Honnacotts Meadow - Wk 56 - skimming, rendering, insulating, blocking final house gables
Wk 56 -
• Plot 1 - plasterboarding is set to begin. Air source heat cables are insulated beneath the underfloor heating.
• Plot 2 -insulation in ready for underfloor heating pipes to be set in this coming week. Further insulating roof slopes upstairs.
• Plot 3 - masons begin to build up the gable ends.
• Plot 4 - skimming starts on ground floor of plot 4 and rendering continues as well with the dry weather.
• Plot 5 - floors heat up a degree each day.
• National Grid ready everything for the cable diversion link up.
A 18-month project to create 5 beautiful, homes, inspired by old country buildings, filled with character combining old and new. A wealth of natural materials in energy efficient hom...
Просмотров: 29

Видео

Honnacotts Meadow - Wk 55 - Cable laying for electric diversion; Oak stairs go in plot 5
Просмотров 112День назад
Week 55 ~700 meters of electric cable is run into the trenches, along with an earth cable. Covered over with fine grave and yellow hazard tape and back filling has begun. ~Plot 1 - sees floor insulation go in, ready for underfloor heating cables. Dormers ready to be rendered. ~Plot 2 -Roof slating completes with roof lights in place. ~Plot 3 - Stacked out with blocks awaiting the masons. ~Plot ...
Honnacotts Meadow - Wk 54 - Slating; rendering; grouting showers; hard-waxing stairs
Просмотров 7214 дней назад
• Plot 1 - Red ridge fitted • Plot 2 - Ash door frames are fixed in place. Slating on front pushes on. • Plot 3 - Insulation pushes on whilst waiting for brickies. • Plot 4 - Showers grouted. Heating of floors turned on for the curing process. • Plot 5 - Top coat render pushes on, stairs are hardwaxed for protection before fitting, painted top coat on walls throughout. Showers grouted, oak sink...
Honnacotts Meadow - Wk 53 - Painting; oak skirting; tiling showers and floors; roofing and rendering
Просмотров 9421 день назад
Wk 53 ~ Plot 5 - Painting, templating oak skirting around corners, tiling showers and floors start. ~ Plot 4 - Underfloor heating started to slowly dry out the floors. ~ Plot 3 - Polythening window to keep out the weather. ~ Plot 2 - Slating completing on the back, ready to start the front. Stud work all in place ~ Plot 1 - First fix electric and plumbing begins. A 18-month project to create 5 ...
Honnacotts Meadow - Wk 52 - Roofing; Slating; Plastering; Rendering; Painting
Просмотров 41Месяц назад
Wk 52 Plot 1 - Roof insulation; slating complete awaiting ridge tiles; stud walls set out Plot 2 - Felt and battening the roof. Plot 3 - Timber roof work almost complete. Plot 4 - Gutters fixed; interior slates sills; inglenook built; dot and dabbing continues. Plot 5 - Rendering starts and painting inside commences. A 18-month project to create 5 beautiful, homes, inspired by old country build...
Honnacotts M Week 51 - trusses go up on plot 2
Просмотров 24Месяц назад
Week 51 Plot 1 - Slating completed on front and continuing on the back. Stud walls are all up ready for electricians. Plot 2 - insulating the roof starts. Plot 3 - trusses are lifted into position. Plot 4 - plastering continues and guttering is fixed on dormers, ready for render. Plot 5 - plastering all completed and oak staircase is delivered. A 18-month project to create 5 beautiful, homes, i...
Honnacotts M Week 50 - Slating continues; studwork; insulation, plasterboard and plastering
Просмотров 31Месяц назад
Week 50 Plot 1 - Slating continues with sky lights fitted. Stud walls are mapped out and go up Plot 4 - Insulation, plasterboarding and the start of plastering. Plot 5 - Plastering all completed. Inglenook beam in place. A 18-month project to create 5 beautiful, homes, inspired by old country buildings, filled with character combining old and new. A wealth of natural materials in energy efficie...
