Cool little attachment beats the hell outa the way we do trenches, hey why doesn't the guy on the ac joint just bump in the excess rock with a rake before the roller hits it? Would be faster and cleaned then scraping with a shovel? Or does the trench paver compact it a bit? Anyway I like it!!!
No. He is scraping off the exes material since its only the base layer.Later on we start to wet the edges with water. Also it depends on the operator how easy he can make it for everybody.
@seattlehawkins ok i agree it is a bit of a mess but the whole road was resheeted a couple of weeks later and the young boy was a lerner and i didnt have another job for him :)
base layer like OP says, also this looks like temporary patch after main repair that will get tore back up and then repaved totally... just had this kind of work done by city all over neighborhood... suck it yall
Fred et Zana Because down here in Australia we don’t use the emotion on semi temporary work since the whole road was deep lifted (about 6 inches) later on.
Travis Kelley come down here to Australia.... see how many minutes you would last here mate even this was a middle of winter with the lowest temp around 20 C (68 F) and in summer as high as 47 C (116 F) ..... make sure to bring in at least 6 litres (1.5 gallons) of h2o per shift
@@southaussiegarbo2054 we dont work under 40F. The hotter the better in my opinion. As a lute man, I can say it absolutely sucks working with rapidly cooling material.
Do your man on the roller not know that you put the roller half way on the old road and half on the joint other wise the roller would drive down the Tarmac and leave a lip. I think you be quicker doing it by hand. It's ok on base but topping it would a bit messy.
COREY GRB5H the first one to be the next day. I'm, I have a lot more than just 20th. We will have the right, but the best. ?MJAMNZMJMKJZMIAMJMSJIS. JUSNUWNUOWNUIWMUUW. ?JXMAMIA UA IAW? IAUJUAM8KAI, ??????????????...????????????.........?????????????NUMISMATIC MS
MrCzech78 anyone that can't see that by looking at the lip has either never done construction work before or they are simply retarded labors that you would have to yell at all day long lol
Man if you don't know asphalt you shouldn't be talking I work heavy construction for my employer we do asphalt alot if you think asphalt work is clean you are wrong it's going to be worse before it gets better is stars off messy you come in behind yourself and clean it up
I really like that trench paver attachment :-)
Good job
a mi sobrino le fascina la catapila
😀❤💜💛💚💞 💖 👍 the same time, I have a
Cool little attachment beats the hell outa the way we do trenches, hey why doesn't the guy on the ac joint just bump in the excess rock with a rake before the roller hits it? Would be faster and cleaned then scraping with a shovel? Or does the trench paver compact it a bit? Anyway I like it!!!
The wheels go to the very edge of the trench, so any overflow gets compacted.
You shovel it in the ditch, bobcat dosen't compact it enough to get it off the existing, clean up mess when you go!
No. He is scraping off the exes material since its only the base layer.Later on we start to wet the edges with water. Also it depends on the operator how easy he can make it for everybody.
bua me encanta
@seattlehawkins ok i agree it is a bit of a mess but the whole road was resheeted a couple of weeks later and the young boy was a lerner and i didnt have another job for him :)
more plz
the learner kid is dropping the gravel right?
Have you ever thought of using a live bottom dump truck and unload in the trench just ahead of the strike?
Mike Trudeau that’s exactly what it’s designed for 👍
That's how union Pavers do it, with truck dumping in ditch.
I want get this Accessories. how I can get it?
lol it's amazing how many people are commenting and have no clue what they are talking about!
I've been paving for 31 years, agreed
base layer like OP says, also this looks like temporary patch after main repair that will get tore back up and then repaved totally... just had this kind of work done by city all over neighborhood... suck it yall
Hi,
I can see that the pavers name is Gator. I can not find it anywhere. Can anyone help me?
That's the company that make the attachment
Where is the MC1
Hurry Bobcat Hurry!!! oh the suspense!
Hello, why there is no emulsion of bitumen to link it? Sorry for English, i am french
Fred et Zana Because down here in Australia we don’t use the emotion on semi temporary work since the whole road was deep lifted (about 6 inches) later on.
well thats just dumb
@@zurkeyturkey7636 smart actually.
I've done aphault it's hot and it stinks it's a good job when it's 30 degrees out but hot as hell when it a 90 degrees day
Travis Kelley come down here to Australia.... see how many minutes you would last here mate even this was a middle of winter with the lowest temp around 20 C (68 F) and in summer as high as 47 C (116 F) ..... make sure to bring in at least 6 litres (1.5 gallons) of h2o per shift
@@MrCzech78 they won't last a couple hours
You clearly dont have much experience in asphalt. Youre dead wrong if you think its easier when its 30 degrees vs 80/90 degrees.
@@Fuck_Tarentum_Boro agreed. 30dergrees f is 0celcius so is very cold.
@@southaussiegarbo2054 we dont work under 40F. The hotter the better in my opinion. As a lute man, I can say it absolutely sucks working with rapidly cooling material.
Do your man on the roller not know that you put the roller half way on the old road and half on the joint other wise the roller would drive down the Tarmac and leave a lip. I think you be quicker doing it by hand. It's ok on base but topping it would a bit messy.
John Brett anyway you do it makes a mess. And it looks like they are going to put another finish coat on top since they left what looks like a 1" lip
John Brett
Ppx
John Brett k
COREY GRB5H the first one to be the next day. I'm, I have a lot more than just 20th. We will have the right, but the best. ?MJAMNZMJMKJZMIAMJMSJIS. JUSNUWNUOWNUIWMUUW. ?JXMAMIA UA IAW? IAUJUAM8KAI, ??????????????...????????????.........?????????????NUMISMATIC MS
It's a base lift dumbass!
Ham bhi op Ha
ok
It's only the base layer
MrCzech78 anyone that can't see that by looking at the lip has either never done construction work before or they are simply retarded labors that you would have to yell at all day long lol
Ectuly that called yuo have to do the pinch first and then the middle part of yuor patch
They make pavers that size just for that purpose the guy on the lute is using it like a feather dust too much clean up afterwards
Yep and even if it's a larger paver, run half the screed and bump feed it.
HI
HI.
Yeeezus christ. Come to sweden and we Will learn you guys how to do it
Perhaps you want to know that this was only a corrective layer before the whole road got new top layer over the lot.... pal
Oscar Legnesjö Yes make like Ron Jeremy and fuck off
Proper way to say it is “ we will teach you how to do it” If you’re going to criticize someone at least speak proper English.
장비 두대나붙여서 깔끔하지도않고 비효율적이야
포달김선생 sure
l. love. my. mommy
Poor work,no bonding agent on the joint,etc etc,I bet those tire marks ,from the bobcat,are still there.
Pete Smith this is only the base layer. They will prob put tack down before they put the top coat on. If it's in the contract
Anthony A
3DS
Pete Smith Dixie Road
Javier Lee-Biddle what's 3DS?
Pete Smith p
🤦🏻♂️ where are the experience 🤷🏻♂️
arturo velazco Sydney Australia
Man if you don't know asphalt you shouldn't be talking I work heavy construction for my employer we do asphalt alot if you think asphalt work is clean you are wrong it's going to be worse before it gets better is stars off messy you come in behind yourself and clean it up
Or just dont be messy.. saves yourself from alot of work at end of day/job and your boss saves time. Especially residential, they're too picky.
They are doing a magnificent job,
@@XELIT3H3ADSH0TX this job will be messy no matter what
No pues que desmadre es lo k miro comprense mejor una Pat paver