- In this Video Lecture you are able to learn Quantity for Center line Method. Quantity for Foundation on Center line Method.
To Read Articles :www.civilglobal.com
In This channel You can Learn about Civil Engineering Update Videos which are using generally in civil Engineering. So please subscribe our channel for daily Update Civil Engineering.
If you have any questions. Feel free to contact me.
My Facebook ID / samiullahsta. .
Website:www.civilglobal.com
Facebook page: / civilenginee. .
_________________________________________________________________
Quantity of Cement , sand and Aggregate in Concrete.
New Video Lecture Billing of Quantity
ruclips.net/user/edit?o=U&vide...
_________________________________________________________________
You Can Watch in this channel:
DAE Civil
BS Civil Engineering
BE Civil Engineering
B-Tech Civil (Technology)
Quantity Surveying
Thanks for watching and supporting Us.
-----------------------------------------------------------------------------------------------------------
To Subscribe Our channel Click on Red Button and Also Press the
Bell Icon
-----------------------------------------------------------------------------------------------------------
thank you
this is not centre line method, in centre line you have to consider the T junctions, in your plan you have to consider 2 T junctions and total length of wall will be length-(number of junctions)×breadth/2
here we have two junctions . the formula is length - ( number of junction)x breadth/2 so they cancelled each other like 2 x breadth/2 is equal to breadth understood
Correct
How to control estimated cost during construction. Click on the below link to know.
todayconstruction.blogspot.com/2020/06/post-contract-phase-this-is-from.html
Thank you Khan sahab!!! Stay Blessed and excel further
And where is T section deduction ? Because at the intersection of the wall you are including the region of superposition of walls so you have to remove that superimposition of wall portion .
Hello I was thinking during “centerlines method” you take the following into account. No. Of T junctions and excavation width/2.
TW= CL- width/2 *No of T junctions
Assalamlikum Sir this is shakir here from india ۔۔۔۔I always watch your video ۔۔۔and your teaching style is too Good ۔۔۔you are too Coprative ۔۔۔۔thanks a lot sir
really a splendid explanation, teaching nd presentation as well🙏🙏🙏
Sir, I'm glad to see this video... Thanks for uploading....
I'm easily understand the concept... 👍
Very nice explain ....your contact is....?
How to control estimated cost during construction. Click on the below link to know.
todayconstruction.blogspot.com/2020/06/post-contract-phase-this-is-from.html
1) foundation concrete:bed width=0.8m,depth=0.2m
2) foundation s. S. Masonry: width=0.5m,depth=0.2m.
3) basement: width=0.4m depth=0.4m
4)DPC(1:2:4): width=0.4m depth=0.15
5) external walls are of 30cm & partition walls 20cm thick
6) all round lintel 1:2:4 ,0.15m depth
7) height of roof from plinth=3.5m
really helpful vedio sir thanks for uploading
very nice and understanding video sir thank u so much for this
Thanks for helping finding Quantity
Very useful information dir for everyone special for new students
Is there anything like deduction of T junction while calculating wall length.?
Thanks a lot My Friend
Plz explain long and short wall method for residential buildings... Having more then 3 rooms, varndah..
Is type se.. PlZz..
Shubh 9028 right bro
Shubh 9028
Right bro
Ya explain both center line method and long wall short wall method of residential building with more than 2 rooms
How to caluclate the center line method for finding the quantiny of plastering
Thanks Bro
Good Work
Very nice explanation sir and I require continuation of centre line method ,and also plan and section method.please reply to me sir
Thank u bro u r just awesome
Thank you so much sir.
awesome sir g...
Good video plz add T joint calculation and DPC calculations
Nice sir .i ha e an one video of reinforcement
Nice video help estimating
Brother your method is totally wrong. The lengths of the walls will change according to the breadths. You forgot all about T joints, and it made all calculations wrong. If you write this in exam teacher will give 0. No mercy. But i like your slow explanation, please learn the proper way first and then delete this video and do one more.
Correct
How to control estimated cost during construction. Click on the below link to know.
todayconstruction.blogspot.com/2020/06/post-contract-phase-this-is-from.html
T junctions is double calculations why...not decrease T junctions area..
Many thanks sir 👍👌
please upload full video from foundation to finishing level like plastering, painting
how to do estimation for multi-storied building with mat foundation...
Super explanation
Very nice video
in paprapet wall calculation is varandah excluded, as paprapet wall is an extension wall ?
and is varandah part taken in consideration for calculation of foundation work as foundation isnt required i guess ?
With respect I question u...
