Project Planning Tacts (Irfan Lodhi)
Project Planning Tacts (Irfan Lodhi)
  • Видео 19
  • Просмотров 49 368
P6006 - Import Bulk Activities under the Specific WBS in P6 just in Few Minutes
Add Bulk Activities under the Specific WBS from Excel to Primavera in few minutes.
You are an Engineer but not a Data Entry Operator!
Work Smartly and Increase your productivity.
Follow the link below to watch How to Create WBS from Excel to Primavera in 5 minutes
ruclips.net/video/xtXvPckF2NI/видео.html
Please subscribe to my RUclips channel to remain informed of new videos and following Training session.
ruclips.net/channel/UC7vN00nsBP5uaHutBPYJD3w
Join Facebook Group
groups/1171501816550855
Connect on LinkedIn
www.linkedin.com/in/irfan-khan-lodhi-5a135394/
#projectplanningtacts, #students, #engineers, #primaverap6, #planning, #projectcontrols, #construction, #export, #import,
Просмотров: 6 292

Видео

P6004 - Free Online Primavera P6 Training Session 4
Просмотров 7734 года назад
Assigning the Baseline Programme in Primavera P6 & Update the Progress Manually and through Import from Excel (Instructor: Irfan Lodhi) Follow below link to watch Previous Training Sessions Free Online Primavera P6 Training Session 1 ruclips.net/video/xUn7rkkFEes/видео.html Free Online Primavera P6 Training Session 2 ruclips.net/video/Y9cm lXjY8/видео.html Free Online Primavera P6 Training Sess...
P6005 - Create WBS Structure from Excel to Primavera P6 in 5 Minutes
Просмотров 16 тыс.4 года назад
WBS Structure to create from Excel to Primavera in 5 minutes. Work Smartly and Increase your productivity. Follow the link to watch other Advance Primavera P6 Tutorial Videos. ruclips.net/video/v_4gxv6Wo2w/видео.html Follow below link to watch Previous Training Sessions Free Online Primavera P6 Training Session 1 ruclips.net/video/xUn7rkkFEes/видео.html Free Online Primavera P6 Training Session...
E007 - Create Attractive Gantt Chart Quickly in Microsoft Excel
Просмотров 6514 года назад
Irfan Lodhi shows How to Create Attractive Gantt Chart in Microsoft Excel. You may write down your Email ID in the comment box in order to get the Excel file. These Training videos are in series so please subscribe my RUclips channel to ensure you remain informed of new videos insights. ruclips.net/channel/UC7vN00nsBP5uaHutBPYJD3w?view_as=subscriber Excel Tutorial Playlist: ruclips.net/video/31...
P6003 - Free Online Primavera P6 Training Session 3
Просмотров 1,2 тыс.4 года назад
Free Online Primavera P6 Training Session 3 about Creating and Assigning the Resources held on 03-July-2020 with Participants from different countries arranged by Project Planning Tacts (Instructor: Irfan Lodhi). Follow below link to watch Previous Training Sessions Free Online Primavera P6 Training Session 1 ruclips.net/video/xUn7rkkFEes/видео.html Free Online Primavera P6 Training Session 2 r...
P6002 - Free Online Primavera P6 Training Session 2
Просмотров 9134 года назад
This is the Online Primavera P6 Training Session 2 held on 26-June-2020 with Participants from different countries arranged by Project Planning Tacts (Instructor: Irfan Lodhi). This video is recommended for all Students and Professionals who belong to Construction, Production, Oil and Gas, Energy industries to learn Primavera Basics. #projectplanningtacts #students #engineers #training #free #p...
E006 - How to Apply HLookup Function with Exact and Partial Match in Microsoft Excel
Просмотров 2084 года назад
Irfan Lodhi shows how to use Microsoft Excel smartly, get benefit out of it and increase your Productivity at work. How to apply HLookup Function with Exact & Partial Match in Microsoft Excel. These Training videos are in series so please subscribe my RUclips channel to ensure you remain informed of new videos insights. ruclips.net/channel/UC7vN00nsBP5uaHutBPYJD3w?view_as=subscriber Excel Tutor...
P6001 - Free Online Primavera P6 Training Session 1
Просмотров 3,1 тыс.4 года назад
This is the first Free Online Primavera P6 Training Session 1 held on 19-June-2020 with Participants arranged by Project Planning Tacts (Instructor: Irfan Lodhi). This video is recommended for all Students and Professional who belong to Construction, Production, Oil and Gas, Energy industries to learn Primavera Basics. #projectplanningtacts #students #engineers #training #free #primaverap6 #pla...
