    We ended up pouring this garage floor about a foot thick because the excavation contractor didn't grade the sub-grade to the right level.
    The general contractor didn't check his work before the heating contractor installed the styrofoam and radiant heat so there was no way to re-grade the floor without tearing out all the styro and heating tubes.
    The GC decided to just pour the concrete extra thick so that's what we did.
    There was also an issue with the slope being excessive, 6 inches from back to front in 27 feet.
    After talking with the home owner we changed the slope to 3 inches. See if pouring 12 inches of concrete is easier than 5 inches.
    EMAIL ME - www.everything-about-concrete...
    LEARN FROM ME - PRIVATE MEMBERSHIP AREA:
    www.theconcreteunderground.co...
    GARAGE FLOOR EPOXY FLAKE COATING COURSE:
    www.theconcreteunderground.co...
    MY STAMPED CONCRETE COURSE:
    mike-day.mykajabi.com/offers/...
    MY CONCRETE SLAB COURSE:
    mike-day.mykajabi.com/pl/79570
    FOUNDATION CRACK REPAIR COURSE:
    mike-day.mykajabi.com/offers/...
    GARAGE EPOXY FLOOR COATING COURSE:
    mike-day.mykajabi.com/offers/...
    VISIT MY WEBSITE:
    www.everything-about-concrete...
    USE THE SAME TOOLS I DO:
    36" MBW POWER TROWEL:
    imp.i284638.net/oeRMmn
    ScreeDemon Gas Powered Vibratory Screed:
    imp.i284638.net/4ZKEL
    Screedemon Battery Powered Vibratory Screed:
    imp.i284638.net/LzdBo
    14' Screed Board for ScreeDemon:
    imp.i284638.net/QOPDZM
    MARSHALLTOWN SHOCKWAVE VIBRA-SCREED:
    amzn.to/2tZ79ti
    TOPCON LASER LEVEL:
    amzn.to/2VrJ3zV
    DEWALT PENCIL VIBRATOR TOOL:
    amzn.to/2Km5Zis
    INVERTER GENERATOR LIKE WE USE:
    amzn.to/2XfWfwe
    BULLFLOAT:
    amzn.to/2U1Kx2F
    HAND FINISHING KNEE BOARDS:
    amzn.to/2TZmTUj
    MAG FLOAT & STEEL TROWEL SET:
    amzn.to/2IgmDOq
    2" MARGIN TROWEL:
    amzn.to/2G33KNn
    CONCRETE PLACER OR KUMALONG:
    amzn.to/2I00gxp
    CONCRETE FINISHING BROOM:
    amzn.to/2UytU2B
    CONCRETE SCREED:
    amzn.to/2WZxtwm
    CONCRETE EDGER:
    amzn.to/2GbGkEp
    CONCRETE GROOVER:
    amzn.to/2PaL414
    BOSCH HAMMER DRILL:
    amzn.to/31AHnaN
    MY RECOMMENDED TOOLS PAGE:
    www.everything-about-concrete...
    SUBSCRIBE to my email list and get my FREE video guide on how to get the perfect broom finish on a concrete patio:
    forms.aweber.com/form/44/2003...
    Follow me on Twitter:
    / creteexpert
    Follow me on Instagram:
    everything_...
    Follow my Facebook Page:
    / everythingaboutconcrete
  • ХоббиХобби

Комментарии • 370

  • @mib20000
    @mib20000 Год назад +20

    12" thick >> just in case you wanna park your D11 Dozer in your garage

  • @Harrisbuilt1
    @Harrisbuilt1 Год назад +3

    I’ve watched a few videos and have to say Mike your approach and narration during the videos is really easy to listen to and you’re a true pro. I don’t do a lot of concrete but I’ve picked up a few tips for sure.

  • @tnolan3176
    @tnolan3176 Год назад +47

    The home owner will be lucky if that floor heats up at all with the 12 inches of concrete on top of the heat tubes !!

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад +36

      It'll heat up, just might take a while. Then it'll stay warm longer also.

    • @nbco55
      @nbco55 Год назад +9

      @@MikeDayConcrete... one giant heat sink that's for sure.

