the first train comes.

    • @Angryrailroader
      @Angryrailroader 9 лет назад

      Hopefully a black or as I call them Phantom nose SD40T-2 leads

    • @JawTooth
      @JawTooth  9 лет назад

      Chris Reynolds That would be really cool. I have never seen anything other than 4 axle locomotives on that line but since they are going to rebuild it, anything could be possible. I have videos of trains on the line that I have not posted.

    • @Angryrailroader
      @Angryrailroader 9 лет назад

      Well most likely either GP50's or CIND gensets will make the run but who knows

    • @JawTooth
      @JawTooth  9 лет назад

      Chris Reynolds
      That would be my guess. I have been looking for my videos of this line running in the snow and I have not found them yet. There is a house in Cedar Grove Ind. that is only 9 feet from the rails! That part is closed for good but I have a video of a train going by it through the snow. Somewhere.

  • @CaptainJustice166
    @CaptainJustice166 9 лет назад

    Nice!!

  • @gingerrail7368
    @gingerrail7368 8 лет назад +1

    If they improve the line will the other customer come back.

    • @JawTooth
      @JawTooth  8 лет назад +1

      They would come back if the railroad paid for repairs. Nobody wants to pay for it though

  • @gingerrail7368
    @gingerrail7368 8 лет назад

    Is there a time line for when the 9 miles of the line will be up and running again.

  • @shawnstephens9141
    @shawnstephens9141 7 лет назад

    Hey, Jawtooth could you tell me if this line opened up or r they fixing it first.?

    • @JawTooth
      @JawTooth  7 лет назад +2

      A little over a third of the line reopened . They replaced the rail to the elevator and now the trains are running to it. Thanks for watching. Did you see the video I made of the CCET reopening part of an old N&W branch in Ohio?

    • @shawnstephens9141
      @shawnstephens9141 7 лет назад

      Jaw Tooth I think I did see that, but think I may watch it again. I work midnight and sometimes I cannot remember what I watched. I have some news that I feel excited about. Via our passengers service has put a plan forward for a new rout costing 5.3 billion and their be using old rail lines that not has rail for a while. I am hopeful this will happen because some this lines r hasn't had any rail for years. So just like this line ,I am hopeful this will happen