E005 - How to Apply VLookup Function with Exact & Partial Match in Microsoft Excel
Просмотров 2684 года назад
Irfan Lodhi shows how to use Microsoft Excel smartly, get benefit out of it and increase your Productivity at work. How to apply Lookup Function with Exact & Partial Match in Microsoft Excel. These Training videos are in series so please subscribe to ensure you remain informed of new videos insights. Excel Tutorial Playlist: ruclips.net/video/319nfE4qk0M/видео.html Follow me here: LinkedIn Prof...
E004 - How to Apply SUMIF Function (SUM with Condition) in Microsoft Excel
Просмотров 1764 года назад
Irfan Lodhi shows how to use Microsoft Excel smartly, get benefit out of it and increase your Productivity at work. How to apply SUMIF Function (SUM with Condition) in Microsoft Excel. These Training videos are in series so please subscribe to ensure you remain informed of new videos insights. Excel Tutorial Playlist: ruclips.net/video/319nfE4qk0M/видео.html Follow me here: LinkedIn Profile: ww...
E003 - Apply Sum Function with Different Options and Shortcut Keys in Microsoft Excel
Просмотров 1384 года назад
Irfan Lodhi shows how to use Microsoft Excel smartly, get benefit out of it and increase your Productivity at work. Apply Sum Function with Different Options and Shortcut Keys in few seconds. These Training videos are in series so please subscribe to ensure you remain informed of new videos insights. Excel Tutorial Playlist: ruclips.net/video/319nfE4qk0M/видео.html Follow me here: LinkedIn Prof...
E002 - Auto Fill Serial Numbers against List of Multiple Items in few Seconds in Microsoft Excel
Просмотров 2904 года назад
Irfan Lodhi shows how to use Microsoft Excel smartly, get benefit out of it and increase your Productivity at work. Change Multiple Words in Different Alphabetic Orders in few seconds. These Training videos are in series so please subscribe to ensure you remain informed of new videos insights. Excel Tutorial Playlist: ruclips.net/video/319nfE4qk0M/видео.html Follow me here: LinkedIn Profile: ww...
E001 - How to Change Multiple Words in Different Alphabetic Orders in few seconds - Microsoft Excel
Просмотров 4614 года назад
Irfan Lodhi shows how to use Microsoft Excel smartly, get benefit out of it and increase your Productivity at work. Change Multiple Words in Different Alphabetic Orders in few seconds. These Training videos are in series so please subscribe to ensure you remain informed of new videos insights. Follow me here: LinkedIn Profile: www.linkedin.com/in/irfan-khan-lodhi-5a135394/ Project Planning Tact...
LEC-003 - Creating or Developing Schedule /Programme in Primavera Lecture 3 - Activity Relationship
Просмотров 4604 года назад
Irfan Lodhi shows how to create or develop a schedules / Programme in Primavera P6 Lecture 3 - Activity Relationships. These Training lectures are in series so please subscribe my Channel for more training videos. Follow the link below to watch the Previous Lecture videos "LEC-001 Create or develop a schedules / Programme in Primavera P6 - Lecture 1" ruclips.net/video/bhDI-lbePKw/видео.html "LE...
PPT0001 - Earned Value is not same as Actual Total Cost How to Prepare Forecast S-Curve?
Просмотров 1,1 тыс.4 года назад
Solution of the Common & Stressful Problem: Earned Value is not same as Actual Total Cost How to Prepare Forecast S-Curve? Irfan Lodhi shows how to fix the most common and stressful problem: Earned Value is not same as Actual Total Cost How to Prepare Forecast S-Curve. LinkedIn Profile: www.linkedin.com/in/irfan-khan-lodhi-5a135394/ Project Planning Tacts Facebook Group: groups/117...
LEC-002 - How to Create Schedule / Programme in Primavera - Lecture 2
Просмотров 1,2 тыс.4 года назад
LEC-002 - How to Create Schedule / Programme in Primavera - Lecture 2
LEC-001- Creating or Developing Schedule / Programme in Primavera - Lecture 1
Просмотров 1,2 тыс.4 года назад
LEC-001- Creating or Developing Schedule / Programme in Primavera - Lecture 1
HOW QUICKLY WE CAN CREATE RESOURCES & ASSIGN BUDGETED UNITS TO ACTIVITIES USING EXPORT/IMPORT OPTION
Просмотров 9 тыс.4 года назад
HOW QUICKLY WE CAN CREATE RESOURCES & ASSIGN BUDGETED UNITS TO ACTIVITIES USING EXPORT/IMPORT OPTION
HOW TO EXPORT AND IMPORT THE ACTIVITIES UPDATES IN PRIMAVERA P6
Просмотров 6 тыс.4 года назад
HOW TO EXPORT AND IMPORT THE ACTIVITIES UPDATES IN PRIMAVERA P6