    • @MuddyfeetConcretePumping
      @MuddyfeetConcretePumping Год назад +5

      I was wondering how effective the heating would be. Doesn’t seem like it would work very well being that thick

    • @devilmonkey
      @devilmonkey Год назад +6

      Heat rises people

    • @shannonbeyers9765
      @shannonbeyers9765 Год назад +3

      That was my thoughts. Conrete is a thermal conductor but at that depth and the size of tubing and total heating power it can produce I wonder if it is now ineffectual. It seems like radiant tubing has to be within the top 3-4 inches of the conrete surface to have any affect.

  • @davideyres955
    @davideyres955 Год назад +4

    Greetings from the UK. Wish our houses were built like yours, ours are tiny, garages you can’t get modern cars in let alone work on. Nice job there. Nice big slab that’ll take whatever the home owner puts on it, even big machinery like lathes and milling machines.

  • @Toto-is8ci
    @Toto-is8ci Год назад +8

    Really excellent team work. Everyone knows what to do and where to go. I did a concrete slab only once, 30 years ago. We did the forming, and the concrete (0rdered the concrete truck) in a construction class at a Community college. They had free labor in us, we poured a large slab for the County Fairgrounds. It was a lot of work and there even for 12 of us working on a 18X20 foot slab.

    • @DeuceGenius
      @DeuceGenius Год назад +1

      i could form and pour that by myself :)

  • @stevecorcoran9869
    @stevecorcoran9869 Год назад +17

    If I was the homeowner I would be seriously pissed if my GC didn't coordinate with the grade crew and the concrete contractor to the point I ended up paying for a foot of concrete in my garage.

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад +6

      The homeowner didn't pay for it, the GC did. It was their call to move forward the way it was.

    • @ronbusby4596
      @ronbusby4596 Год назад

      Never pour on someone else's drading job

  • @davidyoutz8379
    @davidyoutz8379 Год назад

    Your screeding is poetry in motion!

  • @robgee7788
    @robgee7788 Год назад +1

    I drove a mixer truck for about a decade and you wouldn't believe the stories.
    1. A home owner wanted 9 yards inside a cardboard form.
    2. Husband wasn't home so wife said to just put it over there and he will take care of it when he gets back.
    3. Homeowner wanted it so wet it looked like wash out for his garage floor so he could work it easier.
    4. Home owner ordered 3 truck loads too much and we sent them back to the batch plant loaded. Miscalculated by 27 yards.
    5. Flow filled Styrofoam walls wich of course broke and made a mess.
    I could go on and on....

  • @ChipsPlace1952
    @ChipsPlace1952 Год назад +5

    Mike,
    First of all Happy New Year to you and your family and crew. Another great video.
    I enjoy watching these types of videos because you point out the things to look for or you mention the posiible problems. One can get tired of seeing how things turn out good but I feel it's more important to know the bad things that would and could go wrong.
    Great work.

  • @jasonlane9266
    @jasonlane9266 Год назад +1

    I enjoy your videos being a old concrete guy. My knees keep from pouring anymore and I really miss it. I'm from Tennessee and we kick screed here to. That think of a floor is ridiculous, someone's got some explaining to do. Thanks for your content.

  • @jonfuller4368
    @jonfuller4368 Год назад

    I'm enjoying the banter with the first truck driver, I imagine he's one of the drivers you're glad to see.

  • @dirtcvma
    @dirtcvma Год назад

    Great video. Learned a few things. Thanks for sharing

  • @alexjames1146
    @alexjames1146 Год назад

    Very Satisfying.
    Thank you.

  • @mehmet284
    @mehmet284 Год назад

    amazing job mike happy new year

  • @number40Fan
    @number40Fan Год назад +7

    I'm just here for the "When Mike isn't looking, the wire doesn't get pulled", crowd. 😎

    • @ArthurDentZaphodBeeb
      @ArthurDentZaphodBeeb Год назад +1

      That thin wire in that thick a slab is nearly worthless.

    • @number40Fan
      @number40Fan Год назад

      @@ArthurDentZaphodBeeb In this case, I would agree. I'm guessing the trucks were already on the way, otherwise, I would have aborted the pour myself.

  • @alk7142
    @alk7142 Год назад +3

    You said it was spec'd out at 6" slope on the plan, don't blame the excavator for making it so.

  • @bioniclife
    @bioniclife Год назад +5

    Might need to add hip waders to the truck for pours like this.

