20240518JA5137

Поделиться
HTML-код
  • Опубликовано: 18 май 2024
  • Sewerscope video inspection of the buried sewer lateral from the floor toilet flange plug in the unfinished basement. The sewer lateral was cast iron and then transitioned to clay tile at approximately 40-feet. The clay section had the beginning of tree root intrusions at regular intervals 8-feet apart where the coulplings connect. There were no solid accumulations and drainage was acceptable. I recommend tree root remval every 2 years as a prevenative maintenance measure.

Комментарии • 1

  • @TwinPhoenix666
    @TwinPhoenix666 10 дней назад

    For some reason, I anticipated some type of horror in this video. As a plumber, I can't say that there is a certain aspect of horror in this video, but that's not the type of horror that I built up in my mind before actually watching this