Комментарии

  • @shakilmiya64465
    @shakilmiya64465 2 месяца назад

    Brother I'm just having confusion that how u mentioned those numbers for wbs id, wbs short name, parent wbs,

  • @mahtabkhan6880
    @mahtabkhan6880 4 месяца назад

    Hello sir do you have any course regarding planning engineering.

  • @mdwajeedali403
    @mdwajeedali403 6 месяцев назад

    Hi sir thnx Can u please tell how u have updated from note pad file to WBS file

  • @roomto820
    @roomto820 9 месяцев назад

    Hello Sir If sequence no. are not come at Excel sheet . Then how to solve this problem😊

  • @muhamedessawy3662
    @muhamedessawy3662 9 месяцев назад

    Thanks and appreciate your report

  • @shijukoshy7649
    @shijukoshy7649 11 месяцев назад

    Can you share the Excel file for practice

  • @danialshaikh7796
    @danialshaikh7796 11 месяцев назад

    33:30 really useful!!!! 🙏🙏🙏🙏 thanks a lot!

  • @danialshaikh7796
    @danialshaikh7796 11 месяцев назад

    Thanks a lot bro🤍🤍🙏🙏🙏🙏

  • @karunanandalelwala9710
    @karunanandalelwala9710 Год назад

    Hi, it is a quick method to create Activities. However, your explanation is very fast and difficult to follow. Could you explain the chart in Excel in a more clear way so that understanding that could be easier. I would suggest you to follow how these things are explained like in TENSIX for example

  • @abdel-nasermohammad5848
    @abdel-nasermohammad5848 Год назад

    AWESOME , THANK YOU ALOT BRO

  • @osamaalshaer7523
    @osamaalshaer7523 Год назад

    Amazing method to create WBS faster. Thanks Irfan, good job

  • @muhamedessawy3662
    @muhamedessawy3662 Год назад

    Great my brother

  • @businessshout228
    @businessshout228 Год назад

    Great 👍

  • @ziya-ur-rahman3852
    @ziya-ur-rahman3852 Год назад

    Great job bro You make it so easy Huge respect to you. Keep it up 😊

  • @Viewpoint-1984
    @Viewpoint-1984 Год назад

    Thanks for sharing the knowledge, however, How can we apply the VLookup if we have the same WBS name (Block 1, Block 2 etc...) in different project phases?

    • @projectplanningtacts5330
      @projectplanningtacts5330 Год назад

      Thanks. There are different ways to do that. All you need is a unique reference to apply VLookup. Activity ID is always unique.