  • @rbrazz
    @rbrazz Год назад +1

    So the GC eats $1900 in extra concrete and the homeowner is basically out the cost of the radiant system and pays for all the future bottom of the slab underside heat losses. Output drops off as tubing depth increases. The highest output occurs when the tube is centered about 3/4-in. below to the slab surface (about 25 Btu/hr./ft2 at 100° F water temperature). Lowering the tube another inch into the slab reduces output to 24 Btu/hr./ft2. Taking it down yet another inch lowers the output to 22.3 Btu/hr./ft2. However, when the tube is located at the bottom of 12" slab the output is only 7.6 Btu/hr./ft2 -OUCH. On the plus side they can feel free to park a 85 ton John Deere 870G excavator any time they want.

  • @terrancesnyder9323
    @terrancesnyder9323 Год назад

    GOOD MORNING & HAPPY NEW YEAR

  • @andrewcrawford5601
    @andrewcrawford5601 Год назад +2

    Awesome awesome job u and ur guys did Mike be safe and always be careful doing what y'all do each and every day buddy

  • @TBrownRecords
    @TBrownRecords 11 месяцев назад

    You did a great job

  • @kalmanszeles8666
    @kalmanszeles8666 Год назад

    great-great job boys

  • @byugrad1024
    @byugrad1024 Год назад +4

    Just think of the car lifts you could install in that slab. No issues with bolting anything into that thing!

    • @DB-yj3qc
      @DB-yj3qc Год назад

      Be able to install a heavy equipment lift for say the concrete delivery truck.🤪

  • @robertknoll8439
    @robertknoll8439 Год назад

    Wow.. It's New Years Day;Happy New Year Guys... Totally agree that Grade should have been taking care of,with the hse foundation being a issue/ur First pour I'd have had Grade checked everywhere else..Crazy man,but u guys did a Nice job.I work construction, Concrete,Aspault,Mach. That's alot of Concrete right there

  • @beachboardfan9544
    @beachboardfan9544 Год назад +2

    Doesnt organic material rot under concrete?

  • @JoshHighley
    @JoshHighley Год назад +4

    Any concern with the radiant heat being able to heat that huge mass of concrete? I'd imagine there will be a lot of lag between the radiant turning on and the heat energy actually getting through to the garage space.

    • @99eewing
      @99eewing Год назад

      Radiant heat is recommended (by manufacturer) to be no more than 2" from the top of the concrete.
      The deeper it is the less efficient it is (I figure with that depth they're not gonna be happy with their gas/electric bill. Whichever is the one warming the water tank for the system).

  • @johnperez93640
    @johnperez93640 Год назад

    Man, concrete is soo much fun to pour. Ive paid people to let me help on big jobs whenever driving by one at random.

  • @doncrist2012
    @doncrist2012 Год назад

    Happy new year

  • @MrBrewsk
    @MrBrewsk Год назад

    I like the one guys idea of a booster, Capt Morgan's LOL. Merry New Year to all.

  • @jboz1435
    @jboz1435 Год назад +3

    I’m not in construction and probably never pour concrete but I watch this whole video-on New Year’s Day , looked nicely done, I was waiting for a fail.. but I get it now. Great job. Happy New Year 2023. Thanks for all your great videos.

    • @brianbabb6666
      @brianbabb6666 Год назад +2

      I did concrete work when I was young and I will say these guys are good at their trade.

  • @doyourbest7655
    @doyourbest7655 Год назад +1

    Shrinkage and expansion are real problems, so there is a reason why there is a code for minimum reinforcement. That video that shows small gauge welded wire fabric is interesting. You are right somebody should get back from vacation and supervise this job

  • @timp3035
    @timp3035 Год назад +1

    Nice Job!

  • @stuartandrews4344
    @stuartandrews4344 Год назад +3

    Going to take a very long time for under floor heating to heat up a 12" slab.🤣

    • @2Truth4Liberty
      @2Truth4Liberty Год назад

      That's not a bad thing because it would hold heat longer too (heat sink).
      Also, better too thick than too thin.

  • @andrewwhitnet3557
    @andrewwhitnet3557 Год назад +1

    Great job.12inch?it was almost over the top of their wellies at this end!

  • @MW-yd4nk
    @MW-yd4nk Год назад +1

    radiant floor is great idea but what happens if there's a problem? Gotta dig up the slab?

  • @robert.89
    @robert.89 Год назад +5

    How effective is this heated floor going to be when it under 12 inches of slab?

