Baltimore Key Bridge controlled demolition

Поделиться
HTML-код
  • Опубликовано: 12 май 2024
  • Crews are expected to conduct a controlled demolition Monday evening to break down the largest remaining steel span of the collapsed Francis Scott Key Bridge in Baltimore, a major step in the cleanup as officials seek to fully reopen the port’s busy shipping channel by the end of the month.
    DETAILS: www.fox5dc.com/news/baltimore-key-bridge-collapse-controlled-demolition-scheduled-for-monday

Комментарии • 4

  • @6B8RX
    @6B8RX 24 дня назад +4

    For the interesting part, skip ahead to 52:45.

    • @frankrizzo5594
      @frankrizzo5594 24 дня назад

      You are both a gentleman and a scholar.

  • @dalesnider8040
    @dalesnider8040 24 дня назад

    If the iron rich portion flows settles downward toward the sea, should be little chance of hazardous material disturbing wildlife downstream.

  • @keithschneider6348
    @keithschneider6348 24 дня назад

    Looks like headway, can't hook it up an drag it out of the way now. Couple Dereks take some weight.