  • @gilanglois1078
    @gilanglois1078 Год назад

    I like this video >3

  • @shaktisouravarautraya7386
    @shaktisouravarautraya7386 Год назад

    What about the remaining duration

  • @shazebkhan172
    @shazebkhan172 Год назад

    It helped a lot, thanks. Superb work.

  • @syedobaid8598
    @syedobaid8598 Год назад

    Can you please share this file

    • @projectplanningtacts5330
      @projectplanningtacts5330 Год назад

      I haven't kept the file but it's not a format but a logic which is explained in the video. You must understand the logic and implement to your required WBS.

    • @syedobaid8598
      @syedobaid8598 Год назад

      @@projectplanningtacts5330 Brother i have use this and it worked , but when i went on using it again its not working, as when i try to copy the wbs using notepad there is something else coming up along with the export, which is guid, templ guid, plan open state, how to resolve it ??

    • @projectplanningtacts5330
      @projectplanningtacts5330 Год назад

      @@syedobaid8598 you need to find out what you have missed or added from the xer file data except replacing the wbs part of the xer in notepad. Basically you need to only change the wbs section from xer in notepad.

    • @syedobaid8598
      @syedobaid8598 Год назад

      @@projectplanningtacts5330 i have changed the WBS only, the main issue is when i export the xer file and open it in the notepad there is some extra columns are coming which are not symmetrical to each other , for example we have all the others columns same which we can copy and paste by adding no. of rows as per your no. of wbs, but these extra columns has some different different texts and words which are not identical, and the extra columns are guid, templ guid, open state, as the data is not identical when i copy and paste also its not working , i have shared one email along with the pictures on your gmail. for better understanding of the issue

    • @ziya-ur-rahman3852
      @ziya-ur-rahman3852 Год назад

      Bro before pasting it on note pad make sure your excel stuff in text formate

  • @neonk3655
    @neonk3655 2 года назад

    thank you so much for this! Quick question, when i use arabic names, the notepad doesn't like it and doesn't save them and give me ????????? instead. do you know how to fix it?

  • @claudiesoondar3577
    @claudiesoondar3577 2 года назад

    Thanks for Sharing

  • @vasudevan7035
    @vasudevan7035 2 года назад

    very useful...i like to join in your whatsapp group how to join sir...

  • @lasanthawalgampola9394
    @lasanthawalgampola9394 2 года назад

    Its good but it doesn't update WBS structure for some reason

  • @hitman-786
    @hitman-786 2 года назад

    Are you in Afcons Infrastructures?

  • @bankimcandrapatel9406
    @bankimcandrapatel9406 2 года назад

    Don't have premavera software. Tx.

  • @AkshayAkki404
    @AkshayAkki404 2 года назад

    Amazing 😁

  • @wendysilva8709
    @wendysilva8709 2 года назад

    Blessings for you, the most helpfull tutorial ever

  • @md.ayaaanlionkinggamer8580
    @md.ayaaanlionkinggamer8580 2 года назад

    Awesome knowledge of Primavera .Yes you are right in institute this much they’re hood extend up to three session .Thank you dear keep loading such useful videos which will help a lot of people .

  • @thenedak
    @thenedak 2 года назад

    Thanks a lot my Friend i know when we work together that you are great Planner this vedio help me too much today

    • @projectplanningtacts5330
      @projectplanningtacts5330 2 года назад

      It's a pleasure to get a kind feedback from one of the best planners I have worked with. 💪

  • @munawarjack91
    @munawarjack91 2 года назад

    Gud Mr. IRFAN I m regularly viewer of your RUclips video on P6 sch. Which help me lot to learn more and thanks for your informative video I need video on activities relationship from excel to P6 as u said in one of your Video I request for you urgently assistance Thanks in advance Alhz MUNAWAR

  • @ezekiellinc2732
    @ezekiellinc2732 2 года назад

    Thank you sir. I watched your and been helpful. but I have an issue. why is it that when I entered the labour budget unit of 10,000 for an activity but showing 80,000 for budgeted Labour cost??? I was expecting if I entered 10,000. also 10,000 should be in the budgeted labour cost for that activities. thanks

    • @projectplanningtacts5330
      @projectplanningtacts5330 2 года назад

      Please go to Resource details and see the Price/ units and make it 1

    • @ezekiellinc2732
      @ezekiellinc2732 2 года назад

      @@projectplanningtacts5330 I have done that but the issue still persist.