    • @marklanese5594
      @marklanese5594 Год назад +1

      I was about to pose that very thought.

    • @duanesamuelson2256
      @duanesamuelson2256 Год назад +1

      It only makes a difference for the lag time to bring it to temp or for cool down. It has more thermal mass is all

    • @joesweeny8093
      @joesweeny8093 Год назад

      Typically 1" to 2" below surface. Is most efficient! Seems like ya'll did a great job at finishing that concrete though! Hopefully it don't take five years for that new homeowners boiler system to heat the concrete up.

  • @robertsharman3599
    @robertsharman3599 Год назад

    Just discovered your videos Mike - you do a great job. I’m looking at building garage in a rural area. Trying to get knowledgeable when talking to trades. Garage is going to be about 25’ deep. What slope should one have? You make comment in this video about 3” over 28 feet. Is there a rule of thumb?

  • @robertsmith2956
    @robertsmith2956 Год назад +1

    Is that going to mess with the in floor heating so far under the concrete. I see the tubing under the rebar.

  • @robertapreston4200
    @robertapreston4200 Год назад

    Mike.... you guys always do great work...
    This time though, the wire wasn't off the ground and only second were pulled up... it happens in 12" off concrete

  • @mcrane2653
    @mcrane2653 Год назад

    Hi Mike, Thanks for your videos. Do you happen to have a video where you poured a slab patio that the owner was considering one day possibly building over at least part of it?

    • @gauravvij67
      @gauravvij67 Год назад

      In Europe there would be two pours, first the 4 inch subfloor, then on top of that insulation, then the radiant heat on top with a fast warming thin liquid screed self levelling covering that. Much better

  • @myronkrysko4059
    @myronkrysko4059 Год назад +3

    That's a lot of concrete to heat up will in floor heating even work?

  • @jackbrown6913
    @jackbrown6913 Год назад

    Watching from Australia. Here, the "reo", steel mesh, is held up by placing plastic "saddles" or supports under it to situate the steel in the middle of the poured concrete. Is that not done in the USA??

  • @Z-Bart
    @Z-Bart Год назад +3

    Wow. That adds to the cost substantially when the sub grade is that far off.

  • @t-rex4211
    @t-rex4211 Год назад +2

    If the mesh is being used for rebar as well as holding the pipes then prop it up from below on cups, you’ll get adequate ‘cover’ and stop the rebar rusting and the concrete will be strengthened in tension. Bottom 1/3 so 4” up if 12” is the rule of thumb

  • @davidspeyers5740
    @davidspeyers5740 Год назад +1

    Truck driver was a class act!

  • @matt1074
    @matt1074 Год назад +1

    The radiant heat will probably be useless

  • @rsbolin
    @rsbolin Год назад +1

    I wish you were in the Greenville, SC area. I have grown to trust you from afar.

  • @roccoray227
    @roccoray227 Год назад +1

    will the radiant heat even work with it that thick?

  • @DJ-ob3mp
    @DJ-ob3mp Год назад +6

    I'm just wondering if the rebar is high enough for that much concrete.

    • @jeanious2009
      @jeanious2009 Год назад +1

      When concrete is that thick, you really don’t need rebar. If you’re going to use rebar then it would have to be at least 3/8” that wire mesh they used in the video is USELESS!!!!

    • @robertsmith2956
      @robertsmith2956 Год назад

      @@jeanious2009 Time for some pre stress cables perhaps?

  • @donmunro144
    @donmunro144 Год назад +1

    That was a very good expensive mistake. Surprised noone questioned it before the pour even started.

  • @mikemorgan5015
    @mikemorgan5015 Год назад +3

    Very nicely done. I like watching a crew that knows what their doing. Was that 6in slump or 6in slope on the plans? haha. Maybe they wanted them to back in so they could have a better running start out of the garage. What an incredibly enormous mistake in grading! Wow! I used to get my ass chewed over a 1/4 inch. Strange overhang detail there. Is that wood post supporting the steel beam permanent? I would have used a steel post for that, but wood is fine as long as it stays dry. That slab will certainly hold some serious heat once it get warmed up. No worries about piercing the radiant tubing using Tapcons in that slab.....

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад

      Thanks Mike!

