House Update, March 2, 2024

Поделиться
HTML-код
  • Опубликовано: 25 окт 2024

Комментарии • 7

  • @craigpacker7171
    @craigpacker7171 7 месяцев назад +2

    Slowly but surely!

    • @norwalfarm
      @norwalfarm  7 месяцев назад +3

      Thanks, Craig. We are at the stage where there is a lot of "behind the scenes" work that has to be done before the major transformations and finishing touches. We have a fantastic general contractor and everything is on schedule. Thanks for your comment.

  • @cindyboard7816
    @cindyboard7816 7 месяцев назад

    Having the walls enclosed really makes such a difference!! The acoustics in each room comes to attention and those beautiful views really pop!! Thanks for sharing!! Stay safe!!🙏❤

    • @norwalfarm
      @norwalfarm  7 месяцев назад

      Thanks Cindy! We noticed immediately the lack of echoing in the house once the insulation was installed.

  • @MaryKKeenehan
    @MaryKKeenehan 7 месяцев назад +1

    I love the view. Great that you might be in by November. You must be so excited😊

    • @norwalfarm
      @norwalfarm  7 месяцев назад +2

      We are excited. I am working on another house update video. The stone wall of the fireplace is finished as is the drywalling. They are starting to side the house next week. We also looked at samples of the staining and polishing of the concrete on the first floor. Much to do!

    • @MaryKKeenehan
      @MaryKKeenehan 7 месяцев назад

      Your forever home is awesome❤❤. I love the narrative Mike.