Honnacotts M Week 49 - Slating plot 1; Prep for final truss roof; plasterboard and plastering
Просмотров 96Месяц назад
Wk 49 • Plot 1 - slating continues with skylights starting to go in. • Plot 2 - blocking completed. • Plot 3 - concrete and steel lintels in readiness for the trusses. • Plot 4 - insulating and plasterboarding continues. Slate sills are cut to size & shape & fitted. • Plot 5 - plastering continues. • Trench work for the cable diversion continues. A 18-month project to create 5 beautiful, homes,...
Honnacotts M Week 48 - felt and batten; ash door linings, dot & dabbing; cable trench dig starts
Просмотров 1042 месяца назад
Wk 48 Plot 1- roof felt and battened and plumbing started. Plot 2 - overhang rafters and roof lights in. Plot 3 - outer skin block work built. Plot 4 - studwork, insulation and plaster-boarding . Plot 5 - further dot & dabbing and plastering. Trench work for the cable diversion is underway. A 18-month project to create 5 beautiful, homes, inspired by old country buildings, filled with character...
Honnacotts M Week 47 - Timber structure on plot 2; plot 3 blocking; plastering plot 5
Просмотров 662 месяца назад
Week 47 • Plot 1 - flue pipe is fitted, block corners softened • Plot 2 - timber front structure put in place. • Plot 3 - block walls go up. • Plot 4 - front roof completed with sky lights in. Insulation in stud walls and plasterboarding begins. • Plot 5 - plastering all but completed upstairs, waiting on slate windowsills. Plastering downstairs continues. All dormers painted. • Hedgebank - at ...
Honnacotts M Week 46 - Plastering; slating; bi-folds in; final timber fronts made; concrete plinths
Просмотров 932 месяца назад
Wk 46 - Plot 5 - Plastering; dormers rendered; bi-fold doors and stable door are fitted; guttering on Plot 4 - Slating pushes on; bi-fold doors and stable door are fitted. Plot 1 - felt and battening commences. Plot 2 - Outer skin of blocks is built at front and on gable ends Workshop - Last of the timber fronts are completed in the workshop; More timber plinths are cast. The site is cleared of...
Honnacotts M Week 45 - Dot and dab plasterboarding; slating plot 4; front timbers; moving subsoil
Просмотров 662 месяца назад
Wk 45 Slating on plot 4 with back completed and front stacked and ready. Dot and dabbing plasterboard downstairs in plot 5. More front timbers built in the workshop. Subsoil removal with over 1,000 tonnes already taken offsite to build new farm hedgebanks. A 18-month project to create 5 beautiful, homes, inspired by old country buildings, filled with character combining old and new. A wealth of...
Honnacotts M Week 44 -- Soft rendered dormers; Screed over underfloor heating pipes in plots 4&5
Просмотров 1042 месяца назад
Wk 44 Plot 1 - Incorporating the front timber gable, and overhang, into the roof structure. Prepping dormers for render. Plot 2 - building the dormers. Gable ends going up. Plot 3 _ awaits blocking. Plot 4 - screed put in over the underfloor heating pipes. Roofers back from hols next week. Plot 5 - screed also goes in over heating pipes. Dormers scratch-coated at back and finished with soft rou...
Honnacotts M Week 43 - Trusses; hefty overhang timbers; slating; underfloor heating; subsoil away
Просмотров 313 месяца назад
Wk 43 Plot 1 - insulation continues; front hefty timbers of roof overhang, are put in place. Plot 2 - trusses are up and front wall inner skin is built. Plot 4 - underfloor heating pipes are fixed in place; back of roof slating continues. Plot 5 - underfloor heating pipes all fixed in place ready for screed. Subsoil - the huge piles of subsoil stacked when the weather was too wet, are being tak...