    • @robertsmith2956
      @robertsmith2956 Год назад +1

      Should keep the rain water out if nothing else.
      Maybe it is so when you drive through the back wall of the garage, you don't damage the basement walls.

  • @shmulis1
    @shmulis1 Год назад +5

    Nice work, Why wasnt the wire pulled up?

  • @josephisaac3603
    @josephisaac3603 Год назад +1

    Will the heat come thru

  • @Mids1970
    @Mids1970 Год назад +1

    customer gonna wonder why the hell his heated floor don't work.

  • @joeleble2425
    @joeleble2425 Год назад +7

    I assume you’re going to need extra deep cuts for your relief cuts. Is the soft cut saw capable of going that deep ? If not, how do you get the relief cuts done adequately?

    • @mikewest712
      @mikewest712 Год назад +2

      Great question.

    • @nbco55
      @nbco55 Год назад

      Probably have to use a Cut off saw in a cart for that depth. Soffcut usually has the 1.5"max depth cut on a 6" blade.

    • @jeanious2009
      @jeanious2009 Год назад +2

      12” concrete doesn’t require relief cuts, that whole slab is thicker than any 10 story foundation.

  • @DeuceGenius
    @DeuceGenius Год назад

    gj fellas

  • @frankgrant4784
    @frankgrant4784 Год назад

    Any chance we can get someone with a leaf blower to blow out all the debris before the ready mix concrete gets installed?

  • @2point..0
    @2point..0 Год назад

    @Mike Day Concrete, should charg' em extra for new sets of boots and jeans for the 3 of yea!!! I love the gruff talk, truckkkk driva!!! ha ha ha!!! Damm didn't know that you needed SUBA gear for flat work, ha ha ha!!!

  • @Ocean_breezes
    @Ocean_breezes Год назад

    Wow, what a feffed up design.

  • @VaporheadATC
    @VaporheadATC Год назад +2

    Wonder how effective that under slab heating will be with that much more concrete.

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад

      Not sure but I think it'll be ok once it's heated.

  • @megansmith1382
    @megansmith1382 Год назад +1

    I mean, obviously that is not a normal situation however, if it were to happen you couldn't have asked for better conditions. The fact that the concrete was already an hour and a half old by the time it got to you helped and then of course the weather was not baking hot in the sun and so on and so on. You boys went in, assessed the situation and made it happen and luckily like I said, the conditions on your side weren't worse. Great job. I really couldn't pull away from watching this episode. It looks incredible. I live in Oregon and I would hire your crew in a heart beat in any of my projects if you weren't on the other side of the states haha That is one way to end a year out haha I cant wait to see what 2023 has in store for you. See you in the next one.

  • @ericstyer2890
    @ericstyer2890 Год назад +2

    Hey Mike love your content. I cannot wait to pour my 40x60 slab after joining the Concrete Underground and watching all of your content. One question about the mix y’all use though. I emailed a company about what I was after - 4k psi, mid-high range water reducer, 6” slump, fiber mesh reinforcement. They said the fiber mesh they use is to prevent shrinkage, he made it sound like the fiber mesh used to actually reinforce was uncommon and only used on engineered jobs etc. Is their a specific brand of those additives you can expound on a bit either somewhere in the Underground or here? Thanks a ton appreciate you sharing a lifetime of experience with us.

    • @calebb2
      @calebb2 Год назад +9

      Don't put too much weight on the advice from the sales staff at the company you emailed. Just because contractors don't necessarily follow a best practice in your area doesn't mean that it's overkill or a bad practice! Just take a look at the average spec house from a national home builder... they can barely frame their houses competently.
      For these builders (who likely comprise a significant portion of the business for that concrete company you mentioned), they need to save every last cent to maximize quarterly earnings. They'll be buying 3500psi (or less, if possible!) concrete to save a few bucks. They certainly aren't going to be paying for extras like fiber mesh. Consider that fiber mesh may "only" cost you $8+ per yard for a retail purchase. For you (as the project manager / homeowner), that may only be an extra few hundred dollars, but for a national homebuilder completing 500 homes per year, that could be $100,000!
      Now, of course, any homeowner buying a new home for $250K - $1.5M+ would gladly pay an extra $150 for fiber mesh in their concrete if the cost/benefit was explained to them. But as I just described, this information is very far removed from the end user. Even if builders did explain this to the user, there's no way they could sell a home for $250,149 instead of $249,999 to recoup that expense, so material upgrades are almost always a cost center for national homebuilders.
      (I could go on; this doesn't just apply to concrete! Check out the sill plate for homes from national builders; For an extra $100 per house, they could upgrade to "ground contact" UC4A pressure treated lumber. But instead they pocket that $100 and almost exclusively use "above ground only" UC3B pressure treated lumber which has ~50% less wood preservative (and more headaches down the road for the homeowner!). A reasonable home buyer would certainly spend $100 in this area for the better material... but except for custom homes (where an engineer is likely specifying the wood quality and concrete fiber mesh ;)), there's currently no way for national home builders to "monetize" any material upgrades... so they're never even offered to the homeowner)
      In any case, that was the (long; sorry!) explanation for why concrete sales people find add-ons like fiber mesh to be "rare" or exotic; it's not that they're misleading you, the problem is that the majority of their business comes from contractors who are following the directions of upper management pencil pushers!

