VC: Autodesk Navisworks: 16.07. Cost
HTML-код
- Опубликовано: 5 фев 2025
- It is possible to represent cost for equipment, for subcontractor, total cost for every single task and sum it in Timeliner. In this video, you will learn how add costs to the tasks in Timeliner.
Designed by Vysotskiy Consulting team. All videos and materials are available at bim.vc/en/base/
That was very helpful, thank you very much
do you know how to add separation or comma in Cost simulation?, for example 3,000,000,000
Thank you very much.
is there a way to calculate equipment, labour and material costs in Navisworks by insert unit rates?
can i get this Navisworks file ?