How to Ballast an O-Scale Switch - Part 1 of 2

Поделиться
HTML-код
  • Опубликовано: 4 ноя 2024

Комментарии • 16

  • @ronstrainsandmore
    @ronstrainsandmore 4 года назад

    You do an excellent job on your trackwork Eric your layout is just hands down absolutely outstanding great job my friend you do some great work your very talented

  • @garyjust.johnson1436
    @garyjust.johnson1436 2 года назад

    Awesome video, very useful!

  • @ThEBoOgEyMaN666
    @ThEBoOgEyMaN666 16 лет назад

    keep posting dude, im learning so much from your videos, now im using the classic 3 rail style so this stuff wont exactly work for my setup but keep posting i love your layout, and i love your videos.

  • @Ericstrains
    @Ericstrains  16 лет назад +1

    Yeah, they work fine. I've never had any major problems with them.

  • @davidstrainsandlego
    @davidstrainsandlego Год назад

    Commenting on every ericstrains video 48

  • @Ericstrains
    @Ericstrains  14 лет назад

    I use a track cleaning car filled with acetone to clean the rails. I did a video on it, so just check out my list of videos.

  • @Ericstrains
    @Ericstrains  14 лет назад

    @97trainman You can use any material you want. I choose to use real ballast.

  • @Chessie9009
    @Chessie9009 13 лет назад

    @esiegel76 well you've been lucky=) i've had one burn out in a tunnel=/ im only using a lionel 180w powerhouse but i guess even thats enough to make them go (over time of course). well hopefully none of yours ever have that problem! haha

  • @97trainman
    @97trainman 14 лет назад

    I know a guy that uses a cheaper substitute than what you bought but looks exactly the same, he uses chicken feed, the feed that you give to the baby chickens, or chicks.

  • @Chessie9009
    @Chessie9009 13 лет назад

    hey eric. i have been using atlas track on my layout for about 5 years now and i was wondering if you have been having issues with the connectivity of the middle rail. there is a jumper wire underneath the switch that connects both ends of the middle rail. the problem is that the gauge of the wire is too small and cannot handle the 18v and burns out. i have had about 6 switches now that have had that problem. i just use jumper wires under the table to reconnect it. Common problem?
    -Chris

  • @Sams_Trains
    @Sams_Trains 7 лет назад

    How did you order the Flexxbed?

  • @Ericstrains
    @Ericstrains  13 лет назад

    @Chessie9009 I've never had that problem myself, no.

  • @djmpvae27091978
    @djmpvae27091978 12 лет назад

    What is the middle track 4? It is the same system in the London tube train.

  • @Ericstrains
    @Ericstrains  15 лет назад

    Apparently not. :)