    • @morainemammoth
      @morainemammoth Год назад

      Hi Mike That must have worn you out having to walk through concrete that deep. Your crew and the driver seem to be good friends

    • @peters6850
      @peters6850 Год назад

      How is the underground? Is it a lot more detailed?

    • @ArthurDentZaphodBeeb
      @ArthurDentZaphodBeeb Год назад

      Check out helix micro reinforcing - tiny twisted steel that is added to the mix.

    • @magicone9327
      @magicone9327 Год назад

      Always use rebar if you want it to last! Use of fiberglass in place of rebar is not going to give yup the strength against stress fracturing. Wire mesh or rebar should be held up with plastic risers or concrete Dolby blocks with tie wire embedded into them to tie to rebar or mesh. Any structural rebar or wire that is not held within the slab at the proper depth will not give the ultimate strength. Adding of plasticizers in place of water to make it flow-and achieve a specific slump is a great way to get a higher PSI concrete. Less water greater strength. Always pour as dry as you can handle it and work it. Use high frequency vibrator to help with moving the concrete, removing air bubbles and bringing the cream to the top for an easier finish. Higher Portland concrete, like a six sack mix, will give much better quality in the long term.

  • @davemi00
    @davemi00 Год назад +1

    I’m still Attempting to wrap my mind around
    putting the garage floor over the basement.
    Either expand out the garage or shrink the basement.

  • @waterhammer5807
    @waterhammer5807 Год назад +1

    "I had booster the other day too, it's called Captain Morgan'" 😆

  • @johnnytyrrell7060
    @johnnytyrrell7060 Год назад

    With how tick the concrete is the heat pipe in it are going to do Feck all mite just stop it freezing

  • @dougbourdo2589
    @dougbourdo2589 Год назад

    Wow. Guess he'll never have to worry about weigh limits for vehicle parking.

  • @monikamccartney7096
    @monikamccartney7096 Год назад +3

    I'm wondering if the subgrade compaction failed, or washed out some? And is the floor heating going to work under that much concrete? Wow, big mistake. It looks great now though!

    • @lukasmitchell608
      @lukasmitchell608 Год назад

      This is the same thing I was wondering. I was thinking is the in floor heat even gunna work with a slab that thick.

    • @mikemorgan5015
      @mikemorgan5015 Год назад +1

      Sure. It's insulated underneath. It will take a long time to warm up and a long time to cool down, so even temps in the garage will be easier to maintain. Thermal mass is generally a good thing when constant temperature is the goal, but if you want more heat quick, it's not so bueno. If you turn up the heat in that garage, you may not see result for several hours.

    • @duanesamuelson2256
      @duanesamuelson2256 Год назад +1

      @@mikemorgan5015 the responses....they are clueless and don't read..you are absolutely correct and they are looking at the heat like they are a heated bathroom floor, which is heated to make it comfortable to bare feet.
      For constant temperature thermal mass is needed and if the heat source was geothermal or solar they would be looking at more mass..maybe 18"? Lol.
      Concrete isn't necessarily the most cost effective mass though.

  • @dutchymon
    @dutchymon Год назад

    Maybe 12" of concrete for rebar top and bottom for added flexural strength in the floor slab?

  • @RONNIEJNZN
    @RONNIEJNZN Год назад

    Wow, Looked like it was over the boots. Guess he'll be ok if he ever wants a automotive lift put in. Is that a heated floor ? Isn't that going to be a bit thick to feel the heat ?