  • @ramiepayas909
    @ramiepayas909 2 года назад

    I found this method but it doesn't seem to work on my P6 V21. It always has an error message with this. I tried importing 279 WBS. Import Failed: The import file contains projects with invalid parent WBS IDs. The following WBS nodes do not have a valid parent_wbs_id in the wbs_id field. Tried it multiple times but it has the same error message.

    • @projectplanningtacts5330
      @projectplanningtacts5330 2 года назад

      I believe you might be missing something. The method is same for any XER file regardless of the p6 version. Well, I haven't tried that in p6 v21

    • @ramiepayas909
      @ramiepayas909 2 года назад

      @@projectplanningtacts5330 I created the Project and then the exact WBS Structure in P6 with 276 WBS Items. I exported the XER File, then I just renamed the WBS Name. When I imported back the XER File in P6 it says: Import Failed: The import file contains projects with invalid parent WBS IDs. The following WBS nodes do not have a valid parent_wbs_id in the wbs_id field. I just can't seem to execute this process. It is quite time consuming to manually type all 276 WBS Name in P6.

    • @ziya-ur-rahman3852
      @ziya-ur-rahman3852 Год назад

      Make sure all of your stuff in excel must be in text firmate

  • @nooni3420
    @nooni3420 3 года назад

    Hi Irfan, so once you have done the import to p6 from excel when do you change the data-date. Or you change the data-date first and then export the file to excel and do your updates and import back. Im interested to know at which point exactly we change the data-date.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      It depends what purpose would you like to export and import. If it is only for updating the activities then the data date is irrelevant to change or not. When you export and import back with updates, you would update Activity %, Actual Dates. So if you change the data date and export with Start and Finish, you can't import Start and Finish as these dates do not change.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      If you use Physical % Complete then it is recommended to export Activity %, Actual Start and Finish and Remaining duration for Inprogress activities, update these fields and import back and then change the data date.

  • @Dozmar_96
    @Dozmar_96 3 года назад

    Sir Please Mere Ek File Hai, Usko Mein Primavera P6 MS Project Ko Export Our Import Kar Raha Ho, But Nahe Ho Raha, Kindly Please Help Me.

  • @rogeriopsvalle
    @rogeriopsvalle 3 года назад

    Mr. I hope this message finds you well. Do you have by any chance, tips or Works related to criation of S Curve with primavera P6 conected to SQL DB If you could share I would aprecciated. Thanks in advance Regards.

  • @rubenaugustine8666
    @rubenaugustine8666 3 года назад

    Thank you for this video. Wh I tried to import the file, P6 closed up. Any thoughts?

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      If it happens again and again you need to check if your machine is not performing good. I don't think it's P6 issue. You may also try to uninstall and reinstall P6.

  • @albertamoadu9309
    @albertamoadu9309 3 года назад

    Hello thanks for this video. It's very resourceful. Could share with me how to easily obtain the budgeted labor and non labor units and where ?