It is easy to understand if u calculate the length of long wall and short wall seperately( in description).
please explain reinforcement calculation for slab & staircase
DEAR, IN THIS CENTRE LINE METHOD HAVE ONE MORE EQUATION . YOUR TOTAL LENGTH IS CLEAR BUT WHEN YOU MENTIONED IN TABLE LENGTH IS DIFFERENT THERE HAVE ANOTHER EQUATION WE HAVE NEED. [LENGTH ANY ITEMS= C.C LENGTH -(1/2 * NO.OF JUNCTIONS*WIDTH OF WHICH ITEM YOU NEED )] . THE NO.OF JUNCTIONS ARE CONSIDERED AS A " T" JUNCTIONS HOW MUCH HAVE.
Your New Subscriber
nice job sir very nce
I can understand easily about yours
Thanks.... Sir
it is good presentation.sir can you comment me how can i calculate volume of earth work in footing construction?
Tahnk u so much
great work sir aage ka video jaldi bhejiye estimating costing ka cl method
I think there are some corrections! Check the centre line method!
#civilengineersphilosophy
Awesome
well done
Thank you
super bro
Sir why did you not deduct t Junction length
Sir can you please make a video of step by step construction process from footing to roof slab concrete
Sir can you explain T junction question with center line method
B/w in foundation and plinth. 1st footing 2nd and b/w upto dpc
thanks for your explanation
Fantastic explanation
thanks sir
Assala mualikum .hope u will be fine .Plxxx long wall short wall method sir G.lots of luvv.
Thanx sir
Walikum assalam sir bhaut shukriya sir
Please upload long wall and short wall method sir
Very nice
Why u do not (-) junction in middle wall ?
thnxx sir..how do setting out ?
thanks
very nice
Explain with room having arch & semi circular room
Thanku sir
thx sir
Bro... Foundation for External walll and centre wall both section are different then How you can apply for external and internal walls
in short wall u hv takn 4.3m
& in long wall u hv nt done 0.30/2
How to control estimated cost during construction. Click on the below link to know.
todayconstruction.blogspot.com/2020/06/post-contract-phase-this-is-from.html
Thanks
why didnt u reduced 0.5*number of t junctions*width of the item?
lalu yadav he teaches wrong metho...this method is does not call centerline, he didn't shows the calculation for t junctions and and other reductions
he teaches wrong metho...this method is does not call centerline, he didn't shows the calculation for t junctions and and other reductions
plz upload a problem of 3 or more rooms with deduction ....and solved by centre line method
Good morning sir
I have a one dought ..If you long walls do we excavate the land with the breadth of 0.9 m
Then after short walls doing already land was exacvate in edges of short walls... But again you considered the total length of short wall..4+0.3
Instead of 4+0.3-0.45-0.45(already land was excavated in long walls)
Make a video on mat foundation detail explain
cws Thanks but where is the other parts of the building plz complete of all parts
its very easy to solve , why you make it a big problem
Waliykum asslam
Why length is same in all item
Aap T junction ko reduce nhi kye exact length me
I think wrong process. Reduce the 0.9m from total length in concrete
Thanks sir. Your video is too good😊😊
Salam Alikom- where is T section deduction ? Because at the intersection of the wall you are including the region of superposition of walls so you have to remove that superimposition of wall portion
U dint remove .5 times the value of t junction where middle wall meets
Are you excavating for foundation all along the wall ? And building foundation all around the wall ? Brick work is done all around so we can take total length but why for excavation and footing all around the wall ?
nice
T junction deduction missing, net center line length changes I guess
I think your centre line for earthworks is wrong , instead of focusing on 300mm wall you were supposed to extend both long and short walls by 0.9 (0.3 x 3 )2 from concrete footings , now the way you have done it is as if your excavation is 300mm wide so instead of 28.1m length I suggest you add (3x 0.3mm) twice on both long and short walls otherwise I concur with you entirely on the approach not necessary the answers.
I also think that.
I also think that.
I tot we should consider working space in calculating the quantity of earth work in excavation...is it true??
I was also thinking that... (Y) excavation free area should be add ( 2*0.3m) =0.6m in long and short wall
Gggg
The word "ok" has been used so many times i csnt recall a second in the Video it wasn't mentioned
तुमको भी जय श्री राम भाई
Nice
Length of long walls = 2 ( 3.5 + 3.5 + .30 + .15+ .15)
= 15.2 m
Is it correct?
Did he add .30 on wall then use the center line deduction for both?
Calculate remaining categories in building i.e, painting, plastering,etc...
Length of long wall should be 15.5m. Notice that center wall between rooms
Sir u estimate by centre line method but why u not deduct T-junction...
Plz answer me....
bro in this center line method u cant substraact coz this will be the actuall length right
In super structure you are taking the length as 3.20m but actually it is 4 m
How to calculate for column base in substructure
Samajh me Aa gya
Difference between long wall short wall metnod and center lime method
Sir you are taking total length in earth work excavation but we are not dig total length of wall cross section we are doing earth work only at six palaces 3-one side
3-other side only please clarify sir
Plzz can u do it in long wall and short wall method
Sir Aapne junction fine Karna Nahi batata plz sir ek Pura plan leke samjav and all material are consider plz