  • @jeanious2009
    @jeanious2009 Год назад

    Well am glad that wire wasn’t pulled.

  • @sdextereo1
    @sdextereo1 Год назад +1

    The guy shooting grade must have dropped his laser. 🤣
    You guys ended up making it look good though
    It probably makes no difference, but we always vibrate our concrete.

  • @thepeloncool
    @thepeloncool Год назад +1

    What saw do you use to cut joints in at 12in thick concrete?

  • @jamestamu83
    @jamestamu83 Год назад +3

    When it's that thick don't you need to vibrate the concrete to remove the air pockets?

  • @BlainsTube
    @BlainsTube Год назад +1

    How long does a pour that thick take to cure 100%?

  • @davidgentz1731
    @davidgentz1731 Год назад

    Man you guys busted that out three guys man that's hard work

  • @thpiii5084
    @thpiii5084 Год назад +3

    When pouring that thick is thermal contraction, expansion not a problem? I thought that’s way bridges and such needed those oversized expansion joints. I work in wood and with using larger and larger pieces it’s a issue.

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад

      I don't think it'll be an issue here, maybe if it was in the middle of the summer and temps in the 90's. It's was cool this time of year.

    • @DB-yj3qc
      @DB-yj3qc Год назад

      @@MikeDayConcrete
      LoL

  • @CrustyAbsconder
    @CrustyAbsconder Год назад +1

    You should put time-capsules in your 12 inch pours. Somebody in 1,000 years will get a nice chuckle out of that.

  • @peters6850
    @peters6850 Год назад +5

    Will the extra thick concrete effect how well the radiant heat tubing works?

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад

      It will take a little longer to heat up to temp, but that's about it.

    • @peters6850
      @peters6850 Год назад

      @@MikeDayConcrete I'd assume it would also hold it's heat a little longer too. Which is good

  • @johnhurt1583
    @johnhurt1583 Год назад

    I hope you got the home owner to pay for the extra concrete and labor
    I just had a customer get me the ok but later try to back out of the agreement to a similar situation

  • @scyphuspanis5515
    @scyphuspanis5515 Год назад +3

    Well, that driver sure had a lot to say.

  • @philleach6271
    @philleach6271 Год назад

    Great wire placement 😂

  • @samdiamond7642
    @samdiamond7642 Год назад

    It would have been nice them to tell you that you needed the fishing waders instead of boots
    Thanks for sharing keep up the hard work love the
    Videos!!

  • @elplata7224
    @elplata7224 Год назад +1

    Hamstrings more sore x2? Hoochie mama!

  • @dwsscotty
    @dwsscotty Год назад

    thats where a measuring tape comes in handy lol lol try it next job

  • @peelingbackthemask5602
    @peelingbackthemask5602 Год назад +2

    Hi Mike. I've been binge watching your videos (and subscribed) and have picked up a lot of information from you and watching how you work, pour, finish, etc. you guys do great work.
    I have a question for you, if you would be so kind.... I am building a small 3/4 underground pool (we found a room under our back yard from an old construction that still has solid walls on 3 sides) that is 5 meters long by 1.5 meters wide. The depth goes from 35 1/2 inches on the shallow side to 5 1/2 feet at the deep end. I have scoured the internet trying to find what grade of concrete to use, and found nothing that says "use this grade for pools", so decided that M20 would be sufficient with 4" rebar reinforcement. Is that overkill for the size of the pool, or am I on the right track? Thank you and keep up the greats videos!

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад +1

      That'll be good, I don't think it's overkill.

    • @peelingbackthemask5602
      @peelingbackthemask5602 Год назад

      @@MikeDayConcrete Thank you. I guess I should have asked if M20 was necessary. The issue is the gravel ratio. We do not have easy access to our back yard as it's completely enclosed and we can't buy bagged gravel here (Mexico), so it is delivered loose and dumped in the front of the house and I would have to move it all to the back yard, which is no easy task. I'm currently using the gravel I get from separating the dirt from the gravel and rocks from digging out the area. Would a 1:1.5:2 mix work? And does the same mix apply to the walls? Thank you so much for your response :)

    • @peelingbackthemask5602
      @peelingbackthemask5602 Год назад

      Sorry for all the questions. It just that we've been ripped off on various occasions and had work done where the contractors didn't use the quality of materials they should have (like the carport, where the roof, which is going to have a bedroom built on it, they only used 4 inch rebar instead of 6 and the roof started to sag in the center, so we had a have a steel support beam installed under it) and decided that I'll do the work on the pool and learn at the same time to save money and headaches, so I want to ensure I'm doing everything as best I can.
      I do truly appreciate your advice and than you very much.