Honnacotts M Week 42 - floor insulation; plasterboarding ceilings; battens & slating, new hedgebank
Просмотров 1243 месяца назад
Wk 42 Plot 1 - end gables built; roof insulation goes in before the felt. Plot 2 - floor joists are fitted, ready for the trusses to be lifted into place. Plot 4 - floor insulation in; inside corners chipped are round; front and back roof battened; slating starts on the back Plot 5 - floor insulation in, downstairs ceilings insulated and plasterboarded; dormer windows readied for rendering. Ent...
Honnacotts M Week 41- Plaster-boarding completes upstairs in plot 5; Roofers begin plot 4
Просмотров 303 месяца назад
Honnacotts M Week 41- Plaster-boarding completes upstairs in plot 5; Roofers begin plot 4
Honnacotts M Week 40 - Slating continues, plaster-boarding, first fix electrics, truss ready plot 2
Просмотров 883 месяца назад
Honnacotts M Week 40 - Slating continues, plaster-boarding, first fix electrics, truss ready plot 2
Honnacotts M Week 39 - slating continues; vapour barrier goes in; dormers built on plot 4
Просмотров 444 месяца назад
Honnacotts M Week 39 - slating continues; vapour barrier goes in; dormers built on plot 4
Honnacotts M Week 38 - Plot 3 trusses are lifted on; Slating starts; Dormer and Velux windows
Просмотров 384 месяца назад
Honnacotts M Week 38 - Plot 3 trusses are lifted on; Slating starts; Dormer and Velux windows
Honnacotts M Week 37 - Trusses arrive for plot 1; roof overhang timbers in place on plot 4
Просмотров 304 месяца назад
Honnacotts M Week 37 - Trusses arrive for plot 1; roof overhang timbers in place on plot 4
Foxtail Meadow - Turfing, prepping paths and patio bases, rendering.
Просмотров 564 месяца назад
Foxtail Meadow - Turfing, prepping paths and patio bases, rendering.
Honnacotts M Week 36 - Roofers begin battening, 1st fix plumbing, log burner flues fixed
Просмотров 494 месяца назад
Honnacotts M Week 36 - Roofers begin battening, 1st fix plumbing, log burner flues fixed
Honnacotts M Week 35 - Hefty timbers go in, walls go up plot 3, rainwater drainage pits are dug
Просмотров 435 месяцев назад
Honnacotts M Week 35 - Hefty timbers go in, walls go up plot 3, rainwater drainage pits are dug
Honnacotts M Week 34 - blocking, last slab poured, rainwater pipework & manholes, first fix wiring
Просмотров 395 месяцев назад
Honnacotts M Week 34 - blocking, last slab poured, rainwater pipework & manholes, first fix wiring
Honnacotts M Week 33 - walls start, prep for last slab pour, sun shines
Просмотров 605 месяцев назад
Honnacotts M Week 33 - walls start, prep for last slab pour, sun shines
Foxtail - Paving & Fencing
Просмотров 745 месяцев назад
Foxtail - Paving & Fencing
Honnacotts M Week 32 - Trench blocks are laid; wall insulation starts; studwork goes up
Просмотров 595 месяцев назад
Honnacotts M Week 32 - Trench blocks are laid; wall insulation starts; studwork goes up
Honnacotts M Week 31 - Last footings dug and concreted; slab poured; marking out stud-work walls
Просмотров 615 месяцев назад
Honnacotts M Week 31 - Last footings dug and concreted; slab poured; marking out stud-work walls
Foxtail Meadow - Week Latest Update - Plot 2 - almost complete inside; gravel round plots 4 & 5
Просмотров 376 месяцев назад
Foxtail Meadow - Week Latest Update - Plot 2 - almost complete inside; gravel round plots 4 & 5
Honnacotts M Week 30 - Concrete slab pour, Roof insulation, Felt and batten.
Просмотров 486 месяцев назад
Honnacotts M Week 30 - Concrete slab pour, Roof insulation, Felt and batten.