  • @ssarkar2006india
    @ssarkar2006india 3 года назад

    Excellent presentation

  • @ssarkar2006india
    @ssarkar2006india 3 года назад

    Very nice

  • @P6Qusai
    @P6Qusai 3 года назад

    thank you very much, you are LIFE SAVER i really appreciated the helping its very useful & fast, i wish you the best

  • @Muhammadjaved-qi8nr
    @Muhammadjaved-qi8nr 3 года назад

    Sir, Please primavera download and installation is b 1 led den.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      Hi Please follow the link facebook.com/groups/1171501816550855/permalink/1177583062609397/?sfnsn=mo

  • @nooni3420
    @nooni3420 3 года назад

    Salam, this vdo was super helpful. Although I am having a small issue. Iv got 5 boq items against 1 activity. So when i prepared the data sheet I have assigned the same activity id to all the 5 boq items for reference purpose. But when i import them in p6. P6 picks up only one boq item remaining 4 items are missing. I have sent u an email, if you dont mind having a look plz. Thanks.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      W Salam, P6 will consider first activity as resource. If you have 5 BOQ items are related to same resource then add the units otherwise if these 5 items are related to different resource then assign the different resource id to the same activity and it should work.

  • @penuelraybantog5457
    @penuelraybantog5457 3 года назад

    Is not that necessary to convert the number to text on your Budgeted Units column? What I knew was that primavera only accepts text format from imported spreadsheet. Why does the primavera still accept and read the data, even though the Budgeted Unit column was on a number format?

  • @mahaboobjan4355
    @mahaboobjan4355 3 года назад

    Can you please explain duration types ??

  • @civilengineeringscout
    @civilengineeringscout 3 года назад

    excellent brother

  • @nooni3420
    @nooni3420 3 года назад

    This was amazing as usual. But I am wondering what extra step I need to take if I need to upload all activities but under multiple wbs not just one wbs.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      Process will remain same. You need to make sure while importing that the WBS code assign to the activity which is relevant to it.

    • @nooni3420
      @nooni3420 3 года назад

      @@projectplanningtacts5330 got it thanks

  • @shakibulkabir5292
    @shakibulkabir5292 3 года назад

    why you put 800 in budgeted unit?? you calculated 400 in excell sheet.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      800 was total Budgeted unit for an activity but I have assigned 2 resources onto an activity which is Technician and Helper each having 400 units. Thanks

    • @shakibulkabir5292
      @shakibulkabir5292 3 года назад

      @@projectplanningtacts5330 Thank you. but you put 800 for technician but in excel it is 25x8x2 technician=400. Can you explain a bit details???

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      @@shakibulkabir5292 If I did even there was no intentions. I calculated the budget just to give an idea.

    • @shakibulkabir5292
      @shakibulkabir5292 3 года назад

      @@projectplanningtacts5330 Thanks again.

  • @nooni3420
    @nooni3420 3 года назад

    Salam Irfan this is awesome stuff. Can you please upload a video for how to update big schedules from subcontractors by using excel to p6.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      W Salam Please have a look ruclips.net/video/BDnJn4ro5Sk/видео.html

    • @nooni3420
      @nooni3420 3 года назад

      @@projectplanningtacts5330 thanks Irfan bhai but this is uploading activities. I meant to say receiving monthly progess updates from subcontractors in excel and uploading them in p6. I have heard that big schedules like 15,000 activities. Mostly planners dont update the schedule in p6. They get their subcontractors to provide updates in excel and then planner uploads them to p6. I am sure you must have come across this.

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      @@nooni3420 as long as you have updates in excel, you can update those activities through import to P6. The process is same as I mentioned earlier.

    • @nooni3420
      @nooni3420 3 года назад

      @@projectplanningtacts5330 Makes sense. Thanks :-)

  • @mohamedgasim2526
    @mohamedgasim2526 3 года назад

    PLEASE! I want know how to create activity relationships by excel and imported them to p6?

  • @munawarjack91
    @munawarjack91 3 года назад

    Aslm Mr.Irfan saheb I m a regular viewer of ur RUclips videos on primavera p6 on wbs but i need to learn how u prepare excel wbs in excel and if u have prepare relationships feom excel to p6 tutorials then share it link to learn more about it i will be thanks for your help Alhz

    • @projectplanningtacts5330
      @projectplanningtacts5330 3 года назад

      Thank you for watching my videos. If you follow the video you understand how I am defining the codes. There is a logic behind it but not any external links etc. Try to understand the method. I do not keep excel files for videos. I demonstrate and remove it. Good luck 👍