  • @damkayaker
    @damkayaker Год назад

    Reaching the upper limits of your boots! Look nice!

  • @chrisbrann7733
    @chrisbrann7733 Год назад +7

    If I had to guess, the earthwork guy read the specs and saw a 6” pitch and just went with it, I think that’s why you have such a deep slab in the front, but yes, you’re completely right, 6” pitch on a garage slab is pretty ridiculous, another nice job Mike, when all that mass heats up that floor, it won’t cool down til spring!

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад +3

      Crazy they spec'd a resi garage with 6" slope. Even the homeowner said it was too much.

    • @budkelly
      @budkelly Год назад

      @@MikeDayConcrete I wonder if the crazy slope was in relation to that overhung slab into the basement? Maybe the designer wanted to be really sure any snow melt would not travel to the back wall and down into the basement? Weird design all around.

  • @mikemaben7485
    @mikemaben7485 Год назад

    2big guys move faster than I imagined at first look.

  • @davereeves1967
    @davereeves1967 Год назад +1

    Man, the added cost to heat that extra material is some shit. Homeowner should be piiiiiiiiiissed.

  • @timmymonte9813
    @timmymonte9813 Год назад +1

    Pine needles are Gods fiberglass

  • @Anunaki2004
    @Anunaki2004 Год назад

    Hey Mike. Happy new year. And all the best going forward.
    I have a question. Can you tell us the prices from now on when you do your great work. On these different projects As you do the jobs? Thanks.

    • @JK-yf9sx
      @JK-yf9sx Год назад

      Prices? Of course not!
      (1) it's the customer's confidential business
      (2) next thing, some local cowboy will come along and undercut his quotes

  • @GrumpyAndCricket
    @GrumpyAndCricket Год назад +3

    I know you guys did your part, but sure seems like that grade issue should have been corrected? Just crazy for so many reasons and I could see you where thinking the same all the while you were pouring Mike. All the best in 2023!

    • @MikeDayConcrete
      @MikeDayConcrete  Год назад +4

      The GC was notified and it was their call. We had the same problem on the house floor, it was 8" instead of 4.

    • @nbco55
      @nbco55 Год назад +1

      Someone used a metric tape?.... Lol... That's nuts.

    • @GrumpyAndCricket
      @GrumpyAndCricket Год назад +1

      @@MikeDayConcrete Yep I thought that was the case.Keep on Keepin on!

    • @myronsmith2114
      @myronsmith2114 Год назад +2

      @@MikeDayConcrete The GC’s brother must own the concrete company

  • @jimskarw25
    @jimskarw25 Год назад +1

    Just wondering:
    Who eats the cost for the additional
    ‘crete?

  • @lanceleavitt7472
    @lanceleavitt7472 Год назад

    *_"No way 3 guys can finish 21-yards by themselves"_* --- Then I watched a Mike Day video upload. ---

  • @tomthompson7400
    @tomthompson7400 Год назад

    its only the top half inch that matters , or it will be tomorrow ,,
    bet that site has a great view on a good day though.

  • @realrayra
    @realrayra Год назад

    Bet the owner brought differnet crews in and put a basement bunker under that garage slab. And the 'overhang' framing is actually concealing the entrance.

  • @johnbaker3817
    @johnbaker3817 Год назад

    Is that a Darby somebody's using forehand Meg makes it a lot easier if you have the wrist for it use them on sidewalks and porches a lot

  • @joebisaillon3071
    @joebisaillon3071 9 месяцев назад

    Why no pump?

  • @salvadorsepulveda6415
    @salvadorsepulveda6415 Год назад +1

    At least no one lost a boot! Well, the owner can install a vehicle lift in the thick part, just sayn.

  • @nobleroofinggeneralcontrac7961
    @nobleroofinggeneralcontrac7961 Год назад +2

    $180.00 a yard in KC MO right now. How much in your neighborhood?

    • @rbrazz
      @rbrazz Год назад

      $185 in STL.