BATTERY LOAD CYCLE PROFILE

Поделиться
HTML-код
  • Опубликовано: 15 янв 2025

Комментарии • 18

  • @aatirehrarsiddiqui8894
    @aatirehrarsiddiqui8894 Год назад +3

    Excellent video.

  • @tamjidkabir1543
    @tamjidkabir1543 Год назад +3

    This is so good! Thank you sir.

  • @vinayshrisahay
    @vinayshrisahay 2 года назад +5

    great Job, it is very useful for engineers .

  • @RaoBonala
    @RaoBonala 10 месяцев назад +1

    Battery sizing is direct summation of all load profiles?
    I saw some negative numbers for some load profiles. Why?

    • @ameeraadmi-td5qw
      @ameeraadmi-td5qw 7 месяцев назад +1

      L2 has time .2 sec but put it behind L3 why. please reply. the channel owner will not reply.

  • @IDK-zg8wy
    @IDK-zg8wy 2 года назад +4

    Sir, can you make a video for 3 incommer 2 coupler sizing for example 3-2mva tx and how to consider the load shedding for this type of system.

    • @theelectricalsolutionschan1095
      @theelectricalsolutionschan1095  2 года назад +4

      Sizing of the transformer is dependent on the load being fed by the transformer and not on Incomer /Buscoupler combination. In your case, for example, if the 2 Incomers are normally sharing the total load and the 3rd Incomer is just a standby incomer and switched ON in case of failure of any of the 2 Incomers, then the transformers should be sized to carry half of the total load.
      Load Shedding will depend of total Power Generation and total load.

  • @IDK-zg8wy
    @IDK-zg8wy 2 года назад +4

    Sir let me elaborate my query, in addc they required bus coupler in lvpanels in the same room. Say for example i have 2 lv panel which is in the same room. Since the bus coupler is required for maintenance and alternative source, so the sizing of my transformer will be 1tx supplying the demand load of 2 bus? Then the sizing of bus coupler and busbar will be on the sum of MDL of mdb 1 and mdb2.
    CASE2 if incase the sizing of thansformer 1 and 2 is for the dedicated bus section then load shedding will be considered since the mdl of 2 bus section will cause overloading inf incase 1 tx is failed or during maintenance.

    • @IDK-zg8wy
      @IDK-zg8wy 2 года назад +4

      Can i email you sir the sld so you can understand what im saying?

    • @theelectricalsolutionschan1095
      @theelectricalsolutionschan1095  2 года назад +4

      Thanks for your comments. Your configuration is not clear, However, if the transformer is required to supply loads of ONLY 1 bus then it should be sized to carry the loads of 1 Bus only. In case, the transformer is required to carry loads of the 2nd transformer also (in case of a fault in the 2nd Transformer), then the transformer should be sized to carry loads of both the buses.

  • @IDK-zg8wy
    @IDK-zg8wy 2 года назад +4

    Say for example 2 tx is for residential and 1 tx is for motors and emergency

  • @nareshdadi1441
    @nareshdadi1441 Год назад +4

    Clear explanation, very happy for your concepts..
    Could you please explain how to size a Battery bank based on this battery load profile..
    Also sizing of an Emergency Diesel generator.

    • @theelectricalsolutionschan1095
      @theelectricalsolutionschan1095  Год назад +3

      Thanks. Glad that you found the video useful. Please let me know your comments on my other videos. Please do subscribe to my channel and share with your friends. Videos on the above topics are under preparation and will be uploaded shortly.

  • @ameeraadmi-td5qw
    @ameeraadmi-td5qw 7 месяцев назад +1

    L2 has time .2 sec but put it behind L3 why.